You are on page 1of 38

PORT

FOLIO
ART AND ARCHITECTURE
YOUSUF ELAGOUZA

1
Academic career
2020|2023
Bachelor of science in architecture
Polytecnic of turin

2018|2020
Bachelor of science in architecture
Al shorouk academy, Cairo, Egypt

2016|2018
Highschool diploma in mathematical studies
Al Farouk Language school, Cairo, Egypt

Work experiences
Nov. 2021 Oct 2018- May 2019
volunteer Public Relations Coordinator
Yousuf Elagouza open house torino Artkhana, Cairo
Email: agouza22@gmail.com
phone number: +393311118404 jul-aug 2020 Oct-Nov 2017
Address: Via Villarbasse 29 , Torino, Italy Restorer architect intern Art Guide
al Rowaad, Cairo Downtown Contemporary Arts Festival , Cairo

Nov 2019 jun-Aug 2017


Art Guide Volunteer
About me Arte D’Egypte, Cairo AIESEC India, Multiple cities

Born and raised in Cairo, Egypt. One of the biggest metropolitan jul-Sep 2019 jun 2016- jun 2018
and culturally diverse cities in the world, where I started my Call Center Agent Usher
Architectural studies in 2018. Moved to Turin, Italy, in 2020 to Digital works, Cairo Sirkil LLC. (child Expo/ Cairo Bites), Cairo
continue my education at the politecnical university of Turin
April-May 2019
and expected to finish my bachelor degree by summer 2023 at
the age of 23 years old.
Head Of Public Relations
TEDx Manarat Al Farouk, Cairo

Passion Technical skills Languages


Being raised in Cairo has given me a metropolitan perspective AutoCAD Arabic (Native)
on life, which has pushed me to pay attention to details in the
Illustrator English (Fluent)
chaos of the big city. While analyzing the city’s dynamic and
challenges, I gained my passion for architecture coupled with Premier Italian (Intermediate)
traveling. That started when I was young and, was amplified in Photoshop French (Elementary)
my trip to North India to volunteer when I was 17 years old. All InDesign
that and being a political activist has shaped the person I am
Figma
today. An ambitious, passionate artist and architect looking for
the betterment of the shared society that contains us. Through Sketchup
art and architecture I have found a medium for self-expression. ArchiCAD
Office
Nolian
Procreate
2
CONTENT 4 KIWAROHA INFINITY
Building Construction Studio a.y 2020/2021
Prof. W. Nicolino, L. Savio, S. Barpi

11 A THIN LINE BETWEEN ARTIFICAL AND NATURAL


City And Territory Studio a.y 2021/2022
Prof. M. Bonino, E. Bruno

17 HAPPY TOGETHER
Building Design With Climate Studio a.y 2021/2022
Arch. S. Della Rocca, G. Chiesa

26 SULTANA MALAK PALACE


A RESTORATION PROJECT

29 BETWEEN THE MIND AND BODY


Architectural Design Theory a.y 2022/2023
Prof. G. Corbellini
https://online.fliphtml5.com/zetgz/zpdj/

32 WUST
History Of Architecture And City LAB a.y 2022/2023
Prof. M. Dinler
https://wustcairo.wixsite.com/wust

33 THE OTHER SIDE


Models Paintings Photography

3
K i W A R I H O
i n f i n i t y

T o k y o
J A P A N

Kiwariho is a residential / office building project in the


metropolitan city of Tokyo. Designed by integrating modern
and traditional Japanese architectural techniques, by a
hybrid of reinforced concrete and traditional Japanese
wood joining structure. The design approach focuses on
circulation, and building envelope to maximize internal
comfort, creating a tranquil archipelago in the middle of
a the city hustle.
4
Itabashi city, Tokyo, Japan

WINTER SOLISTICE SUMMER SOLISTICE

KIWARIHO infinity 5
communal
garden

residential
offices
MASSING PUSH AND PULL OF FLOORS OPTIMIZING SOLAR GAINS PROGRAM DIVISION

