PROJECT :MCK NYAMBENE SYNOD YOUTH CENTRE

ITEM: COLUMN AND COLUMN BASE EXCAVATIONS

C/Base measured(L ength*width*depth) column base(plan) excavated CM ground comments


A2 2.2 X 2.4 X 2.3m B4 12.144 normal
A6 2.5 X 2.4 X 2.4m B3 14.4 medium
A7 2.2 X 2.1 X 2.5m B3 11.55 medium
A8 2.3 X 2.3 X 1.8m B3 9.522 rock
A9 2.5 X 2.3 X 2.2m B3 12.65 rock
B2 2.6 X 2.3 X 2.1m B4 12.558 normal
B7 2.2 X 2.4 X 2.2m B3 11.616 medium
B8 2.5 X 2.6 X 2.0m B3 13 medium
C2 2.5X 2.2 X 2.0m B3 11 rock
D7 2.6 X 2.9 X 2.2m B2 16.588 medium
D8 3.0 X 2.8 X 2.0m B2 16.8 medium
D9 2.2 X 2.6 X 2.4m B3 13.728 medium
E2 3.0 X 2.8 X 2.0m B2 16.8 medium
F7 3 X 3 X 1.9m B1 17.1 rock/medium
F9 1.1 X 2.0 X 0.8m B3 1.76 rock
H7 3 X 3 X 1.9m B2 17.1 rock
H8 2.9 X 2.6 X 1.2m B2 9.048 rock
H9 3.0 X 2.4 X 2.1m B3 15.12 rock
K7 3.0 X 2.1 X 1.7m B3 10.71 medium
K8 2.4 X 2.4 X 1.2m B3 4.56 rock
K9 2.3 X 2.3 X 1.1m B3 5.89 rock
L3 1.8 X 1.7 X 1.2m B3 3.672 medium
L6 2.2 X 2.2 X 1.5m B3 7.26 rock
L7 2.2 X 1.8 X 1.5m B3 5.94 rock
L8 1.7 X 2.2 X 1.4m B3 5.236 rock
L9 2.1 X 2.5 X 1.4m B3 7.35 rock
total 283.102
PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: COLUMN AND COLUMN BASE EXCAVATIONS

MEASURED DIMENSIONS
Position length(l) width(w) depth(d) units C/base C/base CM blinding(CM) ground comments
A2 2.2 2.4 2.3 m B4 1.17 0.528 normal
A6 2.5 2.4 2.4 m B3 0.9 0.3 medium
A7 2.2 2.1 2.5 m B3 0.9 0.231 medium
A8 2.3 2.3 1.8 m B3 0.9 0.529 rock
A9 2.5 2.3 2.2 m B3 0.9 0.575 rock
B2 2.6 2.3 2.1 m B4 1.17 0.299 normal
B7 2.2 2.4 2.2 m B3 0.9 0.264 medium
B9 2.2 2.2 2.53 M B3 0.9 0.242 rock
B8 2.5 2.6 2 m B3 0.9 0.325 medium
C2 2.5 2.2 2 m B3 0.9 0.55 rock
D7 2.6 2.9 2.2 m B2 2 0.377 medium
D8 3 2.8 2 m B2 2 0.84 medium
D9 2.2 2.6 2.4 m B3 0.9 0.572 medium
E2 3 2.8 2 m B2 2 0.42 medium
F8 3.3 3.5 2 M B1 4.375 0.0825 rock
F7 3 3 1.9 m B1 4.375 0.57 rock/medium
F9 2.1 2 0.8 m B3 0.9 0.42 rock
H7 3 3 1.9 m B2 2 0.45 rock
H8 2.9 2.6 1.2 m B2 2 0.377 rock
H9 3 2.4 2.1 m B3 0.9 0.72 rock
K7 3 2.1 1.7 m B3 0.9 0.315 medium
K8 2.4 2.4 1.2 m B3 0.9 0.288 rock
K9 2.3 2.3 1.1 m B3 0.9 0.2645 rock
L3 1.8 1.7 1.2 m B3 0.9 0.306 medium
L6 2.2 2.2 1.5 m B3 0.9 0.484 rock
L7 2.2 1.8 1.5 m B3 0.9 0.396 rock
L8 1.7 2.2 1.4 m B3 0.9 0.374 rock
L9 2.1 2.5 1.4 m B3 0.9 0.525 rock
Totals 38.19 11.624
PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: COLUMN AND COLUMN BASE EXCAVATIONS

