Question: Score 1 of 1

You want to set up budget availability control for your projects and internal
orders. What can you check using budget availability control?
There are 2 correct answers to this question

Response:

The availability of funds using overall plan value

The availability of funds on period level

The availability of funds in object currency

The availability of funds according to tolerance limits

Question: Score 0 of 1

Which parameters can you enter when you create a costing run?
There are THREE correct answers for this question

Response:

Costing variant

Costing version

Valuation variant

Transfer control

Production version
https://www.erpprep.com/node/16254/myresults/1529523 1/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Question: Score 1 of 1

Which object do you configure to reuse material cost estimate for the costing
process?

Response:

Quantity structure control

Group costing

Transfer control

Valuation variant

Question: Score 1 of 1

What is the highest reporting level in management accounting?

Response:

Operating concern

Controlling area

Company code

Profit center

Question: Score 1 of 1

How can you configure the transfer price solution in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

Use separate segments for each valuation.

Use separate ledgers for each valuation.

Use separate accounts for each valuation.

https://www.erpprep.com/node/16254/myresults/1529523 2/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Use separate currency types within the same ledger for each valuation.

Question: Score 1 of 1

You use a production order with Product Cost by Period and you entered a
results analysis key and variance key. How does the system calculate variances
in Product Cost by Period?
Please choose the correct answer.

Response:

Variances = Target costs - Delivery value - WIP

Variances = Actual costs - Delivery value - WIP

Variances = Target costs - Delivery value

Variances = Actual costs - Delivery value

Question: Score 1 of 1

What are the benefits of using valuated sales order stock compared to non-
valuated sales order stock?
There are TWO correct answers for this question

Response:

Combined quantity and value flow analysis

Production cost calculation

Simplified inventory value determination

Production order settlement to sales order

Question: Score 1 of 1

Your customer uses account-based CO-PA. Which sales documents create an


account-based CO-PA line item for each standard ledger in the universal journal
table in SAP S/4HANA 1809?
There are TWO correct answers for this question

Response:
https://www.erpprep.com/node/16254/myresults/1529523 3/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Goods issue

Goods receipt

Sales order

Billing

Question: Score 1 of 1

When do you use an assessment instead of a distribution?


There are TWO correct answers for this question

Response:

When you need the option to reverse the cycle as often as required

When you need to transfer secondary costs

When you want to consolidate allocated expenses

When you want to view the original cost elements on the receiver

Question: Score 1 of 1

How do you maintain number intervals/ranges in Controlling?


Please choose the correct answer.

Response:

By document type

By business transactions

By company code

By posting key

Question: Score 1 of 1

Which customizing activity do you perform in overhead cost controlling?

https://www.erpprep.com/node/16254/myresults/1529523 4/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Response:

Define cost center categories

Define company centers categories

Maintain costing variant parameters

Create value fields

Question: Score 1 of 1

You configured an overhead costing sheet that uses the quantity-based


overhead approach to calculate the overhead amount. What is required for the
amount to be calculated?

Response:

Cost accounts with the option to record quantity

Settlement rules with valid receiver objects

Activity types with actual or plan quantities maintained

Statistically figures with values for the period

Question: Score 1 of 1

What is required before you can create a multi-level material cost estimate
without quantity structure?

Response:

Material master with costing view

Specific costing variants for material costings without quantity structure

Specific valuation variants for material costings without quantity structure

Material master with accounting view and with MRP views

https://www.erpprep.com/node/16254/myresults/1529523 5/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Question: Score 0 of 1

For which revenue-carrying cost objects does the system perform results
analysis?
There are 3 correct answers to this question.

Response:

Customer service orders

Cost center

Business processes

Work breakdown structure

Internal order

Question: Score 1 of 1

Which of the following objects can be selected in templates for activity-based


costing?
There are 2 correct answers to this question.

Response:

WBS element

Cost center/activity type

Internal order

Business process

Question: Score 1 of 1

Which activities can you perform while you create cost center hierarchies?
There are 2 correct answers to this question.

