Professional Documents
Culture Documents
Homework 4
Classification of MRO Inventory
• This homework can be performed in groups of 2 people. Specify the name and university
code of the group members on the Excel file you will upload. You can choice your mate
• Solve the homework using the template Homework4.xlsx and upload it in Bloque Neon
• Homework deadline is midnight of Sunday, October 24
Assign a code (i.e. A, B or C) to each item and compute the number and percentage of items
within each category.
In the Excel sheet “Value-Criticality Method”, you can find a list of MRO materials with the
following information:
Stocked
Item Nº Unit cost ($) Effect Lead Time
Units
You need to assign the code resulted from the application of the value-criticality method to
each of the materials in the list; i.e. 3X, 3Y, 3Z, 2X, 2Y, 2Z, 1X, 1Y, 1Z.
Use the matrix in Figure 1: matrix for the assignment of the criticalityFigure 1 to define the
criticality value of each item. In the Excel, the effect and lead time values have already been
assigned.
Finally, fill the Table 2 (“Overview Value-Criticality” sheet of the Excel file) to get an
overview of the MRO storeroom in accordance with the value-criticality method.
Table 2: overview of the MRO inventory in accordance with the value-criticality method.
VALUE-CRITICALITY METHOD CRITICALITY VALUE
% of
VALUE-CRITICALITY Inventory % of inventory % of inventory
# Items % Items CRITICALITY % Items VALUE % Items inventory
CODE value value value
value
3X
3Y
3Z
3 X
2X
2Y
2Z
2 Y
1X
1Y
1Z
1 Z
TOTAL