INFINITE WOODEN WAFFLE STRUCTURE


AN EMPHASISE ON WOODS, FLOATING AND INFINITE STEEL STRUCTURE SUPPORTING THE WOODEN WAFFLE
EMPHASIZING WEIGHTLESSNESS

SOUTHERN AND EASTERN OPENINGS FOR WINTER SOLAR CHANGABLE SLIDING WOODEN SHADES
UNIFYING DESIGN
GAINS

KIWARIHO infinity 6
TOP VIEW
11
22

21

20

19

18

17

16

15

14

13

12

10

GÓRA

22H x 17
DÓŁ

21S x 28

SOUTHERN ELEVATION EASTERN ELEVATION

GROUND FLOOR (OFFICES) 1:100


11
18

17

16

15

14

13

12

10

GÓRA

18H x 18
DÓŁ

17S x 28

sion

ROOM1
ENTRANCE LAUNDRY BATHROOM

TATAMI/
MULTIFUNCTIONAL BALCONY
ROOM

DINING
ROOM2

ROOM3

LIVING

TOILET
KITCHEN

FIRST FLOOR (RESIDENTIAL) 1:100


11
22

21

20

19

18

17

16

15

14

13

12

10

GÓRA

22H x 16
DÓŁ

21S x 28

ROOM1
ENTRANCE LAUNDRY BATHROOM

ROOM2

GARDEN
DINING

TOILET

LIVING ROOM3

KITCHEN

BALCONY

WESTERN ELEVATION NORTHERN ELEVATION


SECOND FLOOR (RESIDENTIAL) 1:100

KIWARIHO infinity 7
AXONOMETRY OF STRUCTURAL CONNCETION DETAILED AXONOMETRY OF
TECHNOLOGICAL LAYERS

SECTION OF BUILDING ENVELOPE


MAQUETTE: AXONOMETRIC VIEW OF MAQUETTE: SIDE VIEW OF
TECHNOLOGICAL LAYERS TECHNOLOGICAL LAYERS
TECHNOLOGICAL SECTION 1:25

KIWARIHO infinity 8
ngDeformability
Moment due to the
due toGravity
Gravity LoadApplied Loads for Moment
Bending GravityDeformability
due to the Gravity Applied
due to Gravity Load Loads for GravityMoment du
Bending
120
40 400
Deformability due to Gravity Load
400 192
Bending Moment due to the Gravit
160

IPE 180 IPE 180 IPE 180

11,22 2% 2% 11,00
HEA 200 HEA 200 HEA 200
10,87

IPE 180 IPE 180 IPE 180 IPE 180


400

IPE 180 IPE 180 IPE 180

HEA 200 HEA 200 HEA 200 HEA 200


7,50 7,37 7,48 7,50
IPE 180 IPE 180 IPE 180 IPE 180
IPE 180
400

IPE 180 IPE 180 IPE 180 IPE 180

HEA 200 HEA 200


HEA 200 HEA 200 HEA 200

4,00 3,87 4,00


IPE 180 IPE 180 IPE 180 IPE 180 IPE 180
400

IPE 180 IPE 180 IPE 180 IPE 180

HEA 200 HEA 200 HEA 200 HEA 200 HEA 200
185

0,00 -0,02 0,00

40 400 400 400 394 160 -1,10 -1,10

MAIN STEEL STRUCTURE WOODEN STRUCTURE SECTION A-A


CROSS SECTION
GSEducationalVersion

Force
toDeformability
Gravity Load
Deformability due to to Bending
Gravity Load Applied
Moment Dead
due
Bending Loads
to the Gravitydue
Moment toApplied Loads
the Gravity for Gravity
Applied Loads forLoads
Gravity
sun on 21.06 at 12:00

due Dead Load Axial Force Deformability due to DeadApplied


Load Dead Axial Force
GSEducationalVersion

due to Gravity Load Bending MomentDeformability


due to the Gravity
due to DeadApplied
Load Loads for Axial
Gravity
Force

Deformability due to Gravity Load Bending Moment due to the Gravity Applied Loads for Gravity
Deformability Due To Gravity Load Axial Force Bending Moment Due To Gravity Deformability Due To Snow Load
toDeformability
Dead Load due
Deformability to Axial
Dead Force
Load
due to SnowAxial Axial
Applied
Load Force Force
Loads for Snow Applied
DeformabilityDead
due toLoads
Applied
Snow Dead
Applied Loads
Load Loads for Snow
due to Dead Load Applied
Deformability due to Snow Load Dead Loads

Deformability due to Dead Load Applied Loads For Snow Applied Dead Loads Applied Loads For Gravity
Deformability due to Dead Load Axial Force Applied Dead Loads
to Snow Load due to Snow Load
Deformability Applied Loads for Snow
Applied Loads for Snow
due to Snow Load Applied Loads for Snow EXPORTED FROM NOLIAN
9
KIWARIHO infinity
KIWARIHO infinity 10
A THIN LINE BETWEEN
ARTIFICIAL AND NATURAL
WHAT IS ARTIFICIAL
WHAT IS NATURAL?