Response:

Reassign a cost center to another node of the standard hierarchy.

Append nodes and cost centers to a node of the standard hierarchy.

https://www.erpprep.com/node/16254/myresults/1529523 6/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Create a cost center without specifying a standard hierarchy.

Assign a standard hierarchy to several controlling areas.

Question: Score 1 of 1

Where can you find actual transaction data of account-based CO-PA in SAP
S/4HANA?

Response:

CE1XXXX

COEJ

ACDOCA

BSEG

Question: Score 1 of 1

You want to maintain a cost component structure. What can you determine for
each cost component?
There are 3 correct answers to this question

Response:

Relevance of cost component to inventory valuation

Assignment of cost component to cost component group

Assignment of cost component to calculation base for overheads in costing sheet

Relevance of cost component to results analysis

Relevance of cost component to goods manufactured

Question: Score 1 of 1

Which default values can you configure for the product cost collector?
There are 2 correct answers to this question.

https://www.erpprep.com/node/16254/myresults/1529523 7/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Response:

Variance variant

Results Analysis (RA) key

Costing variant for preliminary costing

Results Analysis (RA) version

Question: Score 1 of 1

How can you configure cycles for period-end allocation?


There are TWO correct answers for this question

Response:

Define allocation for the same cost center in multiple segments

Assign several segments to a cycle

Create cycles that iterate with each other

Use different allocation rules within one segment

Question: Score 1 of 1

You want to set up integrated planning for your internal orders. What do you
need to do?
There are 2 correct answers to this question.

Response:

Set the relevant indicator in the internal order master record.

Set the relevant indicators in the CO version.

Set the relevant indicator in the controlling area.

Set the relevant indicator in the planning profile of the order type.

https://www.erpprep.com/node/16254/myresults/1529523 8/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Question: Score 1 of 1

What are the prerequisites for automatic generation of the settlement rule to a
market segment for a sales order item?
There are 2 correct answers to this question.

Response:

Profitability Analysis (CO-PA) is activated.

The material in the sales order item is a service.

The sales order item is a cost object.

The sales order item is assigned to a project.

Question: Score 0 of 1

To which object do you assign a costing sheet?


Please choose the correct answer.

Response:

Costing variant

Cost component structure

Valuation variant

Transfer control

Question: Score 1 of 1

You want to prevent periodic cost fluctuations. Which activity should you choose
to distribute irregular expenses to the relevant periods?
Please choose the correct answer.

Response:

Accrual calculation

Periodic reposting

Cost splitting

https://www.erpprep.com/node/16254/myresults/1529523 9/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Variance calculation

Question: Score 1 of 1

Which management accounting currencies can you use for evaluation when you
use cross-company-code cost accounting?
There are THREE correct answers for this question

Response:

Company code currency

Transaction currency

Reference currency

Object currency

Controlling area currency

Question: Score 1 of 1

Which of the following steps are part of the procedure to update the standard
price of the material?
There are 2 correct answers to this question.

Response:

Split the costs.

Release the cost estimate.

Archive the cost estimates.

Mark the cost estimate.

Question: Score 1 of 1

Which processes belong to the “final costing” of cost objects?


There are TWO correct answers for this question

Response:

https://www.erpprep.com/node/16254/myresults/1529523 10/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Variance calculation

Overhead surcharge

Revaluation at actual costs

Work in process

Question: Score 1 of 1

You want to understand why costs are collected on sales order item level. What
do you need to check in the configuration?
There are 3 correct answers to this question.

Response:

Requirement type

Valuation variant

Account assignment category

Costing type

Requirements class

Question: Score 1 of 1

Which process can you use to credit internal orders during period-end closing?
Please choose the correct answer.

