The document provides a list of mechanical and electrical works for Unit D12 (Type B.2) including:
1) Plumbing works such as installing jet pumps, booster pumps, water tanks, septic tanks, pipes, valves, and manholes.
2) HVAC works like installing wall-mounted air conditioning units, refrigerant pipes, electrical wiring on each floor.
3) Drainage pipes for air conditioning condensation water.
The document estimates the total costs for the plumbing works at Rp. 42,179,489 and HVAC works at Rp. 8,612,944.
The document provides a list of mechanical and electrical works for Unit D12 (Type B.2) including:
1) Plumbing works such as installing jet pumps, booster pumps, water tanks, septic tanks, pipes, valves, and manholes.
2) HVAC works like installing wall-mounted air conditioning units, refrigerant pipes, electrical wiring on each floor.
3) Drainage pipes for air conditioning condensation water.
The document estimates the total costs for the plumbing works at Rp. 42,179,489 and HVAC works at Rp. 8,612,944.
The document provides a list of mechanical and electrical works for Unit D12 (Type B.2) including:
1) Plumbing works such as installing jet pumps, booster pumps, water tanks, septic tanks, pipes, valves, and manholes.
2) HVAC works like installing wall-mounted air conditioning units, refrigerant pipes, electrical wiring on each floor.
3) Drainage pipes for air conditioning condensation water.
The document estimates the total costs for the plumbing works at Rp. 42,179,489 and HVAC works at Rp. 8,612,944.
D.2.3. PEKERJAAN MEKANIKAL ELEKTRIKAL UNIT D12 (TIPE B.2) Sat Qty Harga Satuan Rp.
D.2.3.1 PEKERJAAN PLUMBING
A JET PUMP 01 cap. 50 LPM, head 30 M, beserta pressure tank dan unit 1 3.597.775 3.597.775 pengkabelannya. (Ex. Ebara, Shimizu) B BOOSTER PUMP cap. 30 LPM beserta pressure tank dan pengkabelannya. unit 1 1.073.500 1.073.500 (Prov) (Ex. Ebara, Shimizu) C Water Torn kapasitas 1000 Liter dari Fiber (ex. Whale, Penguin) unit 1 1.762.950 1.762.950 D Septictank Biofill dari Fiber kap.2m3 lengkap dengan pipa vent, ex.Lokal lot 1 8.330.738 8.330.738 E Ground tank dari water torn kap.1m3 (ex. Whale, Penguin) dicover dinding unit 1 4.658.493 4.658.493 bata ringan diplester dan ditutup cor beton bertulang tbl.10cm AIR BERSIH F Pipa uPVC AW Ø 1½" (ex. Wavin, Genova, Rucika, Vinilon) m 35 30.460 1.066.100 - 21.848 G Pipa uPVC AW Ø 1 " (ex. Wavin, Genova, Rucika, Vinilon) m 35 764.694 - 18.816 H Pipa uPVC AW Ø 3/4 " (ex. Wavin, Genova, Rucika, Vinilon) m 30 564.480 - I ball valve Ø 1 " (ex. Onda) bh 4 52.500 210.000 - J ball valve Ø 3/4 " (ex. Onda) bh 1 42.500 42.500 - K floater valve Ø 1 " (ex. Onda) bh 2 328.600 657.200 - L foot valve Ø 3/4 " (ex. Onda) bh 1 - - AIR HUJAN - M Pipa uPVC AW Ø 4" (AH) provisional (ex. Wavin, Genova, Rucika, Vinilon) m 45 95.566 4.300.459 - N Pipa uPVC AW Ø 2 1/2" (AH) provisional (ex. Wavin, Genova, Rucika, Vinilon) m 55 44.705 2.458.775 - O Roof drain Ø 2 1/2" (AH) provisional (ex. Onda) bh 6 196.000 1.176.000 - P bak kontrol 400x400x 400 mm c/w concrete man hole bh 1 331.402 331.402 - - AIR KOTOR DAN AIR BEKAS Q Pipa uPVC AW Ø 4" (AK) (ex. Wavin, Genova, Rucika, Vinilon) m 50 - 95.566 4.778.288 R Pipa uPVC AW Ø 4" (ABK) (ex. Wavin, Genova, Rucika, Vinilon) m 53 95.566 5.064.985 - S Pipa uPVC AW Ø 2 1/2" (ABK) (ex. Wavin, Genova, Rucika, Vinilon) m 30 44.705 1.341.150 - T FCO Ø 4" (ex. Onda) bh 4 - - U Alat bantu + fitting-fitting, reducer, tee, elbow, dll lot 1 TERMASUK
JUMLAH D.2.3.1 42.179.489
D.2.3.2 PEKERJAAN VAC
V OU~FCU- 12.000 btu/h, wall mounted, Lantai 1 unit 2 BY TENANT W Pipa Ø 5/8" + Ø 3/8 " (refrigerant) m 26 - X NYM 3 x 4 mm2 (OU-IU) m 28 29.500 826.000 Y OU~FCU- 12.000 btu/h, wall mounted, Lantai 2 unit 2 BY TENANT Z Pipa Ø 5/8" + Ø 3/8 " (refrigerant) m 26 - AA NYM 3 x 4 mm2 (OU-IU) m 28 29.500 826.000 AB OU~FCU- 12.000 btu/h, wall mounted, Lantai 3 unit 2 BY TENANT AC Pipa Ø 5/8" + Ø 3/8 " (refrigerant) m 26 - AD NYM 3 x 4 mm2 (OU-IU) m 28 29.500 826.000 AE OU~FCU- 12.000 btu/h, wall mounted, Lantai 4 unit 2 BY TENANT AF Pipa Ø 5/8" + Ø 3/8 " (refrigerant) m 26 - AG NYM 3 x 4 mm2 (OU-IU) m 28 29.500 826.000 Pipa drain AK Pipa uPVC AW Ø 1" + isolasi m 72 21.848 1.573.056 AL Pipa uPVC AW Ø 3/4" + isolasi m 128 18.816 2.408.448 AM Pipa uPVC AW Ø 1/2" + isolasi m 80 16.593 1.327.440