What does the future hold

Presented by: Adriaan Scheeres


for
MayPhysical
2009 Asset Management ?
PAM Definition

Physical Asset Management


systematic and coordinated activities and
practices through which an organization
optimally manages its assets and asset
systems, their associated performance,
risks and expenditures over their lifecycle
for the purpose of achieving its
organizational strategic plan

What is PAS 55?

PAS 55 is the British Standards Institution's "Publicly Available Specification" for the optimised management of physical assets and
infrastructure - it provides clear definitions and a 21-point requirements specification for joined-up, optimised and whole-life asset
management systems
Asset lifecycle

PAM Lifecycle
5 – 40 years
Importance of PAM

Richard Branson Trevor Manual


• “My engineers and their actions are most • “We must build infrastructure , but above
important in our company (Virgin airline). all we need to maintain and manage it, for
There actions ensure an safe travelling our country to be competitive”
environments for all our customers. “
The PAM challenge
Information & tools that will assist a company to make good asset management optimisation decisions
PAM Standards & Systems

What is PAS 55?

PAS 55 is the British Standards Institution's "Publicly Available Specification" for the optimised management of physical assets and
infrastructure - it provides clear definitions and a 21-point requirements specification for joined-up, optimised and whole-life asset
management systems
Performance guidelines
Target/
Units of
KPI Name Freq Range Formula
measure
Short term

Number of Component Number of Component recommendations created


1M Count
recommendations created
Number of component Number of component recommendations reviewed
1M Count
recommendations reviewed
Overall Equipment Effectiveness (OEE) 1M % Varies Availability X Performance Rate X Quality Rate
Availability 1M % Varies [Required Uptime - Downtime] / Required Uptime.
Performance Rate 1M % Varies Actual Performance / Design Performance.
Quality Rate 1M % Varies Saleable Production / Total Production.

Maintenance cost / Plant Turnover 1M % 4% Maintenance cost / Plant Turnover


Maintenance cost / Plant replacement 3% Maintenance cost / Plant replacement value
1M %
value
Contractor cost / maintenance cost 1M % Contractor cost / maintenance cost
Overall Maintenance Cost (Total direct cost for period) + (Cost of lost production due
1M %
Effectiveness to breakdowns for period) / Investment value
Stores Investment / Plant replacement Stores Investment / Plant replacement value
1M %
value
Training man hours / maintenance man Training man hours / maintenance man hours
1M ManHours
hours
Preventative maintenance cost / Total Preventative maintenance cost / Total maintenance cost
1M %
maintenance cost
Preventative maintenance man hours / Preventative maintenance man hours / Total maintenance
1M %
Total maintenance man hours man hours
No reliable asset information available

Pictures, the ultimate evidence


Mainly reactive maintenance

Pictures, the ultimate evidence


Limited SHE focus at lowest levels

Pictures, the ultimate evidence


Limited standardisation

Pictures, the ultimate evidence


the Good, Bad & Ugly
Good housekeeping

Pictures, the ultimate evidence


Planning boards – excellent visual management tools

Pictures, the ultimate evidence


Spares management

Pictures, the ultimate evidence


Tools management?

Pictures, the ultimate evidence


Tools management

Pictures, the ultimate evidence


Which tools are better controlled?

Pictures, the ultimate evidence


Identification

Breather & colour coding

Pictures, the ultimate evidence


Lubrication Management

Pictures, the ultimate evidence


Safety!

Pictures, the ultimate evidence


Store or workshop?

Pictures, the ultimate evidence


Everything in its place

Pictures, the ultimate evidence


Visual Controls

Pictures, the ultimate evidence


Identification

Pictures, the ultimate evidence


No planning: Incorrect base plate

Pictures, the ultimate evidence


Pump not anchored

Pictures, the ultimate evidence


No active and formal walkabouts

Pictures, the ultimate evidence


Termination

Bad alignment and workmanship

Pictures, the ultimate evidence


Missing Nozzle

Pictures, the ultimate evidence


Workmanship standards

Pictures, the ultimate evidence


V-belt used as sling

Pictures, the ultimate evidence


Missing V-belts (only effective for 50% load transfer)

Pictures, the ultimate evidence


Leaks

Pictures, the ultimate evidence


Tensioning device

Pictures, the ultimate evidence


Spares?