Response:

Assessment

Distribution

Indirect activity allocation

Periodic reposting

https://www.erpprep.com/node/16254/myresults/1529523 11/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Question: Score 1 of 1

What can you use to difference two or more cost estimates for the same
material?
There are TWO correct answers for this question

Response:

Transfer control

Costing variant

Costing version

Valuation variant

Question: Score 1 of 1

Which characteristic controls the eligible cost element categories for G/L
accounts in SAP S/4HANA?

Response:

Account group

Account type

Field status group

Account currency

Question: Score 1 of 1

You are considering using commitment management with internal orders. What
do you need to do in the configuration?
Please choose the correct answer.

Response:

Activate commitment management only in the order type.

Activate commitment management in both the company code and the order type.

Activate commitment management in both the controlling area and the order type.

https://www.erpprep.com/node/16254/myresults/1529523 12/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Activate commitment management only in the controlling area.

Question: Score 1 of 1

What are some of the characteristics of internal order planning?


There are 2 correct answers to this question.

Response:

Availability control is checked.

Multiple versions are allowed.

Costs are entered.

Tolerance limits are defined.

Question: Score 1 of 1

You are setting up costing-based Profitability Analysis for your organization.


How do you configure the different market segments?
Please choose the correct answer.

Response:

As characteristics

As value fields

As divisions

As key figures

Question: Score 1 of 1

Which of the following statements best describe Product Cost by Order?


There are 2 correct answers to this question.

Response:

It is used when full cost traceability is needed.

It is used when you perform repetitive manufacturing.


https://www.erpprep.com/node/16254/myresults/1529523 13/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

It is used when controlling by individual production lots or discrete quantities is


needed.

It is recommended for products with a long production time.

Question: Score 1 of 1

What is the default option for planning profit center values in SAP S/4HANA?
Please choose the correct answer.

Response:

Financial accounting planning

Management accounting planning

Profitability analysis planning

Business planning and consolidation

Question: Score 1 of 1

Which characteristic of an internal order does the order type control?

Response:

Controlling areas the order is assigned to

Types of costs posted to the order

Time period for which the order is valid

Budget profile assigned to the order

Question: Score 1 of 1

When trying to assign a profit center to a new cost center, you receive an error.
What can cause this error?

Response:

https://www.erpprep.com/node/16254/myresults/1529523 14/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

The lock indicator is activated in the profit center master record

The validity period of the profit center is shorter than that of the cost center

The profit center has already been assigned to a different cost center

The validity period of the cost center is shorter than that of the profit center

Question: Score 1 of 1

Which of the following controls can you set when you determine a characteristic
derivation?
There are 3 correct answers to this question.

Response:

Conditions for execution

Display authority

System response when unsuccessful

Valuation calculation

Overwriting authority

Question: Score 1 of 1

What are some of the unique attributes of an assessment cycle in Controlling?


There are 2 correct answers to this question.

Response:

They use the original cost element during transfer.

They use a secondary cost element during transfer.

They transfer primary and secondary costs.

They transfer only primary costs.

https://www.erpprep.com/node/16254/myresults/1529523 15/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Question: Score 1 of 1

You need to analyze different planning scenarios for cost centers. With which
object do you differentiate the planning scenarios?

Response:

Company code

Cost center group

CO version

Operating concern

Question: Score 1 of 1

What can you analyze in detail when you transfer the cost component split from
product cost planning to costing-based CO-PA?

Response:

Variance categories

Cost of goods sold

Sales revenues

Cost of goods manufactured

Question: Score 1 of 1

What must the referenced cost estimate and the receiving cost estimate have in
common?
Please choose the correct answer.

Response:

The quantity structure

The plant

The company codes

https://www.erpprep.com/node/16254/myresults/1529523 16/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

The cost component structure

Question: Score 1 of 1

Which views can you use to analyze the costing results within the costing run
tool?
There are THREE correct answers for this question

Response:

Variance report

Work in progress report

Analysis report

Material list report

Costing levels report

Question: Score 1 of 1

How does SAP S/4HANA determine if a characteristic value is valid in


Profitability Analysis?
Please choose the correct answer.

