You are on page 1of 5

Roshan Kumawat

1 PROPOSED POSITION : LA Cum SIA Expert


FAE – SE
Approved Vide RA-165th AC meeting April 06, 2018
Category “B” - Socio-Economics (SE)
NAME OF THE COMPANY : M/s Overseas Min-Tech Consultants
2 NAME OF STAFF : Roshan Kumawat
3 DATE OF BIRTH : 13th December, 1984
4 NATIONALITY : Indian
5 EDUCATION QUALIFICATION : • M.A.( Sociology) from University of Rajasthan in 2006
• B.A. from University of Rajasthan in 2004
6 COMPUTER PROFICIENCY : MS Office – Excel, Word, PowerPoint, MS Project, AutoCAD etc.
7 TRAINING : • 5 Days External training in EIA/SIA studies at Centre for
Environmental & Science, New Delhi
8 Employment Record:
From June 2005 to November, 2010
Employer Siddham Sekhshaink Sansthan
Position Held Social Development Expert & Data Analysis
Assignment or Project 1. Conducting social census data in Rajasthan district of Alwar,
Dousa, Bharatpur & Sawai Madhopur
Location: Rajasthan
Client: Rajasthan Agricultural Research Institute Durgapura
Activities performed : Responsible for baseline socio-economic survey of the entire district,
preparation of Entitlement Framework, collection of land records from
revenue department for the purpose of preparation of land acquisition plan.
Preparation of RAP to minimize negative impact of development project,
suggestive mitigation measures, implementation plan, indicative cost for
implementation, etc.

From December 2010 to 14 October, 2015


Employer Consulting Engineers Group Ltd.
Position Held Office Manager / Social Development Expert / Rehabilitation &
Resettlement Expert
Assignment or Project 1. Consultancy Services for Feasibility Study and Detailed Project
Report for 4/6 laning of Jabalpur-Rewa section of National
Highway No. 07 in the State of Madhya Pradesh. (200 km) Project
Cost: 1770 crore. (Head Office Input) (5 Man Months) (Completed).
Location: Madhya Pradesh
Client: NHAI
Main project features: Preparation of Feasibility Study Report
Detailed Project Report for 4/6 lane of Jabalpur-Rewa section of NH-7
in Madhya Pradesh.

2. Consultancy Service for Preparation of Feasibility Study Report


for rehabilitation and upgrading to 4 lane with paved shoulders
configuration of Gwalior-Dewas section of NH-3 under NHDP
Phase- IV in the state of Madhya Pradesh. Cost: INR 3153.120
Crore (Excluding Land Cost) (Head Office Input) (5 Man Months)
(Completed).
Location: Madhya Pradesh
Client: NHAI
Main project features: Preparation of Feasibility Study Report for
rehabilitation and upgrading to 4 lane with paved shoulders
configuration of Gwalior-Dewas section of NH-3 in Madhya Pradesh.

1|Page
Roshan Kumawat

3. Consultancy Services for Preparation of Detailed Project Report


for Rehabilitation and Upgradation of National Highway stretches
under NHDP-IVB for the Package of NH-56 from Lucknow –
Sultanpur -Varanasi (Approx. Length-300 Kms) section in the
State of Uttar Pradesh. Package No. NHAI/UP/DPR/NHDP-IV/01.
(Head Office Input) (5 Man Months) (Completed). Project Cost:
2248 crore.
Location: Uttar Pradesh
Client: NHAI
Main project features: Preparation of Detailed Project Report for
rehabilitation and upgrading to 4 lane of Lucknow –Sultanpur -Varanasi
section of NH-56 in Uttar Pradesh.

4. Consultancy Services for Preparation of Detailed Project Report


for Rehabilitation and Upgrading to 2 lane / 2 lane with Paved
shoulders configuration and strengthening from km 80.00
(PRATAPGARH) to km 180.00 (PADI) of NH-113 in the State of
Rajasthan. (Package No. SP/D/1) Project Cost: 292 Crore. (5 Man
Months) (Completed)
Location: Rajasthan
Client: MoRTH
Main project features: Preparation of Feasibility Study Report for
rehabilitation and upgrading to 2 lane with paved shoulders
configuration of Pratapgarh - Padi section of NH-113 in Rajasthan.

5. Consultancy Services for Preparation of Feasibility cum


Preliminary Design for 4/6 laning of Selected Stretches of National
Highways to be executed as BOT (Toll) Project on DBFO Pattern
under NHDP Phase III - PROJECT STRETCHES DEOLI-
JHALAWAR (178 km) ON NH-12 (PACKAGE NO.
NHAI/BOTII/DPR/03) (Head Office Input) (Social Expert-2 Man
Months) (Completed)
Location: Rajasthan
Client: NHAI
Main project features: Preparation of Feasibility cum Preliminary
Design for 4/6 of Deoli-Jhalawar section of NH-12 in Rajasthan.

Activities performed : As Social & LA Expert in social issues and their resolution; Data collection
and documentation progress in implementation of necessary resettlement
action plan for works by the Department, training, prepare reports,
Implementation and Maintenance of Social Management including Land
Acquisition, Interact with different agencies responsible/ concerned for with
issues like NGO’s, Asian Development Bank. Preparation of all land
acquisition schedule like 3(a), 3(A), 3(D), 3(G) etc. Valuation of properties,
asset coming under acquisition, Variation statement and submission to
Competent Authority. In addition to this, all work related to
Recommencement activities Highway Projects. Liaison with land owners,
village authorities, state government authorities & arranging villager’s/Land
Owners meeting to prove importance of the project & its benefits to them.
All type of works & arrangements related to conduct Environmental Public
Hearing. Coordinate between clients (NHAI, MoRTH, PWD), Site &
laborers

2|Page
Roshan Kumawat

Responsible for feasibility study including preparation of strip plan, baseline


socio-economic survey of the entire affected household within the corridor
of impact, preparation of Entitlement Framework, collection of land records
from revenue department for the purpose of preparation of land acquisition
plan. Preparation of RAP to minimize negative impact of development
project, suggestive mitigation measures, implementation plan, indicative
cost for implementation, etc. Conducted public awareness programme
regarding HIV / AIDS at Gram Panchayat and District level. Focus group
discussion with female groups and assisted them in enforcing their rights
during compensation settlements. The discussion focused many agendas
regarding Library, Poverty, Political awareness and various self help
groups, to whom they can approach. Rehabilitation roads according to
World Bank Policy. Counseling Road users of HIV awareness and other
diseases.
Has done work for adult / female education sponsored by GOI / GOR and
other NGO’s. Focus group discussion conducted for mainstreaming the
gender and vulnerable groups. Vocational training camps for Socio-
economic well being of the BPL and women in particular. Self financing
group for social up-liftment.

From October, 2015 To Till Date


Employer M/s Overseas Min-Tech Consultants
Position Held Social & Land Acquisition Expert
Assignment or Project 1. Consultancy Services for preparation of Feasibility Study/Detailed
Project Report of selected state road stretches for Two/four laning with
paved shoulder NH Configuration of under Bharat Mala Project
(Package-2) in the state of Gujarat 175 km. – EIA/EMP and SIA/RAP
Studies including preparation of Land Plan Schedules (LPS)
Location: Gujarat
Client: Rites Ltd.

2. Consultancy Services for preparation of Feasibility Study/ Detailed


Project Report of selected state road stretches for Two/Four laning
with paved shoulder NH Configuration of under Bharat Mala Project
(Package-13) in the state of West Bengal-330km. EIA/EMP and
SIA/RAP Studies including preparation of Land Plan Schedules (LPS)
Location: West Bengal
Client: Rites Ltd.

3. Detailed digitization of cadastral mapping and land acquisition details


for BHARATMALA PARIYOJANA PROJECT work in state Haryana.
Location: Haryana
Client: Matrix Geo

4. Social Impact Assessment study for the purpose of acquisition of land


for Siwana-Samdari Highway Project
Location: Rajasthan
Client: PWD
Main project features: Preparation of Final SIA Report for Social
Impact Assessment study for the purpose of acquisition of land for
Siwana-Samdari Highway Project

5. Social Impact Assessment study for the purpose of acquisition of land


for Bhinnmal-Pantheri-Posana-Jeevana Highway Project

3|Page
Roshan Kumawat

Location: Rajasthan
Client: PWD
Main project features: Preparation of Final SIA Report for Social
Impact Assessment study for the purpose of acquisition of land for
Bhinnmal-Pantheri-Posana-Jeevana Highway Project

6. Social Impact Assessment study for the purposes of acquisition of land


for Jodhpur-Marwar Junction – Jojawar Highway Project
Location: Rajasthan
Client: PWD
Main project features: Preparation of Final SIA Report for Social
Impact Assessment study for the purposes of acquisition of land for
Jodhpur-Marwar Junction – Jojawar Highway Project

7. Social Impact Assessment study for the purposes of acquisition of land


for Jodhpur-Marwar Junction – Jojawar Highway Project
Location: Rajasthan
Client: PWD
Main project features: Preparation of Final SIA Report for Social
Impact Assessment study for the purposes of acquisition of land for
Jodhpur-Marwar Junction – Jojawar Highway Project

8. Work for undertaking/conducting detailed Social Impact Assessment


(SIA) in one village having about 68 No. PAP and about 2.19 Hect.
land as per the Rajasthan Right to fair Compensation and
Transparency in Land Acquisition Rehabilitation and Resettlement
Rules, 2016 for construction of ROB (about 1.50 Km length) at LC No.
72 near Mawanda Village on DFCC alignment on Shahpura Chirawa
Road (SH-13).
Location: Rajasthan
Client: PWD

9. Work for undertaking/conducting detailed Social Impact Assessment


(SIA) in one village having about 30 No. PAP and about 1.45 Hect.
land as per the Rajasthan Right to fair Compensation and
Transparency in Land Acquisition Rehabilitation and Resettlement
Rules, 2016 for construction of ROB (about 0.90 Km length) at LC No.
85 near Ghassipura Village on DFCC alignment on Shahpura Chirawa
Road (SH-13).
Location: Rajasthan
Client: PWD

Activities performed : Exercising authority of Team Leader cum Social and Resettlement
Expert, Administrating the total project & Liaison with client, Assist of
ongoing operations, Social Management Plan Implementation, Land
Acquisition, surveys and investigations etc., Interacting with different
agencies responsible/concerned with issues like Revenue deptt., SDM
office, Municipal corporation, DPR consultants, Contractors etc., Advise on
project Implementation and suggest corrective measures in tackling day to
day Social problems, Assure that prescribed procedural requirements
are followed, Review of project management and Implementation plans
including work methodology.

Responsible for baseline socio-economic survey of the entire affected

4|Page
Roshan Kumawat

household within the corridor of impact, preparation of Entitlement


Framework, collection of land records from revenue department for the
purpose of preparation of land acquisition plan.

Preparation of RAP to minimize negative impact of development project,


suggestive mitigation measures, implementation plan, indicative cost for
implementation, etc. Conducted public awareness programme regarding
HIV / AIDS at Gram Panchayat and District level. Focus group discussion
with female groups and assisted them in enforcing their rights during
compensation settlements. The discussion focused many agendas
regarding Library, Poverty, Political awareness and various self-help
groups, to whom they can approach. Rehabilitation roads according to
World Bank Policy. Counseling Road users of HIV awareness and other
diseases.

Duties comprised of counseling the affected families to reconcile the


differences. Also as a part of duty, arranged training and settlement of
cases Where the parties could not mutually agreed to settle. Trained /
arranged for economic generation with the assistance of various
government departments, NGOs and other undertakings to stand their
own.

11. Certification:

I, the undersigned, certify to the best of my knowledge and belief, this CV correctly describes myself, my
qualifications and my experience. I understand that any wilful misstatement described herein may lead to my
disqualification or dismissal, if engaged

Date : 20/04/2019 Place: Jaipur


Full Name of Staff Member : Roshan Kumawat
Signature of staff member :

5|Page

You might also like