SP PowerGrid Endorsement

MWP No : 1210 054 114

F
NEW SP
O
TOPOGRAPHICAL SURVEY BOUNDARY
SPPG No :

R S
AVENUE
APPROVED LOAD: 8471kVA @22kV

U BSTATIO
PG LINE
N
SP PowerGrid Ltd
O

DP1 DP2 N=35448.5102 N=35461.2452


ENG NE

E=24126.3915 DP3
Distribution Planning Section

DP
E=24081.8895

4
Electric Substation Site/ Layout/ Misc Details is /are acceptable
N=35474.8823
subject to approval of building Authority
D=22.12m D=46.29m D=49.82m
N=35441.9574 D=28.82m E=24033.9717 Type of Substation:22kV(Temp S/S)
E=24149.2888

100
50
00 CR202 ACCESS ROAD

Date:_______________________ _____________________________
Goh Li Qing
Subject to revision 18 months f. Dy Director (DPL)

15
after this date SP PowerGrid Ltd
As agent for and on behalf of

0
SP PowerAssets Ltd
TOPOGRAPHICAL SURVEY BOUNDARY

D=
49.
85m
Y
DAR

Y
N

AR
OU

D
B

N
E

U
XI

VE

BO
S

UR

Y
T

VE
S
IN

R
G

PH

CA

U S
CO

HI

L
AS

CA
N

A
N=35520.5556

I
E

H
OG
EA

AP
E=24014.0059

1B

P
L

R
TO
10

ED

OG
25

P
/

AC

TO
C

JP
PH
/ SE

5
R

A
/D

SS
P

SE
/S /TM

1A
ZZ
W D/
JV/C
S
/O
02
LEAD-IN PIPE ROUTE LAYOUT PLAN
C R2
SCALE 1:300 D/

ENG NEO FAIRWAY


AVENUE DRIVE SURFACE DRAW PIT C/W REINFORCED
22120 CONCRETE COVER
(SEE DETAIL-STD 2210-211)
15796 28820
SURFACE DRAW PIT C/W REINFORCED
15982
CONCRETE COVER
+20.162m SHD +20.148m SHD +20.116m SHD PROPOSED ROAD
+19.961m SHD (SEE DETAIL-STD 2210-211)
DP 1 +19.668m SHD

MATCH 1-1
PROP 1.6m (w) EXISTING 0.3m (w)
1500

BOX CULVERT OPEN-DRAIN +18.861m SHD


+18.574m SHD +18.518m SHD
IL : 18.912 IL : 18.912 DP 2
1000

1350

+17.418m SHD Rev. Description Date


13°

2 ROWS OF 4 NOS Ø150MM UPVC CABLE


PIPE BEND SUBJECTED TO LEAD-IN PIPES ENCASED IN CONCRETE


+17.562m SHD
PASSING OF MANDREL TEST EXISTING ROAD FOR ACCEPTANCE
Qualified Person Endorsement :

LTA Endorsement :
46290

SURFACE DRAW PIT C/W REINFORCED


CONCRETE COVER
+17.387m SHD (SEE DETAIL-STD 2210-211)
MATCH 1-1

MATCH 2-2
PROPOSED ROAD
49820

+16.201m SHD
+15.773m SHD
DP 3 Owner :

+15.014m SHD
+14.673m SHD
+14.091m SHD
2 ROWS OF 4 NOS Ø150MM UPVC CABLE
EXISTING ROAD Main Contractor :
LEAD-IN PIPES ENCASED IN CONCRETE
OBAYASHI - STECS CR202


JOINT - VENTURE
PIPE BEND SUBJECTED TO OBAYASHI
PASSING OF MANDREL TEST
Consultant :

AECOM Singapore Pte. Ltd.

Project Title :
49850
CONTRACT CR202
SURFACE DRAW PIT C/W REINFORCED DESIGN AND CONSTRUCTION OF BORED
CONCRETE COVER SURFACE DRAW PIT C/W REINFORCED
EXISTING ROAD CONCRETE COVER TUNNEL BETWEEN FAIRWAYS DRIVE AND SIN
MATCH 2-2

MATCH 3-3
(SEE DETAIL-STD 2210-211)
PROPOSED ROAD (SEE DETAIL-STD 2210-211) MING WALK AND ASSOCIATED WORKS.

+13.953m SHD +13.934m SHD Drawing Title :


DP 4 +13.825m SHD +13.716m SHD +13.683m SHD
JP 5 22kV TEMPORARY SUBSTATION
+12.853m SHD LEAD-IN PIPE ROUTE LAYOUT PLAN
+12.583m SHD
AND ELEVATION (SHEET 1 OF 5)
2 ROWS OF 4 NOS Ø150MM UPVC CABLE Designed Checked Approved
LEAD-IN PIPES ENCASED IN CONCRETE MZH RY MK

Scale Drawn Date


As shown TTA 09/06/2023

Drawing No : Rev

D/CR202/OSJV/CWD/ZZ/S/TMP/DR/SEC/2509
LEAD-IN PIPE ROUTE ELEVATION
SCALE 1:100 CAD File Name : D_CR202_OS_JV_CWD_ZZ_S_TMP-DR_SEC_2509~2513_09.06.2023.dwg Sheet 1 of 1 A1