PURPOSE STATEMENT

Seeking for challenging assignments in / Maintenance/ Projects in an organization


of repute preferably in a Manufacturing setup

PROFESSIONAL SYNOPSIS

 Rich experience of Plant maintenance


 In charge of maintenance department since from last five years
 Track record of achieving Management objectives, planning and handling
preventive maintenance schedules with effective implementation.
 Core competency in Fault finding and repairing, (CAPA) installation,
erection, Robotics, In house projects, Power and Hydraulic Press
Installation and Maintenance.
 PLC, Process Plant, Paint shop, ASU, Utilities. ETP, STP. R.O. Plant
 Diligent on improving machine availability and achieving targeted.
OEE (Overall Equipment Effectiveness) skills and ability to lead and
empower team to achieve company objectives.

 Successfully implemented TPM systems, maintaining MTTR, MTBF.


 Well aware and updated on ISO-9000 TS 16949, IMS and setting of
different procedures related to maintenance.
 Keen interest in implementation of Kaizen Poka – Yoko, analytical study of
repeated break downs.

TECHNICAL PURVIEW

Handled maintenance, Shut down Maintenance, reconditioning of following


machines meticulously

Mechanical and Electrical –


 Weld shop – Having sophisticated ( SPM) weld shop for Two Wheeler
( Hero) frame manufacturing. Having Panasonic TM 1400,1800 series
Robots in totality 65 Nos. SPM boring CNC machines, Paint shop. & Press
shop.
 Gear Shop- Installation and commissioning of Gear shop machine and all
set up . Done installation of Lorenz and Liebherr gear cutting machines ,
CNC Machines
 Press shop – Various types of presses up to 1250 T
British Clearing Press line Installation of Erfurt Power Press, Reconditioning
presses from Mechanical & Electrical point of view.
Handled break down maintenance of ISGEC, Russian Presses effectively
and successfully. Actively participated in installation and commissioning of
press line
 Machine shop – CISPEL HELD CNC Machine , CNC -500, AMS ,
Hartford
SPM Welding m/c, Conventional relay logic control Machines , PLC Base
M/c s
 Paint Shop- PT, CED, Burners, Oven, AHU
 Fabrication Shop- with LAZER cutting m/c, Plasma Cutting m/c
 Process Plant – Machine shop – Utility
Material handling equipment-

 Power distribution system -H.T. / L.T, Sub Station


 Water Treatment Plant ETP, STP, RO plant,
ORGANISATIONAL DETAILS

 Satyam Auto Components P. Ltd . Halol Vadodara


Jan 22 Till date

Micro Turners P. Ltd Chakan Pune


Mar 2021 to Dec -22

Hindustan Pressing Pvt. Ltd – Bhosari – Pune Jan -19 Mar- 2020
Reconditioning of old Russian Presses Aida Press, Implementation Pick and
place automation system, VFD Installation for presses.

 Munjal Auto Industries Ltd -Vadodara -Gujarat Jan -17 Jan- 19


Reconditioning of presses, Implementation of safety systems,
Preventative and predictive maintenance for improving MTBF

 Maintenance , Electrical , Installation and commissioning


Consultant
 Fire Fighting Systems

 Adlabs Entertainment Ltd – Khalapur- Feb – 14 June -15

Manager – RED (Ride. Egg. Dept.)

 Greaves Cotton Ltd Pune (Foundry Div.) July -12 Dec-13


Sr. Manager – Maintenance (Till Plant Close)

 Indiana Gratings Pvt. Ltd- Pune Oct-09 July- 12

Manager – Maintenance
Handle maintenance and reconditioning of EFW (Electro forged Welding)
Machines

 Enkei Castalloy ( Presently Alicon Castalloy Ltd ) – Pune


May 05 Oct-09

Assistant Manager – Maintenance


Introduce TPM System effectively.
 Wheels India Ltd (A TVS Group Org.)– Nov97 May’05
Maintenance- Engineer
Implemented various cost and power saving projects successfully

Started career from Indian Tool Manufacturers Ltd in July 1991and for career
development came to Pune and joined Jagdamba Lamps Ltd (Engg. Div.) In Aug –
96.