Response:

By defining the characteristic value as a value field

By defining the characteristic value in the field catalog

By defining the characteristic value in the check table

By defining the characteristic value as a key figure

Question: Score 1 of 1

What can you specify when you create an activity type?


There are THREE correct answers for this question

Response:

https://www.erpprep.com/node/16254/myresults/1529523 17/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

The activity type category for allocation

The valid receiving cost center types

The secondary costs G/L account for internal activity allocation

The primary costs G/L account for internal activity allocation

The valid sending cost center types

Question: Score 1 of 1

How does SAP S/4HANA select line-item-based data for costing-based


Profitability Analysis reports?
Please choose the correct answer.

Response:

It selects actual data from table CE2XXXX and plan data from table CE3XXXX.

It selects actual data from table ACDOCA and plan data from table COSP.

It selects actual data from table ACDOCA and plan data from table ACDOCP.

It selects actual data from table CE1XXXX and plan data from table CE2XXXX.

Question: Score 1 of 1

In which SAP S/4HANA components can you report the results of the results
analysis?
There are 3 correct answers to this question.

Response:

Profit center accounting

Inventory management

Profitability analysis

Financial accounting

Sales and distribution

https://www.erpprep.com/node/16254/myresults/1529523 18/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Question: Score 1 of 1

What do you do to create a primary cost component split?


There are TWO correct answers for this question

Response:

Assign a cost component structure to the CO-version

Enter split activity prices manually

Run an activity price calculation

Use the cost splitting tool on cost centers

Question: Score 1 of 1

How can you populate local variables in Profitability Analysis reports?


Please choose the correct answer.

Response:

By user exit

By Business Add-In

By populating from user parameters

By user entry during report execution

Question: Score 1 of 1

You are executing an indirect activity allocation. What do you post to the sender
and receiver?
Please choose the correct answer.

Response:

You post quantity and cost to both the sender and receiver.

You post both quantity and cost to the sender, and cost only to the receiver.

https://www.erpprep.com/node/16254/myresults/1529523 19/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

You post cost only to both the sender and receiver.

You post both quantity and cost to the receiver, and cost only to the sender.

Question: Score 0 of 1

You want to create alternative plan versions for your controlling area, in
addition to version 000. What would you use additional CO versions for?
There are 2 correct answers to this question.

Response:

To store different budget data

To store different plan data

To store parallel valuation

To store actual-plan variance

Question: Score 1 of 1

What are some of the characteristics of SAP Core Data Services (CDS) views?
There are 3 correct answers to this question.

Response:

CDS views support authorizations.

CDS views are considered system modifications.

CDS views have ready-to-use content.

CDS views have no latency.

CDS views duplicate data for reporting efficiencies.

Question: Score 1 of 1

You are setting up a direct internal activity allocation in SAP S/4HANA. What are
valid receivers for the activity?
There are 3 correct answers to this question.

https://www.erpprep.com/node/16254/myresults/1529523 20/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Response:

Statistical overhead order

General ledger account

Network

Cost center

Sales order item

Question: Score 1 of 1

Which of the following statements best describe Product Cost by Period?


There are 2 correct answers to this question.

Response:

It is used to analyze work in process based on actual costs.

It is used in conjunction with a product cost collector.

It is used for joint production with process orders.

It is used when the focus of controlling is on a stable and continuous production


process.

Question: Score 1 of 1

You have implemented Product Cost by Sales Order in conjunction with revenue-
based results analysis in your organization. For a particular sales order item, you
have the following:

- Plan revenue = 3000


- Plan costs = 2000
- Actual revenue = 1200
- Actual costs = 1000

What data does the system calculate during results analysis?


Please choose the correct answer.