AN URBAN PROJECT

TORRE PALi, PUGLIA


I T A L Y

This project was a part of a bigger project aimed at


reestablishing the urban design of Torre Pali, Apulia. A
thin strip reestablished on a wetland flooding seasonally ,
where a thin line separates the artificial and natural . Hence
the formation of the promenade following the behavior
of nature to create an artificial natural promenade that
fluctuates from permanent to temporary structures.
constructing a triangle of connection between NATURE,
TOURIST and LOCAL. A fish market and temporary market
pavilions ensure the interaction between tourist, and the
local’s lifestyle. The new TORRE PALI (the tower) reacts
with nature and creates a new perspective over the town.
11
ORGANIC FLOW ERECTION A THIN LINE

Organic formation of pavilions

A THIN LINE BETWEEN ARTIFICIAL AND NATURAL 12


Torre Pali, Apulia, Italy

Section A

Section B

SCALE 1:200
A THIN LINE BETWEEN ARTIFICIAL AND NATURAL 13
Nature

Artificial

FLOOR PLAN 1:100

A THIN LINE BETWEEN ARTIFICIAL AND NATURAL 14


Section A 1:100

ARTIFICIAL

NATURAL

Section B 1:100

A THIN LINE BETWEEN ARTIFICIAL AND NATURAL 15


A THIN LINE BETWEEN ARTIFICIAL AND NATURAL 16
H A P P Y
T O G E T H E R
A STUDENTS’ RESIDENCE

T O R I N O
I T A L Y

A residential project focusing on the inclusivity and,


Integration of students in a multicultural environment ,
by playing with architectural barriers to create a segue
from private to public spaces ensuring comfortable
spaces that are inclusive of different backgrounds and
neurodiversity. The projects link to context and climate
was one of the main design factors creating a sustainable
, energy-efficient residence.
17
Torino, Piedmont, Italy

FIGURE GROUND
GROUND FIGURE, SCALE 1:

Decem

SITE MICROCLIMATE MATRIX

June 2
sun - lee sun - lee

shade - lee shade - lee

sun - wind sun - wind

shade - wind shade - wind


December 21st - h10 December 21st - h14 Winter December 21st - h10 December 21st - h14

SHADOW WIND

Winter

June 21st - h08 June 21st - h16 Summer June 21st - h08 June 21st - h16

Summe

Places to avoid
OUTDOOR ACTIVITIES Car parking
Integration of the building shape

HAPPY TOGETHER 18
SITE PLAN
The location of our building results from the shadow
and wind wake core analysis of our plot, generated
by the surrounding buildings. According to the
RQ
VKLIW

GROUND FIGURE, SCALE 1:4000

MASSING PROGRAM DIVISION BREAKING LINEARITY SUBTRACTIVE TRANSFORMATION VERTICAL CIRCULA-

DWLRQ

SCALE 1:250
19
HAPPY TOGETHER
SITE PLAN, SCALE 1:500
SITE PLAN, SCALE 1:500

SITE SECTION, SCALE 1:500

NORTHERN FACADE COLLAGE

UPDWLRQ

SOUTHERN FACADE COLLAGE

GROUND FLOOR PLAN 1:100

HAPPY TOGETHER 20
The outdoor activities are defined according to the shade
shade--wind
wind shade
shade--wind
wind

HIGH METABOLIC RATE


need of the users and the neighbourhood, and their December 21st - h10 December 21st - h14
location follow the scored matrices.
Bar, seating area - resting Summer
LOW

June 21st -Places


h08to avoid June 21st - h16
December 21st - h10
OUTDOOR ACTIVITIES December 21st - h14 Car parking
Integration of the building shape
SITE PLAN
The location of our building results from the shadow
and wind wake core analysis of our plot, generated June 21st - h08 June 21st - h16
by the surrounding buildings. According to the
Winter December 21 - h10 st
December 21 - h14 st matrices, we decided
seasonally and yearly scored
not to build on the low scored part in the north of the
December 21st - h10 December 21st - h14 Winter December 21st -site,
h10while trying toDecember
be as far as21
possible
st
- h14 to the
shadow generated by the building to the south.
Therefore, we centered our building and redid the

