Column Footings Excavations
Column Footings Excavations
MEASURED DIMENSIONS
Position length(l) width(w) depth(d) units C/base C/base CM blinding(CM) ground comments
A2 2.2 2.4 2.3 m B4 1.17 0.528 normal
A6 2.5 2.4 2.4 m B3 0.9 0.3 medium
A7 2.2 2.1 2.5 m B3 0.9 0.231 medium
A8 2.3 2.3 1.8 m B3 0.9 0.529 rock
A9 2.5 2.3 2.2 m B3 0.9 0.575 rock
B2 2.6 2.3 2.1 m B4 1.17 0.299 normal
B7 2.2 2.4 2.2 m B3 0.9 0.264 medium
B9 2.2 2.2 2.53 M B3 0.9 0.242 rock
B8 2.5 2.6 2 m B3 0.9 0.325 medium
C2 2.5 2.2 2 m B3 0.9 0.55 rock
D7 2.6 2.9 2.2 m B2 2 0.377 medium
D8 3 2.8 2 m B2 2 0.84 medium
D9 2.2 2.6 2.4 m B3 0.9 0.572 medium
E2 3 2.8 2 m B2 2 0.42 medium
F8 3.3 3.5 2 M B1 4.375 0.0825 rock
F7 3 3 1.9 m B1 4.375 0.57 rock/medium
F9 2.1 2 0.8 m B3 0.9 0.42 rock
H7 3 3 1.9 m B2 2 0.45 rock
H8 2.9 2.6 1.2 m B2 2 0.377 rock
H9 3 2.4 2.1 m B3 0.9 0.72 rock
K7 3 2.1 1.7 m B3 0.9 0.315 medium
K8 2.4 2.4 1.2 m B3 0.9 0.288 rock
K9 2.3 2.3 1.1 m B3 0.9 0.2645 rock
L3 1.8 1.7 1.2 m B3 0.9 0.306 medium
L6 2.2 2.2 1.5 m B3 0.9 0.484 rock
L7 2.2 1.8 1.5 m B3 0.9 0.396 rock
L8 1.7 2.2 1.4 m B3 0.9 0.374 rock
L9 2.1 2.5 1.4 m B3 0.9 0.525 rock
Totals 38.19 11.624
PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: COLUMN AND COLUMN BASE EXCAVATIONS
Excavated
12.44
14.4
11.55
9.522
12.65
12.558
11.616
12.2452
13
11
16.588
16.8
13.728
16.8
23.1
17.1
3.36
17.1
9.048
15.12
10.71
6.912
5.819
3.672
7.26
5.94
5.236
7.35
322.6242
PROJECT: MCK MAUA SYNOD YOUTH CENTER
ITEM: MEDIUM COLUMN AND COLUMN BASE EXCAVATIONS
MEASURED DIMENSIONS
Position length(l) width(w) depth(d) units C/base C/base CM blinding(CM)
A6 2.5 2.4 2.4 m B3 0.9 0.3
A7 2.2 2.1 2.5 m B3 0.9 0.231
B7 2.2 2.4 2.2 m B3 0.9 0.264
B8 2.5 2.6 2 m B3 0.9 0.325
D7 2.6 2.9 2.2 m B2 2 0.377
D8 3 2.8 2 m B2 2 0.84
D9 2.2 2.6 2.4 m B3 0.9 0.572
E2 3 2.8 2 m B2 2 0.42
K7 3 2.1 1.7 m B3 0.9 0.315
L3 1.8 1.7 1.2 m B3 0.9 0.306
totals 12.3 3.95
PROJECT: MCK MAUA SYNOD YOUTH CENTER
ITEM: MEDIUM COLUMN AND COLUMN BASE EXCAVATIONS
MEASURED DIMENSIONS
Position length(l) width(w) depth(d) units C/base C/base CM blinding(CM)
A8 2.3 2.3 1.8 m B3 0.9 0.529
A9 2.5 2.3 2.2 m B3 0.9 0.575
B9 2.2 2.2 2.53 M B3 0.9 0.242
C2 2.5 2.2 2 m B3 0.9 0.55
F8 3.3 3.5 2 M B1 4.375 0.0825
F7 3 3 1.9 m B1 4.375 0.57
F9 2.1 2 0.8 m B3 0.9 0.42
H7 3 3 1.9 m B2 2 0.45
H8 2.9 2.6 1.2 m B2 2 0.377
H9 3 2.4 2.1 m B3 0.9 0.72
K8 2.4 2.4 1.2 m B3 0.9 0.288
K9 2.3 2.3 1.1 m B3 0.9 0.2645
L6 2.2 2.2 1.5 m B3 0.9 0.484
L7 2.2 1.8 1.5 m B3 0.9 0.396
L8 1.7 2.2 1.4 m B3 0.9 0.374
L9 2.1 2.5 1.4 m B3 0.9 0.525
totals 23.55 6.847
PROJECT: MCK MAUA SYNOD YOUTH CENTER
ITEM: ROCK COLUMN/COLUMN BASES EXCAVATIONS
MEASURED DIMENSIONS
Position length(l) width(w) depth(d) units C/base C/base CM blinding(CM)
A2 2.2 2.4 2.3 m B4 1.17 0.528
B2 2.6 2.3 2.1 m B4 1.17 0.299
totals 2.34 0.827
PROJECT: MCK MAUA SYNOD YOUTH COMPLEX
ITEM: NORMAL GROUND COLUMN/COLUMN BASES EXCAVATIONS
BASE NUMBER
B1 1
B2 5
B3 18
B4 2
TOTALS 26
PROJECT: MCK MAUA SYNOD YOUTH CENTER
ITEM: SUMMARY OF THE COLUMN BASE CONCRETE AND EXCAVATIONS CM
week 6 • site setting out by the • excavator • Due to the steep and unstable
7th - 12th contractor under the engineer's • Tipper(1) terrain resulting from
Aughust supervision. • Grinder the excavation process, the
• initial excavation of the • Personell decision was made to employ
trenches human personnel for rock
and column bases. breaking instead of mechanical
• site visit by the projects's compressors.
committee chairman -
Mugambi winners.
• disposal of the excavated
material.
• Continuing excavation for
column base preparations by
personnel
PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT