Job activity description: Instalasi electrical Houset [Pembongkaran Scaffolding] Date: / / 2023
Work-order number: ZULU/PO17/HC/027 Job Requestor: A. RAHMAN Work area: Refenery / Water Press
Company: PT. SARITECH PRATAMA MANDIRI
Is there any LIFEsaver or SIF precursor involved? ( ) No (Tier 1 - Move to step 8) ( ) Yes (Tier 2 - Continue filling out the PJHA)
( ) Barge/Ship Operation
( ) Equipment Failure
( ) Machine/Conveyor Guarding
( ) (V) ( ) ( ) ( ) ( ) (v ) ( ) ( ) ( ) (v) () ( ) Mining Operation
Motor Vehicle Working at Lockout Tagout Mobile Ralicar Safety Electrical Work Hazardous Bulk Material Confined Excavation and Hot Work Lifting and ( ) Animal/Biological
Traffic Safety Height Equipment Materiais Handling/ Space Entry Trench Work Rigging
Storage ( ) Other
Is a PtW (Permit to Work) needed or any other additional check list? ( ) Yes ( ) No
If Yes, what are they?
Step 4: Define task specifics STOP criteria Step 5: What is the worst case scenario and its Step 6: Emergency preparedness Step 7: Quality Review
consequences?
(What are the conditions to cause ME to STOP that (More than one worst case scenario may exist)
job?)
1.Tidak Menggunakan APD lengkap dan Full body Pekerja lalai dan bekerja tidak sesuai dengan 1.Cek APD sebelum bekerja
Harness prosedur bisa menyebabkan Bahaya terburuk : 2.Sudah dilakukan TBM
2.Pemasangan Oleh Orang yg tidak kompeten 1.Jatuh Dari ketinggian 3. Determining Control
3.Scaffolding belum di inspeksi dan di Tagging 2. Kesetrum/Terkena arus tegangan listrik 4. Membuat SOP Pemasangan Scaffolding yang
4.Overloading [melebihi beban yg ditentukan 3. Terkilir Karena Posisi Kerja tidak argonomik di validasi pimpinan perusahaan Cargill Representative Quality Review
5.Overhead Lines [saluran Listrik] 4. Tertimpah Falling Object,Scaffolding roboh 5. Membuat JSA disetiap Pemasangan Scaffolding (Print Name)
karena Overloading
Yes No
(v) ( )
Step 8: Workers accepting PJHA, and will work according the identified herein:
Task Leader: Name: Name:
SUWANDI DWI
Teams quickly debrief the task they planned and consider anything that they missed, would change, or even assumed correctly after the task is complete:
( ) Yes ( ) No
( ) 2nd shift Revalidation ( ) 3rd shift Revalidation ( ) 4th shift Revalidation ( ) 5th shift Revalidation
Have tools and equipment used during the
task been removed and accounted for as __/__/____ __/__/____ __/__/____ __/__/____
well as the area being cleaned and debris Starts at: Starts at: Starts at: Starts at:
removed upon completion?
Finishes at: Finishes at: Finishes at: Finishes at:
( ) Yes ( ) No Cargill Rep.: Cargill Rep.: Cargill Rep.: Cargill Rep.:
Task Team Lead: Task Team Lead: Task Team Lead: Task Team Lead:
If additional steps. Hazards and controls are needed for the task, use the area below labeled Annex
Step 1: Describe the job steps Step 2: Identify the Hazards of the Job Step in the field Step 3: Control Measures
(Identify critical steps with SIFp with an asterisk or highlight ) (Ensure STRONG control measures are in place to eliminate/mitigate SIFp risks)
(Ensure STRONG control measures are in place to eliminate/mitigate SIFp risks)
3. House Keeping Bahaya tersandung material,tertimpah material,terpeleset dan 1.Rapikan sisa material Scaffolding
tertusuk 2.Buat rak untuk material sisa Scaffolding
3.kumpulkan clam sisa dalam satu wadah agar tidak tercecer
4.Hindari meletakan kawat pengikat disembarang tempat
Step 8: Workers accepting PJHA, and will work according the identified herein
Task Name: Name:
Leader:
Teams quickly debrief the task they planned and consider anything that they missed, would change, or even assumed correctly after the task is complete:
( ) Yes ( ) No
( ) 2nd shift Revalidation ( ) 3rd shift Revalidation ( ) 4th shift Revalidation ( ) 5th shift Revalidation
Have tools and equipment used during the
task been removed and accounted for as __/__/____ __/__/____ __/__/____ __/__/____
well as the area being cleaned and debris Starts at: Starts at: Starts at: Starts at:
removed upon completion?
Finishes at: Finishes at: Finishes at: Finishes at:
( ) Yes ( ) No Cargill Rep.: Cargill Rep.: Cargill Rep.: Cargill Rep.: