The document is a feasibility study report from June 2014 conducted by engineering firms from Finland, Bangladesh, Nepal, and Sweden. It examines forecasted traffic, both normal and long-distance diverted traffic, for the Doulatdia-Magura-Jhenaidhaha-Jessore-Khulna Road (N7) as part of the ADB Loan 2688-BAN Subregional Transport Project Preparatory Facility road component package 2.
Original Description:
4.1, Forecast Traffic (Normal and Long Distance Diverted)
The document is a feasibility study report from June 2014 conducted by engineering firms from Finland, Bangladesh, Nepal, and Sweden. It examines forecasted traffic, both normal and long-distance diverted traffic, for the Doulatdia-Magura-Jhenaidhaha-Jessore-Khulna Road (N7) as part of the ADB Loan 2688-BAN Subregional Transport Project Preparatory Facility road component package 2.
The document is a feasibility study report from June 2014 conducted by engineering firms from Finland, Bangladesh, Nepal, and Sweden. It examines forecasted traffic, both normal and long-distance diverted traffic, for the Doulatdia-Magura-Jhenaidhaha-Jessore-Khulna Road (N7) as part of the ADB Loan 2688-BAN Subregional Transport Project Preparatory Facility road component package 2.
Feasibility Study Final Report Appendix 4 Annex 4.1: Forecast Traffic (Normal and Long Distance Diverted)
Destia Finnroad, Finland
BCL Associates Ltd., Bangladesh in association with Engineering Science Ltd., Bangladesh Hifab International AB, Sweden. Devtec Nepal Pvt. Ltd., Nepal June 2014