WIND
site microclimate matrices to define the outdoor
SHADOW WIND
sun
sun -- lee
lee
activities. sun
sun--lee
shade
lee
shade -- lee
lee
Running, outdoor exercise equipmentsshade
shade--leelee
Inside the building, we also referred to the analyses HIGH sun
sun -- wind
wind
to placed and oriented the rooms. We took into sun
sun--wind
wind
shade
shade -- wind
wind
consideration the importance of sunlight and
ventilation for each unit and tried to respond to all shade
shade--wind
wind
the environmental requirements. HIGH METABO
The outdoor activities are defined according to the
need of the users and the neighbourhood, and their WINTER SUMMER December 21st - h10
location follow the scored matrices. Winter
June 21st - h08 June 21st - h16 Summer
June 21 - h08 stJune 21st - h08 June 21 - h16
June 21 - h16 st Bar, seating area - resting
st
sun - lee sunny
sun - -lee
calm sunny - calm
sun - lee
LOW
shade - lee shaded calm
shade - lee shaded
shade -- lee
calm

sun - wind sunny


sun - -wind
windy sunny - windy
sun - wind

shade - wind shaded


shade -- wind
windy shaded
shade -- wind
windy
WINTER
December 21 - h10 st
December 21 - h14 st
Winter June 21st - h08
Summer BUILDING PROGRAMMING June 21st - h08 June 21st - h16
Environmental requirements Summer sun - lee
Year
sunny
sun - -lee
calm
December 21st - h10 December 21st - h14 Winter December 21st - h10 December 21st - h14

SHADOW WIND shade - lee shaded calm


shade - lee
bedroom linving space studio
er1 er2
sun - wind sunny
sun - -wind
windy
er10 er3

sun
sun--lee
lee sun
sun--lee
lee sun
sun--lee
lee
shade - wind shaded -- wind
windy
shadeWinter
shade
shade--lee
lee Residential shade
shade--lee
lee
er9 er4
June 21st - h08 June 21st - h16 shade
shade--lee
lee Summer June 21st - h08 June 21st - h16
Requires privacy, insulation and direct sunlight sun -
sun
sun--wind
wind sun
sun--wind
wind sun
sun--wind
wind

shade
shade--wind
wind shade
shade--wind
wind shad
er8 er5 shade
shade--wind
wind

sun -
LOW METABOLIC RATE
WINTER SUMMER
er7 er6

shad

Winter Summer
December 21 - h10 st
December 21 - h14st

Year
June 21st - h08 meeting room Junegaming
21stroom
- h16 library BUILDING PROGRAMMING
sun - lee sunny
sun - -lee
calm sunny - calm
sun - lee
Environmental requirements Summer

shade - lee shaded calm


shade - lee shaded
shade -- lee
calm
Communal
Openings, accessibility and indirect sunlight
bedroom linving space studio
sun - wind sunny
sun - -wind
windy sunny - windy
sun - wind
er1 er2

er10 er3 June 21st - h08 June 21st - h16


studio sun
sun--lee
lee sun
sun--lee
lee

shaded
shade -- wind
windy shaded -- wind
windy
sun
sun--lee
lee

shade - wind
er9 er4 shade
shade--lee
lee shade
Residential shade
shade--lee
lee shade
shade--lee
lee
Requires privacy, insulation and direct sunlight
sun
sun--wind
wind sun
sun--wind
wind sun
sun--wind
wind

shade
shade--wind
wind shade
shade--wind
wind shade
shade--wind
wind
corridor staircase / elevator er8 er5

er7 er6
LOW METABOL
sun
sun--lee
lee sun
sun--lee
lee er1 = visual contact with outdoor
sun
sun--lee
lee December 21st - h10
er2 = natural ventilation
Connection
Easily shade
accessible
shade--lee
lee Residential shade Summer
shade--lee
lee
meeting
er3 = mechanical
er4 = daylight access
room
ventilation gaming room
Yearshade
shade--lee
lee
library
WINTER SUMMER
Requires privacy, insulation and direct sunlight
sun - lee sun - lee sun - lee
er5 = access to direct solar radiation
er6 = glaring protection sun - lee
Winter
sun - lee sunny
sun - -lee
calm sunny - calm
sun
sun--wind
wind sun
sun--wind
wind er7 = temperature/ humidity control
sun
sun--wind
wind
shade - lee shade - lee shade - lee er8 = septicity and sanytary quality
shade - lee shaded calmCommunal
shaded - calm
shade - lee shade - lee
er9 = olfactory level
Openings, accessibility and indirect sunlight
shade
shade--wind
wind sun - wind shade
shade--wind
windsun - wind sun - wind er10 = acoustic level sun - wind sun - wind shade
shade--wind
wind sunny
sun - -wind
windy sunny - windy

shade - wind shade - wind shade - wind shade - wind shaded June 21st - h08
shade - wind shade -- wind
windy shaded - windy
technical service administrative / management cafeteria fitness room

LOW METABOLIC RATE


Summer
corridor staircase / elevator Year
Public spaces
Accessible from outside
good insulation
December 21st - h10 December 21st - h14
er1 = visual contact with outdoor

library
er2 = natural ventilation
Connection er3 = mechanical ventilation
Easily accessible er4 = daylight access
sun
sun--lee
lee sun
sun--lee
lee er5 = access to direct solar radiation Winter