Excavated
12.44
14.4
11.55
9.522
12.65
12.558
11.616
12.2452
13
11
16.588
16.8
13.728
16.8
23.1
17.1
3.36
17.1
9.048
15.12
10.71
6.912
5.819
3.672
7.26
5.94
5.236
7.35
322.6242
PROJECT: MCK MAUA SYNOD YOUTH CENTER
ITEM: MEDIUM COLUMN AND COLUMN BASE EXCAVATIONS

MEASURED DIMENSIONS
Position length(l) width(w) depth(d) units C/base C/base CM blinding(CM)
A6 2.5 2.4 2.4 m B3 0.9 0.3
A7 2.2 2.1 2.5 m B3 0.9 0.231
B7 2.2 2.4 2.2 m B3 0.9 0.264
B8 2.5 2.6 2 m B3 0.9 0.325
D7 2.6 2.9 2.2 m B2 2 0.377
D8 3 2.8 2 m B2 2 0.84
D9 2.2 2.6 2.4 m B3 0.9 0.572
E2 3 2.8 2 m B2 2 0.42
K7 3 2.1 1.7 m B3 0.9 0.315
L3 1.8 1.7 1.2 m B3 0.9 0.306
totals 12.3 3.95
PROJECT: MCK MAUA SYNOD YOUTH CENTER
ITEM: MEDIUM COLUMN AND COLUMN BASE EXCAVATIONS

ground comments Excavated


medium 14.4
medium 11.55
medium 11.616
medium 13
medium 16.588
medium 16.8
medium 13.728
medium 16.8
medium 10.71
medium 3.672
128.864
PROJECT: MCK MAUA SYNOD YOUTH CENTER
ITEM: ROCK COLUMN/COLUMN BASES EXCAVATIONS

MEASURED DIMENSIONS
Position length(l) width(w) depth(d) units C/base C/base CM blinding(CM)
A8 2.3 2.3 1.8 m B3 0.9 0.529
A9 2.5 2.3 2.2 m B3 0.9 0.575
B9 2.2 2.2 2.53 M B3 0.9 0.242
C2 2.5 2.2 2 m B3 0.9 0.55
F8 3.3 3.5 2 M B1 4.375 0.0825
F7 3 3 1.9 m B1 4.375 0.57
F9 2.1 2 0.8 m B3 0.9 0.42
H7 3 3 1.9 m B2 2 0.45
H8 2.9 2.6 1.2 m B2 2 0.377
H9 3 2.4 2.1 m B3 0.9 0.72
K8 2.4 2.4 1.2 m B3 0.9 0.288
K9 2.3 2.3 1.1 m B3 0.9 0.2645
L6 2.2 2.2 1.5 m B3 0.9 0.484
L7 2.2 1.8 1.5 m B3 0.9 0.396
L8 1.7 2.2 1.4 m B3 0.9 0.374
L9 2.1 2.5 1.4 m B3 0.9 0.525
totals 23.55 6.847
PROJECT: MCK MAUA SYNOD YOUTH CENTER
ITEM: ROCK COLUMN/COLUMN BASES EXCAVATIONS

ground comments Excavated


rock 9.522
rock 12.65
rock 12.2452
rock 11
rock 23.1
rock/medium 17.1
rock 3.36
rock 17.1
rock 9.048
rock 15.12
rock 6.912
rock 5.819
rock 7.26
rock 5.94
rock 5.236
rock 7.35
168.7622
PROJECT: MCK MAUA SYNOD YOUTH COMPLEX
ITEM: NORMAL GROUND COLUMN/COLUMN BASES EXCAVATIONS

MEASURED DIMENSIONS
Position length(l) width(w) depth(d) units C/base C/base CM blinding(CM)
A2 2.2 2.4 2.3 m B4 1.17 0.528
B2 2.6 2.3 2.1 m B4 1.17 0.299
totals 2.34 0.827
PROJECT: MCK MAUA SYNOD YOUTH COMPLEX
ITEM: NORMAL GROUND COLUMN/COLUMN BASES EXCAVATIONS

ground comments Excavated


normal 12.44
normal 12.558
24.998
PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: COLUMN AND COLUMN BASE EXCAVATIONS

