Safety Devices 10

If a fault appears on the console which is not listed in the


table, the responsible customer service department of the
crane manufacturer must be informed.

10.12 Service and Maintenance


Maintenance of the load limit device includes the following work:

1. Checking all cable connections in the system.


Damaged cables must be replaced immediately.

2. Checking the insulation of the length transmitter cables and


cable guides.
Worn insulation and damaged cable guides must be
replaced.

3. Check the hoist limit switch for easy movement.

4. Check the cable drums for sufficient preliminary tension.

5. Check the pressure contacts on the luffing cylinders and the


connection hose oil leaks.

Personnel which is not specifically trained may only rectify faults


listed in the maintenance chart and may not exchange defective
mechanical components or cables.