You are on page 1of 2

Republic of the Philippines

Department of Education
Region III
Division of San Jose City
San Jose City East District
SAN JOSE EAST CENTRAL SCHOOL

LIST OF DONATIONS
GRADE VI-EARTH
S. Y. 2020-2021

AMOUNT
QUANTITYUNIT DESCRIPTION DONOR
UNIT COST TOTAL COST
3 pcs 250.00 750.00 Fish made of tire Nathaniel M. Binuya
3 pcs 350.00 1050.00 Swan made of tire Nathaniel M. Binuya
3 pcs 350.00 1050.00 Flowers made of tire Nathaniel M. Binuya
2 pcs 750.00 1500.00 GI Pipe Nathaniel M. Binuya
1 pcs 400.00 400.00 Teacup made of tire Nathaniel M. Binuya
1 pcs 500.00 500.00 Teapot made of tire Nathaniel M. Binuya

1 pcs 550.00 550.00 Wheelbarrow made of Nathaniel M. Binuya


tire
10 litres 145.00 1450.00 White paint Nathaniel M. Binuya
4 litres 145.00 580.00 Blue paint Nathaniel M. Binuya
4 litres 145.00 580.00 Red paint Nathaniel M. Binuya
4 litres 145.00 580.00 Yellow paint Nathaniel M. Binuya
4 litres 145.00 580.00 Orange paint Nathaniel M. Binuya
4 litres 145.00 580.00 Green paint Nathaniel M. Binuya
4 litres 145.00 580.00 Violet paint Nathaniel M. Binuya
Cement for garden set
4 bags 195.00 780.00 and bricks Nathaniel M. Binuya

12 pcs 150.00 1800.00 big tires Angelo F. Lindain


8 pcs 150.00 1200.00 big tires Johaima Sampiano
4 pcs 100.00 400.00 small tires Nathaniel M. Binuya
3 pcs 119.00 357.00 drill bit Angelo F. Lindain
4 pcs 50.00 200.00 sanding disc Angelo F. Lindain
3 pcs 50.00 150.00 paint brush (big) Nathaniel M. Binuya
4 pcs 30.00 120.00 paint brush (small) Nathaniel M. Binuya
6 daily 400.00 2400.00 labor Nathaniel M. Binuya
15 sacks 100.00 1500.00 loam soil Nathaniel M. Binuya
Total 19637.00

Prepared by:

Noted: ELOISA M. BINUYA


Teacher III
JOEL G. PONTELA, PhD
Principal III
Republic of the Philippines
Department of Education
Region III
Division of San Jose City
San Jose City East District
SAN JOSE EAST CENTRAL SCHOOL

LIST OF DONATIONS
GRADE VI-JUPITER
S. Y. 2020-2021

AMOUNT
QUANTITYUNIT DESCRIPTION DONOR
UNIT COST TOTAL COST
3 pcs 250.00 750.00 Fish made of tire Marina F. Lindain
3 pcs 350.00 1050.00 Swan made of tire Marina F. Lindain
3 pcs 350.00 1050.00 Flowers made of tire Marina F. Lindain
2 pcs 750.00 1500.00 GI Pipe Marina F. Lindain
1 pcs 400.00 400.00 Teacup made of tire Marina F. Lindain
1 pcs 350.00 350.00 Crab made of tire Marina F. Lindain
1 pcs 550.00 550.00 Wheelbarrow made of tire Marina F. Lindain
15 litres 145.00 2175.00 White paint Marina F. Lindain
8 litres 145.00 1160.00 Blue paint Marina F. Lindain
8 litres 145.00 1160.00 Red paint Marina F. Lindain
8 litres 145.00 1160.00 Yellow paint Marina F. Lindain
8 litres 145.00 1160.00 Orange paint Marina F. Lindain
8 litres 145.00 1160.00 Green paint Marina F. Lindain
8 litres 145.00 1160.00 Violet paint Marina F. Lindain
3 bags 195.00 585.00 Cement for garden set Marina F. Lindain
50 pcs 150.00 7500.00 medium size of tires Marina F. Lindain
5 pcs 300.00 1500.00 large size of tires Marina F. Lindain
4 pcs 100.00 400.00 small tires Marina F. Lindain
10 pcs 119.00 1190.00 drill bit Marina F. Lindain
10 pcs 50.00 500.00 sanding disc Marina F. Lindain
6 pcs 50.00 300.00 paint brush (big) Marina F. Lindain
6 pcs 30.00 180.00 paint brush (small) Marina F. Lindain
10 daily 300.00 3000.00 labor Marina F. Lindain
20 sacks 100.00 2000.00 loam soil Marina F. Lindain
Total 31940.00

Prepared by:

Noted: ANGELO F. LINDAIN


Teacher III
JOEL G. PONTELA, PhD
Principal III

You might also like