SOLAR PANEL SOLUTION
Charge
MPPT
100A
Solar Panel
12@450W = Combiner Solar PV Cable line 21.6Kw SOLAR ON 28.8Kw INVERTER WITH 42.2Kwh
5.4KW 1 BACKUP BATTERIES
OUT
BATTERY BANK (4PCS) DC Battery Cable line 7.2KW GAS ADMIN LOAD
DC
Backup in Event of Low-Sunlight
HYBRID - A/C 1qty@1.5HP
220AH@48V=10.5KWh
AC
INVERTER - Chiller 1qty@1HP
- Chiller 1qty@0.5HP
Solar Cables - Freezer 1qty@350W
Controller
DB
SOLAR PANEL
Charge
- Bore-Hole pump
MPPT
100A
Solar Panel
12@450W = Solar PV Cable line
Combiner 1qty@1HP
5.4KW 1
Total Load approx.:
OUT
L1
3.6Kw 1-Phase
7.2KW
DC Battery Cable
DC Battery Cable
DC
DC
Breaker HYBRID
GAS BUSINESS LOAD
AC
INVERTER
- Canopy lights
Solar Cables
44qty@10W
Controller
SOLAR PANEL
Charge
- Price light@ 200W
MPPT
100A
Solar Panel
12@450W = Combiner
80A - 8 Fuel Pumps @ 750W
5.4KW 2 - GAS Pump 3-Phase @
3-Phase
OUT
L2 4HP
Schneider
BATTERY BANK (12PCS) 7.2KW Contactor Total Load approx.:
DC BUS BAR
DC BUS BAR
DC
AC
INVERTER
31.6Kwh
The Off-Grid Solar System will be
Solar Cables
configured for only Generator Input
Controller
SOLAR PANEL
Charge
100A
Solar Panel
12@450W = Combiner sunlight during heavy rain to allow the
5.4KW 3 batteries receive enough charge so
OUT
DC
Breaker HYBRID BACKUP
AC