Factory Renovation (Terrazzo)

Item No. Description Rate Qty Amount


Materials
1 Chippings 45.00 1000 45,000.00
2 Cement 100.00 120 12,000.00
3 Divider Strips 35.00 400 14,000.00
4 Mchine for Cutting 250.00 20 5,000.00
5 Stones 150.00 20 3,000.00
6 Disc 150.00 10 1,500.00
7 Polish 330.00 60 19,800.00
Subtotal 100,300.00

8 TnT 1,500.00 1 1,500.00


9 Workmanship 19,500.00 1 19,500.00
Subtotal 21,000.00
Total 121,300.00

Factory Renovation (Carpentry)


Item No. Description Rate Qty Amount
Materials
1 2X2 32.00 50 1,600.00
2 2X4 60.00 15 900.00
3 T&G 500.00 17 8,500.00
4 Corner Mode 40.00 15 600.00
5 4" Nails 80.00 1 80.00
6 3" Nails 80.00 1 80.00
7 Polycoat 1,000.00 18 18,000.00
8 Fiber Materials 45.00 50 2,250.00
Subtotal 32,010.00

9 TnT 1,000.00 1 1,000.00


10 Workmanship 5,300.00 1 5,000.00
Subtotal 6,000.00
Total 38,010.00