Residential shade
sun - lee sun - lee sun - lee er6 = glaring protection sun - lee sun - lee
er7 = temperature/ humidity control
shade--lee
lee shade
shade--lee
lee shade - lee shade - lee shade - lee er8 = septicity and sanytary quality
shade - lee

Requires privacy, insulation and direct sunlight


shade - lee

HAPPY TOGETHER 21
er9 = olfactory level
sun - wind sun - wind sun - wind er10 = acoustic level sun - wind sun - wind
sun
sun--wind
wind sun
sun--wind
wind shade - wind shade - wind shade - wind shade - wind shade - wind
TYPICAL FLOOR PLAN 1:100

MAQUETTE: AXONOMETRIC VIEW


SINGLE ROOM TYPOLOGY 1:50 DOUBLE ROOM TYPOLOGY DOUBLE ROOM TYPOLOGY 1:50

HAPPY TOGETHER 22
SOUTHERN ELEVATION 1:100

NORTHERN ELEVATION 1:100

HAPPY TOGETHER 23
ELEVATION STUDIES

NORTHERN FACADE STUDIES SOUTHERN FACADE STUDIES

LEVELING SLAB EXTRUSION

SUBTRACTIVE TRANSFORMATION
FACADE DIVISION

OPENING ADJUSTMENT
WINDOW PARTITIONING

FACADE FRAMING

GROUND FLOOR DEFINITION

MESH

CIRCULATION AND EGRESS

GROUND FLOOR DEFINITION

HAPPY TOGETHER 24
HAPPY TOGETHER 25
SULTANA MALAK PALACE

A RESTORATION PROJECT
H E L I O P O L I S
C A I R O
E G Y P T

The sultana Malak project is a part of an extensive resto-


ration project carried out on one of the palaces of the sulta-
na malak. this part of the project focuses on architectural
documentation of the palace’s existing status before the
restoration. Including a series of plans , sections and, ele-
vations of each small detain in the palace even the frescoes.
26
ELEVATION 4

GROUND FLOOR PLAN

SULTANA MALAK PALACE 27


PLAN AND SECTIONS OF G 16
ROOF PLAN

SULTANA MALAK PALACE 28


BETWEEN THE MIND AND BODY

A GENTLE MANIFESTO

Between the mind and body lies the medium of senses


that translates the external reality to the psyche
perception of reality, just like an architectural medium
that filters the environment’s influence over a human’s
senses. This is a study, a platform of expressing ideas
of diverse perception of the world, the relation between
architecture, the human body, its senses and the psyche.
Exploiting the power of architecture on creating different
variations and alternations of reality through the
translation of external information to the human brain.

For Full Text Follow Link:


https://online.fliphtml5.com/zetgz/zpdj/
29
BETWEEN THE MIND AND BODY
(HAN

*Se

[Exclu

(GR

[Inclus

BETWEEN THE MIND AND BODY 30


W U S T I
M
M
O
B
I
S L
H I
AN ARCHITECTURAL DOCUMENTATION OF O A
R R
CITY CENTER B E
C A I R O A
G
Y

Is research focuses on the construction waves of expantion


L
of the triangular site on the east bank of the Nile in Cairo. A
E
shaping a triangular correlation between people, space and G
Y A
their resulting activities in a continuous line of history. It G
P D
E
goes deeper into understanding how aspects of a designed N
T E
space (urban/ architectural) affect the perception of people I S
E
A
in a city, induces change in their behavior, impacts a soci- V
N
O
ety , how it influences a demographical change in a place. I
M
S
U
E
S
FOR MORE INFORMATION FOLLOW LINK E
https://wustcairo.wixsite.com/wust U
W U S T M 31
W U S T 32
The other side

m o d e l s

p a i n t i n g s

p h o t o g r a p h y

This section is dedicated to artistic creations (physical


models, paintings and sketches, and photography).
contributing to the architect within me with the same
importance as the architectural projects.
33
A DOUBLE ROOM TOGETHER

LINGOTTO SUBTRACTIVE TRANSFORMATION

34
Self portrait
Charcoal on paper

Release Solitude
Acrylic on canvas Oil on canvas
35
Summer House Series
Ink on paper

Self portrait
Acrylic on paper Zawya Series
Watercolor on paper

Summer House Series


Ink on paper

Muse Summer House Series Zawya Series


Sketch on paper Ink on paper Watercolor on paper

36
37
38

You might also like