Response:

Revenue = 1200; Cost of sales = 1000; Reserve = 200

https://www.erpprep.com/node/16254/myresults/1529523 21/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Revenue = 1200; Cost of sales = 800; Reserve = 200

Revenue = 1200; Cost of sales = 1000; WIP = 200

Revenue = 1200; Cost of sales = 800; WIP = 200

Question: Score 1 of 1

What action do you perform to use the Cost-Based Percentage of Completion


(POC) method?

Response:

Costing of an order

Billing of a sales order during production

Setting to profitability analysis

Running the results analysis

Question: Score 1 of 1

Which activity do you perform during period-end in profit center accounting?

Response:

Process distribution cycles

Settle costs

Post activity allocation

Execute template allocation

Question: Score 1 of 1

Which component provides insight into the effectiveness and results for areas of
responsibility within the enterprise?

Response:

https://www.erpprep.com/node/16254/myresults/1529523 22/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Profitability analysis

Results analysis

Profit center accounting

Revenue accounting and reporting

Question: Score 1 of 1

In the Product Cost by Order component, what does the system calculate
depending on the order status?
Please choose the correct answer.

Response:

WIP at actual costs or variances

Both WIP and variances or only variances

WIP at planned costs or variances

WIP at target costs or variances

Question: Score 1 of 1

Which object controls the tiles a business user can assign to their SAP Fiori
launchpad?
Please choose the correct answer.

Response:

Tile catalog

App library

Tile group

App finder

Question: Score 1 of 1

https://www.erpprep.com/node/16254/myresults/1529523 23/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Which are mandatory attributes, when you create an operating concern with
costing-based and account-based CO-PA?
There are TWO correct answers for this question

Response:

Fiscal year variant

Company code currency in costing-based CO-PA

Second period type

Operating Concern Currency

Question: Score 1 of 1

What is the difference when you perform repost line items (TA: KB61) compared
to manual reposting of costs (KB11n) for a cost center?
There are TWO correct answers for this question

Response:

The line item values are validated against the original document

The line item needs a reference to an FI document

There is the option to assign the line item to several receiver objects

The report of the line item is updated in the original F1 document

Question: Score 1 of 1

Which attributes can you configure in the activity type master record?
There are 3 correct answers to this question.

Response:

Activity type category

Price indicator

Valid cost center categories

CO version

https://www.erpprep.com/node/16254/myresults/1529523 24/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Company code

Question: Score 1 of 1

Which of the following statements are applicable to automatic account


assignment in SAP S/4HANA?
There are 2 correct answers to this question.

Response:

It can be defined for postings on general ledger accounts of secondary costs type.

It can be defined for postings on general ledger accounts of primary costs type.

It takes precedence over validation and substitution.

It can be overwritten in the application.

Question: Score 1 of 1

When you define assessment cycles for the period-end closing in overhead cost
accounting, which object can you assign to the cycle segment?

Response:

Allocation structure

Costing sheet

Template

Settlement rule

Question: Score 1 of 1

How does SAP S/4HANA capture costs?


There are 2 correct answers to this question.

Response:

All primary and secondary costs are captured by creating them as cost elements.

https://www.erpprep.com/node/16254/myresults/1529523 25/26
4/20/2020 SAP Certified Application Associate - SAP S/4HANA for Management Accounting Associates - Full | ERPPrep

Primary and secondary costs are captured in general ledger accounts.

Only primary costs are captured in general ledger accounts.

Secondary costs are captured as secondary cost elements, and NOT as general
ledger accounts.

Question: Score 1 of 1

You post an expense line in an accounting document and enter an internal order
and a cost center as the account assignments. After posting, the system allows
you to settle the posted values from the internal order.

Which settings do the cost center and internal order have?


Please choose the correct answer.

Response:

Real internal order


Real cost center

Real internal order


Statistical cost center

Statistical internal order


Real cost center

Statistical internal order


Statistical cost center

Money Back Guarantee Testimonial FAQs Privacy Policy Terms and Conditions About Us Join Us
Contact Us

https://www.erpprep.com/node/16254/myresults/1529523 26/26

You might also like