You are on page 1of 4

CURRICULUM VITAE

1. Proposed Position : Jr. Planning Engineer


2. Name of Firm : National Development Consultants (Pvt.) Limited
3. Name of Staff : Arsalan Javed
4. Profession : Civil Engineer
5. Date of Birth : July 12, 1995
6. Nationality : Pakistani
7. Membership in Professional Societies:
 Member Pakistan Engineering Council CIVIL/43523
8. Key Qualifications:
Engr. Arsalan Javed is an experienced Civil Engineer possesses more than 6 years’ experience in Planning &
Scheduling, Cost Estimation, Monitoring and Control, Budgeting and Cost Control. He is well versed in
preparation of project plans & schedules according to standards, contract specifications and accepted Project
Management practices, generate detailed work plan, critical activities/path, planned/progress S-Curves, Budget
Histogram/planned distribution tables, Resource Histogram/planned distribution tables etc. Persistent in
determining tasks steps in detail, dependencies & relationships in order to attain a realistic schedule resulting to
logical & sound identification of Critical Path Experience in Schedule Revisions for Variation/Change Orders &
Extensions of Time and delay analysis.
 From Nov 2021 to Present: Working as Deputy Manager Plans on Lillah Jhelum Road Project with Frontier
Works Organization (FWO).
 From Mar 2021 to Nov 2021: Worked as Planning Engineer on 10.2MW Jabori Hydropower Project with
Ghulam Rasool & Company
 From Feb 2017 to Mar 2021: Worked as Assistant Manager Plans on Lahore Sialkot Motorway Project with
Frontier Works Organization (FWO).
 From Oct 2016 to Jan 2017: Worked as Quantity Surveyor on Misaq ul Mall Shopping Center Faisalabad
with Unique Construction Services
9. Education:
- B.Sc. Civil Engineering from University College on Engineering Science and Technology Lahore.
Computer Skills:
- MS Office (World, Excel & Power Point)
- AutoCAD
- Sketchup Pro
- Primavera P6
- Email Communication
- Internet Searching
Training & Courses:
- On Job Training as Planning Engineer.

10. Employment Record:


 From Nov 2021 to date:
Employer Frontier Works Organization
Position Held Deputy Manager Plans
Project Lillah to Jhelum Road Project
Description of Duties

CV-Arsalan Javed Page 1 of 4


 Initiate, prepare & develop project plans & schedules according
to standards, contract specifications and accepted Project
Management practices.
 Coordinate with the Project Manager, Site Manager, Site
Engineers, Job Estimators, Engineers of various disciplines etc
to acquire proper data and specifications for the schedule.
 Analyze drawings, specifications & method statements of works
for the preparation of activity networks / scheduling / resources
planning and allocation.
 Develop major milestone activities & establish a well-defined
Work Breakdown Structure, which includes all the scopes of
work.
 Establish the Schedule based on key dates, mile stone dates,
scope of works, resource loading etc, as specified in the
contract.
 Assign duration, resources (Manpower, Materials and
Equipment’s) and Budgeted Cost for each activity based on their
weight factor & quantity/volume of work. And identify Long Lead
items required in the Project.
 Generate detailed work plan, critical activities/path,
planned/progress S-Curves, Budget Histogram/planned
distribution tables, Resource Histogram/planned distribution
tables etc.
 Coordinate schedule from multiple sub-contractors / vendors and
incorporate the information gathered into the overall project
master schedule.
 Develop databases for Engineering deliverables, Procurement
deliverables and Construction activities for
monitoring/analyzing/tracking progresses.
 Review, analyze & refine sequence and logic of tasks/activities
and highlight any critical activity needs particular attention
 From Mar 2021 to Nov 2021:
Employer Ghulam Rasool & Company
Position Held Planning Engineer
Project 10.2 MW Jabori Hydropower Project
Description of Duties:
 Preparation of Baseline Schedule according to the Time, Working
Environment, Resources and Scope of work.
 Calculating resources required, establishing standard and protocols,
allocating resources, scheduling and coordinating staff and sub-
contractors, evaluating mile stone assumptions and conclusions,
resolving design problems etc.
 Integration of construction work packages with Procurement
deliveries and Engineering Work Packages.
 Preparation of Level 3 and Level 4 plan for better monitoring and
control of the project.
 Construction, Planning, Supervision and Monitoring of 132KV
transmission line from Jabori Switchyard to Battal Grid Station.
 Procurement for the construction material of 132KV transmission line
from Jabori to Battal Grid Station.
 Supervision of Sub-Contractor’s working for tower erection and

CV-Arsalan Javed Page 2 of 4


conductor stringing at 132KV transmission line.
 Preparation of BOQ of items/activity and dealing with Construction
Sub-Contractor.
 Quality Inspection Plan and Project Progress Monitoring procedures
finalization and submission.
 Document Control Register preparation by coordination with different
engineering departments i.e. Piping, Process, E &I, Rotary,
Mechanical and Civil.
 Preparation of progress report/presentation and coordination with
client, Consultant and Contractor Higher Management.
 Coordination with MC and Client regarding the Site Related
Contractual obligation.
From Feb 2017 to Mar 2021:
Employer Frontier Works Organization (FWO)
Position Held Assistant Manager Plans & Cost Controller
Project Lahore Sialkot Motorway Project
Description of Duties
 Preparation of Baseline Schedule
 According to project baseline; monitoring and controlling project with
respect to cost, resource deployment, time over- runs and quality
compliance to ensure satisfactory execution of project
 Organizing project proposals to include estimates, preliminary
budgets, construction schedules & timing
 Generating periodic status & cost reports for apprising management
of project progress
 Reviewing and analyzing contract financial data for facilitating
development & proceedings
 Keeping close track of daily project costs against the accepted cost
estimate for the project; monitoring sales/invoice Vs monthly cost
basis to maintain profitability during project life cycle
 Implemented Cost Control strategies by means of monitoring &
reporting to management of project costs monthly basis, spreading
over the cost awareness to site engineers, suggesting improvement
of labour productivity, subcontract workrate & progress of work,
utilization plan of plants & so on to minimize the chances of forecast
cost overrun & to finish the project on time
From Oct 2016 to Jan 2017
Employer Unique Construction Services
Position Held Quantity Surveyor
Project Misaq ul Mall Shopping Center Faisalabad
Description of Duties:
 Cost Estimation of project items
 Preparation of bar bending schedule and forward the same to site
supervisors for execution of work accordingly
 Preparation of Bills and submitting to Clients
 Attending the meeting with Clients & design team

CV-Arsalan Javed Page 3 of 4


 Supervision of Site work and provide technical assistance Keep /
Maintain the record of project documentation
11. Languages:

Language Speaking Reading Writing


English Good Good Good
Urdu Good Good Good
Punjabi Good Good Good

12. Certification:

I, the undersigned, certify that to the best of my knowledge and belief, this bio-data correctly describes myself, my
qualifications and my experience.

___________________ _________________________ Date November 2022


Signature of Staff Member Counter Signature – Sr. Manager Day/Month/Year
Project Coordination Div., NDC

CV-Arsalan Javed Page 4 of 4

You might also like