Professional Documents
Culture Documents
Grade 8 Tech June 2019 Memo 1
Grade 8 Tech June 2019 Memo 1
TECHNOLOGY
TERM 2 MEMORANDUM
JUNE 2019
GRADE 8
Marks : 100
1
RAMOTSHERE MOILOA SUB-DISTRICT TECHNOLOGY GRADE 8 MEMORANDUM JUNE 2019
2 2.1.1 A Rafter√ 1
B –K post √ 1
C Queen post√ 1
D Strut√ 1
E Tie beam√ 1
5
2.1.2 Pitched roof√ 1
2.1.3 The roof will bend or break√√ 2
2.1.4 a) Fracture√ 1
b) Bend √ 1
c) Topple over√ 1
11
3 3.1 A design cause the bridge to collapse√√ 2
3.1.1
3.1.2 Compression /bending force√ 1
3.1.3 Weight of cars√ 1
3.1.4
2 MARKS FOR RIGID
COLUMNS
2 MARKS FOR ARCH 4
STRUCTURE
2
RAMOTSHERE MOILOA SUB-DISTRICT TECHNOLOGY GRADE 8 MEMORANDUM JUNE 2019
b) Truss bridge√ 1
c) Cable stayed bridge√ 1
11
4 4.1
Line convention Name of line / Type Property
8
8
5 5.1 LVP √ √ RVP
√ √ √
√
15
√ √
3 marks for the cube
5 marks for shading
16
6 6.1 3
6.1.1 Driver√, idler and driven gear
6.1.2 Changes the rotation of the two gears in the same direction√√ 2
6.1.3 a) Clockwise √ 1
b) anti-clockwise√ 1
c) Clockwise √ 1
6.1.4 output gear
Gear ratio= input gear√
10 4
= √
20
= 2:1√
6.1.5 Slow√ 1
3
RAMOTSHERE MOILOA SUB-DISTRICT TECHNOLOGY GRADE 8 MEMORANDUM JUNE 2019
8.1.2 sides√
corners√
tabs√
scored
and
folded√
4
RAMOTSHERE MOILOA SUB-DISTRICT TECHNOLOGY GRADE 8 MEMORANDUM JUNE 2019
TOTAL