Pictures, the ultimate evidence


Good practice

Pictures, the ultimate evidence


Identification

Pictures, the ultimate evidence


Poor Workmanship standards

Pictures, the ultimate evidence


Missing breather

Pictures, the ultimate evidence


Wrong tools

Pictures, the ultimate evidence


No oil! Root cause?

Extra store room

Pictures, the ultimate evidence


Critical surfaces protected

Pictures, the ultimate evidence


Bearings well covered and protected

Pictures, the ultimate evidence


Bearings well covered

Pictures, the ultimate evidence


Protected against dust

Pictures, the ultimate evidence


Spares delivered to work areas according to BOM and packaging standards

Pictures, the ultimate evidence


Good practice: Housekeeping on flamables

Pictures, the ultimate evidence


Clear bin locations, spare numbering & practices

Pictures, the ultimate evidence


Information available

Pictures, the ultimate evidence


Good communication

Pictures, the ultimate evidence


Good housekeeping

Pictures, the ultimate evidence


Spares & Materials

Pictures, the ultimate evidence


Special Tools

Pictures, the ultimate evidence


Everything in its place?

Pictures, the ultimate evidence


Missing special tools

Pictures, the ultimate evidence


Missing V-belts

Pictures, the ultimate evidence


Workmanship acceptable?

Pictures, the ultimate evidence


Lubrication at this point required equipment to be shut due to access

Pictures, the ultimate evidence


Home gym

No breather, no quick level indication

Pictures, the ultimate evidence


Rubber products storage (rotation & dark room)

Pictures, the ultimate evidence


Special Tools

Pictures, the ultimate evidence


Oil leaks

V-belts used for slings

Pictures, the ultimate evidence


Roof leak above control panel

Safety hazard

Pictures, the ultimate evidence


Quick
Morefixes
quicknot
fixes
followed
evident
up

Pictures, the ultimate evidence


Different tension on V-belts

Pictures, the ultimate evidence


Bearing storage

Pictures, the ultimate evidence


Protected against dirt & dust, but uncontrolled

Pictures, the ultimate evidence


Rotation of V-belts

Inadequate bund design

Pictures, the ultimate evidence


Inadequate bund design

Pictures, the ultimate evidence


Housekeeping

Pictures, the ultimate evidence


Cooling path almost completely blocked

Pictures, the ultimate evidence


Pin-hole leak (Internal condition of the pipework?)

Pictures, the ultimate evidence


Inadequate baseplate

Pictures, the ultimate evidence


Protected and stored in a controlled environment?

Pictures, the ultimate evidence


Material & fitting selection not always appropriate for the application

Pictures, the ultimate evidence


Housekeeping

Pictures, the ultimate evidence


Housekeeping

Pictures, the ultimate evidence


Housekeeping in electrical stores

Pictures, the ultimate evidence


Effective recieval management

Pictures, the ultimate evidence


Multiple drawing registers

Pictures, the ultimate evidence


Jobcard information

Pictures, the ultimate evidence


Documentation control

Pictures, the ultimate evidence


Planning office adding value?

Pictures, the ultimate evidence


Where to now????
Influence of the economy on PAM !

Improvements

+ Compliance

_
Reduction

Time
PAM focus areas

LCM
• Life Cycle Management

APM
• Asset Performance Management

OCM
• Operational Cost Management
Business Processes Enablement

Accurate
decision
Enable executable making

Business Processes
with in
Business Process
organisations for
Modeling and
true Agility implementation

ERP MES CMMS


“ we never forget that our engineers and flight crew
are people, and we’d much sooner personalise our
machinery than mechanise our staff”
LCM
• Life Cycle Management

APM
• Asset Performance Management

OCM
• Operational Cost Management

Design and implement business processes


in support of PAM in support of:
1st – Challenge?

Do you know...

your asset strategy and do you


understand the improvement plan?
2nd – Challenge?

Do you know...

what assets you have and where


they are?
3rd – Challenge?

Do you know...

the condition and the latest value


of your assets?
4th – Challenge?

Do you know...

what work must be performed on


the assets?
5th – Challenge?

Do you know...

what human resources are


required to perform this work?
Challenge – No 6?

Do you know...

what special resources and spares are


required to perform work on assets?
Challenge – No 7?

Do you know...

if you are getting optimum


performance from your assets?
Challenge – No 8?

Do you know...

how to plan for and acquire new


assets and dispose of old assets?
“Change your
• Understand your game plan Today”
challenges and
implement business
processes in
support of them !

“F 16”
Questions?
Presented by: Adriaan Scheeres