ROLE AND RESPONSIBIITY

Present
 In charge of maintenance department in Satyam Auto Components
P. Ltd Halol. Vadodara
System development, cost saving projects. M/c, Spare parts Management,
Budgeting, Billing . Shut down Maintenance activity planning and
execution .On job training go employees and new members. Consumption
Analysis ( Power, Water, Consumable Spares) Power to production
analysis. Daily MIS data and status reporting to management.
Previous
 In charge of Maintenance Department in Hindustan Pressings P Ltd.
 In charge of maintenance department in Munjal Auto Industries Ltd one of
renown Hero Group company involved in Manufacturing Muffler
(Silencers for Two & Four-Wheeler). Fuel tank, Wheel Rims
 In charge of maintenance department in Greaves Cotton Ltd Foundry plant.
Responsible for Daily, Routine and Schedule maintenance. Conducting
activities from human safety point of view. Monitoring, Supervision on Daily
to annual checks.
 Rehab of roller coasters as per OEM instructions. (In Adlabs Entertainment
Ltd )
 Budgeting and system implementation. As Senior Manager Maintenance in
Greaves Cotton Ltd Pune – (Foundry Div.)
Responsible for all maintenance and in house projects Inspection,
Installation of machines, Activities co-related with external agencies and
internal departments. Implementation of management policies. TPM
Implementation. Preparation and presentation of MIS. System Development,
Cost Control, Tracking of Production Vs Power Consumption, Quality
Improvement. Data generation for audits, statutory compliance. Fulfillment of
observations/NC highlighted audits. Budgets preparation monitoring all bills.
Carry out preventive maintenance as per schedule. Analysis of breakdown and
make corrective plan. Spare Parts Management and Inventory control.
Inspection of incoming spares / material related to maintenance. (In stores).
Provide on job training for team members. Preparation and Implementation
of SOP for the dept. Installation and commissioning of new projects. Cost –
Production analysis to improve productivity. Reconditioning of machines
meticulously .Statutory compliance, Audit, Data, History card, Records
through SAP.

ACHIEVEMENTS
 Installation of 1000 T,400 T old Russian press , 1250 T press ( Erfurt)
 Reduction in breakdowns & Machine uptime up to bench mark
By implementation of various methods causes reduction in repeated break
downs.
 Implemented Automation project like pick and place for cycle time
improvement and Man power cost reduction.
 Break down analysis for all departments and effective implementation of
corrective & preventive action.
 Power saving- By improving power factor & by various methods.
 Improvement in productivity & quality.(By Installation of VFD)
 Material Saving- Gap between two blanks reduced by 3-4 mm by
installation of CTL saved material. Paint saving – Painting stopped between
two wheels saved paint cost by 10 % with other intangible benefits.
 Installation of Taper shank twist drill (TSTD) & Jobber Drill section in
stipulated time frame and certified for same.
 Reconditioning ,Recto fitting & refurbishment of machines meticulously
 Converted Cispel( HEID) CNC machines control system in SINUMERIC -
810
 Converted Conventional relay logic control panel into to auto PLC base for
British Clearing Mechanical press. 250 T, ( ISGEC Presses)
 Developed and designed SPM machines as per production requirements.
Effectively Handling Functions

 Break downs – Power and Heavy duty Presses, Electrical, Hydraulics,


Pneumatics, H.T. LT. Line break down and preventative, Various types of
SPM machines, Robots.
 Audit – Documentation, Rectification as per observations, N/C, suggestions
mentioned in audit.

 Break down analysis – Root cause analysis,( RCA) why – Why analysis for
effective maintenance practice to improve MTTR, MTBF.
 Member of FMEA
 Team Leader
 Electrical Drawing reading and corrections if required. VFD installation and
fitment.
 Utility Maintenance of Compressor, D.G. Material Handling unit, EOT
Cranes.
 H.T. Yard equipment Maintenance ,
 Substation trouble shooting and preventative maintenance.
Operation’s Management

Project Planning & Execution

 (Installation & Commissioning) Executing projects for plant set up, expansion,
modernization, Installation& commissioning.

 Monitor/Discuss project status; review during the course of periodic project


review meetings there by developing inter personal skills.
 Inspection of new machines

 Holding Electrical Supervisor License


ACADEMIA

 Diploma In Electrical Engineering -Board of Technical Education -


Govt. Polytechnic Pune. Class: First Year – March – 1990
 Diploma In Mech. Engineering - Board of Technical Education -
Govt. Polytechnic Pune Class: H. second
 Bachelor Of Engineering ( Electrical) ( Wadia college of engineering)
 P.G.D.B.M. (Operation) Welingkar Education (S.P. Mandali’s) Year
2015 -
 H.S.C. (Electronics) – Pune University Year 1987 Class: First
 S.S.C. – (Technical) - Pune University Year 1985 Class First
 Pursing B-Tech (Electrical) – Appeared for Final Semester

PERSONAL DETAILS

 Date of Birth : 10TH June 1970.


 Address : Flat No. 17, Akshay Apartment Sopan Nagar
Wadgaon Sheri Pune Nagar Roa

Pune. Pin – 411014

 Passport : Having Valid Pass port.

 Expected Salary. : As per company rules and regulation ( 30% Rise

 Reference : Available as & when asked