Thermal expansion of main steam loop.

Note: No mechanical expansion joints are envisaged.

x = anchor
loop = U-piece
est. P-drop ~1 barg
Main Loop 6 or 8" - seamless steel sch-40
(pickled and passivated) S=

T1
T2
clean utility space ΔT
+9 CoE
end loop +9.5 x
STS 35 m V+STS
76 mm exp
9.08 elevation D=
D=

44 m
slope 1:200 loop 95 mm exp

loop
x STS
Ph. 2 - 6" V STS 2H
x H

elevation 9.3
L
9
+ 5
+ 3
3,110 Kg 45
141
30 (amb) 44
175.5 (8 barg) 35
145.5 282
14.9
5 x loop 20
S = (6 × (10^5) × D × X) ÷ L² TL 302

162 mm 9m
0.02 x 10.84 mm exp
+6>+9 +1 >+6 V+STS boiler room
9.3
loop
45 m 98 mm exp

loop
306 mm exp x STS
141 m 2H STS
x H x

slope 1:200 elevation 10 +9 >10


90* V Tee STS
22 3 3 7

boiler room
Thermal expansion of main steam loop.
Note: No mechanical expansion joints are envisaged.

x = anchor
loop = U-piece
est. P-drop ~1 barg
Main Loop 5 - seamless steel sch-40
(pickled and passivated) S=

T1
T2
clean utility space ΔT
+9 CoE
end loop +9.5 x
STS 3.6 m V+STS
8 mm exp
9.1185 elevation D=
D=

36.3 m
slope 1:200 loop 84 mm exp

loop
x STS
Ph. 2 - 6" V STS 2H
x H

elevation 9.3
L
9
+ 5
+ 3
1,962 Kg 0
109
30 (amb) 36.3
184.5 (10 barg) 3.6
154.5 166
14.9
5 x loop 20
S = (6 × (10^5) × D × X) ÷ L² TL 186

125 mm 0m
0.01 x 11.51 mm exp
+6>+9 +1 >+6 V+STS boiler room
9.3
loop
0m 0 mm exp

loop
251 mm exp x STS
109 m 2H STS
x H x

slope 1:100 elevation 10 +9 >10


90* V Tee STS
22 3 3 7

boiler room
Thermal expansion of main steam loop.
Note: No mechanical expansion joints are envisaged.

x = anchor
loop = U-piece
est. P-drop ~1 barg
Main Loop 5 - seamless steel sch-40
(pickled and passivated) S=

T1
T2
clean utility space ΔT
+9 CoE
end loop +9.5 x
STS 0 m V+STS
0 mm exp
9.3 elevation D=
D=

0 m
slope 1:200 loop 0 mm exp

loop
x STS
Ph. 2 - 6" V STS 2H
x H

elevation 9.3
L
9
+ 5
+ 3
#DIV/0! Kg 63.6
0
30 (amb) 0
143.75 (3 barg) 0
113.75 81
14.9
5 x loop 20
S = (6 × (10^5) × D × X) ÷ L² TL 101

100 mm 15.5m
0.01 x 8.47 mm exp
+6>+9 +1 >+6 V+STS boiler room
9.3
loop
63.6 m 108 mm exp

loop
0 mm exp x STS
0 m 2H STS
x H x

slope 1:100 elevation 9 +9 >10


90* V Tee STS
22 3 3 7

boiler room
T1 30
T2 143.732
ΔT 113.732
CoE 14.9
39

10

53

13 4

21
9
66 26

(amb)
(3 barg)
154

260.97 mm

176.24 mm 104
10

30
50.84

22
2

EXISTING HEADER