BASE NUMBER
B1 1
B2 5
B3 18
B4 2
TOTALS 26
PROJECT: MCK MAUA SYNOD YOUTH CENTER
ITEM: SUMMARY OF THE COLUMN BASE CONCRETE AND EXCAVATIONS CM

BASE CONDITION BASE QTY BASE CONCRETE CM EXCAVATED EARTH CM UNIT


Normal 2 2.34 24.998 M
Medium 10 12.3 128.864 M
Rock 16 23.55 168.7622 M
TOTAL 38.19 322.6242 M
PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


Week 1 • Site clearance • Power saw
3rd - 8th July • Cutting large trees • People
• Cutting timber

Week 2 • • Awaiting delivery of the


9th - 15th July excavator.

week 3 • Excavation of the top soil. • Excavator • Encountered challenges with


17th - 22nd • Excavation of oversite to • Tipper(2) getting sites for the disposal of
July reduce levels. • Grinder the material
• Disposal of the excavated
material.
• 1st Delivery of Rebars.
• Commencing rebar
fabrication for sub-level
columns and bases.
PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


week 4 • More excavation of oversite • Excavator • Encountered challenges with
24th - 29th to reduce levels. • Tipper(2) the county government officials
July • Disposal of the excavated • Grinder demanding payment for hauling
material. of materials withing the town
• Continuing rebar fabrication area
for sub-level columns and
bases.
• Fence construction on the
grounds upper side.
• Church members site visit

week 5 • More excavation for • Excavator • Shortage of D8 rebars.


31st July - 5th levelling the ground and added • Tipper(2) • Excavator encountered
Aughust the excavation area than • Grinder layered rock which it was
initialy discussed to have more unable to remove.
space for the building backside.
• Disposal of the excavated
material.
• Continuing rebar fabrication
for sub-level columns and
bases.
• store construction

week 6 • site setting out by the • excavator • Due to the steep and unstable
7th - 12th contractor under the engineer's • Tipper(1) terrain resulting from
Aughust supervision. • Grinder the excavation process, the
• initial excavation of the • Personell decision was made to employ
trenches human personnel for rock
and column bases. breaking instead of mechanical
• site visit by the projects's compressors.
committee chairman -
Mugambi winners.
• disposal of the excavated
material.
• Continuing excavation for
column base preparations by
personnel
PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


week 7 • Excavation and levelling • Due to the challenging
14th - 19th of the trenches and column terrain, a significant increase in
Aughust bases by human personell. personnel was necessary,
• Delivery of 2- 10k litres tanks, primarily because many of the
heavy duty garden hoses(3), & bases consisted of layered rock
associated plumbing of the
tanks.

week 8 • blinding of column bases • mixer • Delays in the blinding and


21st - 26th • Placing column base rebars • vibrator concreting processes were
Aughust and securing columns to the encountered due to terrain
bases. constraints. Space limitations
• concreting of the column and rocky terrain necessitated
bases to c20/20. personnel to manually
• delivery of sand and ballast. transport concrete using
• delivery of D8 rebars. buckets instead of
• Site visit by the project's wheelbarrows.
committee chairman.
PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


week 9 • machine crushed ballast • mixer • bishop commended the
28th - 2nd delivered. • vibrator work done and had a small
Aughust • sand delivery by tipper. discussion with the contractor
• column bases concreting about the retaining wall.
to c20/20 concrete class.
• blinding layer for the strip
foundation.
• laying strip's foundation
bars.
• concreting of the strip
foundation to c20/20.
• 9 x 9 quarry blocks delivery
• preparation of cubes for the
cube test.
• site visit by the bishop.
PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: PROGRESS REPORT

DATE DESCRIPTION OF WORKS EQUIPMENT OBSERVATION


PROJECT: MCK NYAMBENE SYNOD YOUTH CENTER
ITEM: REINFORCEMENT TO COLUMN COLUMN BASES

Column/Column base DESCRIPTION OF WORKS WEIGHT NUMBER TOTAL