You are on page 1of 18

HOW TO INSTALL ESD PVC FLOOR(600X600X2MM)

1. Material composition:
PVC resin, plasticizer, stabilizer, filler, conductive material
and mixed color material by scientific proportion,
polymerization thermoplastic molding.

2. Features:
a, beautiful appearance, can provide a variety of colors for
users to choose;
b, elastic, good foot feeling;
c, wear-resistant, low dust, durable and flame retardant;

3. Requirements for the ground:


The ground should be smooth and dry (the surface of the
cement floor should be white), without obvious roughness,
and the surface roughness should be less than 2/1000mm,
which can be the ground of terrazzo, tile, wood or 1:3
cement mortar.
4, construction materials and tools:
a, construction materials;
b, the floor, using anti-static semi-rigid PVC block plastic
floor,
c, conductive adhesive, resistance value should be less than
10^4Ω;
d, copper foil (or aluminum foil) thickness 0.01-0.05mm
width 20-40mm;
e, alcohol, industrial grade;
f, welding rod, diameter 2-5mm.

5. Construction tools:
a, scraper, used for coating conductive adhesive;
b, rubber throwing head, used to hammer the plastic floor,
so that it is fully bonded with the ground;
c, megohm meter, voltage 100 volts, used to measure
electrical conductivity;
d, blade, for cutting plastic floor;
e, welding gun, used to weld the floor.
6. Construction procedure:
1. Clear the ground and look for the center line:
First of all, the ground slag ash is cleaned, and then the
center of the room is found with a measuring tool, and the
central cross line is drawn, and the cross line is vertically
divided.
Do a self-leveling floor, leveling.
2, laying copper foil (or aluminum foil) network:
A. Paste copper foil strips on the ground to form a network
according to the specified size. At the intersection of copper
foil, conductive adhesive should be used to bond to ensure
the conduction between copper foils;
B, use a megohm meter to measure the resistance between
adjacent copper foil, its resistance value should be less than
105Ω, if there is no obstruction, need to find out the reason
to paste again to ensure that the copper foil conduction;
C. At least four points in every 100 square meters of the
pasted copper foil network are connected to the ground wire.
3, laying the floor:
a, use the scraper to apply part of the ground conductive
adhesive;
b. When the conductive adhesive feels sticky and non-sticky,
start to lay the floor. When laying, spread out block by block
from the center position and beat it with a rubber hammer.
Keep 1.5-2.0mm spacing between the floor and the floor;
c, continue to trowel conductive glue, coated with the floor,
until the entire construction floor
d, in the process of laying the floor, it must be ensured that
the copper foil passes under the floor
e, use the welding gun to soften the welding rod at high
temperature, and fill the spacing between the floor and the
floor.
f, the protruding part of the electrode is cut off with an art
knife to complete the entire ground construction
g, During the construction process, the common megohm
meter tests whether the floor surface is connected to the
copper foil. If there is no obstruction, it is necessary to find
out the reason and paste it again to ensure the ground
resistance of each floor less than 10^8Ω.
h, the surface of the floor veneer after laying, the surface
must be cleaned.
7. Construction quality requirements:
A, the floor surface resistance to the ground should be less
than 10^8Ω.
B, no steam bubble on the surface, no peeling phenomenon.
C. Weld the gap and clean it after construction.

8. Maintenance:
A. When placing items on the floor, heavy objects should be
avoided from dragging on the floor, the contact surface
should not be too small, and wood blocks can be used as
padding if necessary.
B. When walking on the floor, do not wear shoes with metal
nails, and do not use sharp or hard objects to scratch and
knock on the floor surface.
C, often use squeezed dry wet mop mop, dirty places can be
cleaned with alcohol and other solvents.
D,Often use floor wax to mantaince
1. Clean and polish the ground on the site, remove the
debris attached to the surface, etc
2. After then, sweeping the ground.
3. Prepare special electrostatic conductive glue and scraper
4. Apply electrostatic conductive glue evenly
5.Wait for the glue to dry
6.Lay the copper foil into a # shape, ensuring that there is a
copper foil underneath each pvc floor to form an overall
cross-connection
7.PVC floor laying is complete, and make sure the board
joint is even without dislocation
8. Prepare to use an open slotting knife or an open slotting
machine
9. Ensure standard V-shaped grooves with even
depth
10. Use a professional PVC floor welding gun to weld the
welding rod into the open slot to ensure stable temperature
and uniform welding speed
11. Then use a spatula to remove the excess welding rod and
ensure that the interface is smooth
12. Completion of construction, test and
detection
13 Use professional electrostatic conductive wax water to
evenly wax, and reserve the ground wire to connect with the
special ground wire of the plant to ensure the release of
static electricity