BILL OF QUANTITY (BQ)

PEKERJAAN PENGADAAN UNIT PERTASHOP 3 KL GENE


PT PERTAMINA RETAIL

NO SAT
U R A I A N P E K E R J AA N
. .

A PEKERJAAN TANGKI
Tangki Double Wall Kapasitas 3 KL Follow Standar UL 142 + Thermal Insulation
Dimensi Tangkl Outer: 1400 x 1880 x 1800 mm = 3,5 KI
1 MildSteel A36 atau SS400 tebal 6 mm double wall tank Kg
Include :
Loading Port Oio 2“ Set
’Suction Port Dia 1-1/2” Set
Emergency Vent Port Dia 6" Set
* Dipping Port Dia 2" Set
PV Vent Port Dia 2" Set
* Manual Tank Gauge Port 2" Set
Leakage For Insulation Concrate Port Oio.J" Set
* Leakage Detection Dia 1” Set
Emboss Serial No. Per Tangki Set
* Foot Tank with Nut and Bolt Set
Perlite Insulating Concrete Fire Protection tebal 75 mm (Heat Insulation) Kg
Sublasting & Finishing Outer Tank Cat Epoxy warna Putih m2
4 Internal Tank Fluid Level - Volume Table / Tabel Tangki Set
5 Emergency Vent, Diameter 6", 2600DD scfh, Primary and secondary tank Set
6 Manual Tank Gauge Set

SUB TOTAL - I
PEKERJAAN MECHANICAL (PERPIPAAN)
1 a. Inlet Pipe to Tank wlth accessories terpasang
* Pipa Black Steel Sch.40 Dia. 2" Set
* Incl. Camlock Type A Dia 2" w/couer Set
* Incl. Tee Connection with drapline/extension pipe perforated Set
Termasuk Equipment Support Pipa Lengkap (Isolation Oil Resistant, Bracket, dll) Ls
b. Outlet Pipe to Dispenser with accessories terpasang
* Pipa B/ock Stee/ Sc/i.40 Dia. 1-1/2" Set
* Termasuk Equipment Support Pipa Lengkap (Isolation Oil Resistant, Bracket, dll) Ls
2 Flange, Gasket Oil Resistant (”setara klingrit), bounding cable for flange, Elbow, Socket, Plug (Steel Oil Resistant) Ls
3 Overfill Prevention Valve Dia 2" Pcs
4 Foot Valve Dia 1-1/2" (Steel Oil Resistant) Pcs
5 Ball Valve Dia 2" (Steel Oil Resistant) Pcs
6 Check Valve Dia. 2" Threded Pcs
7 Ball Valve Dia 1-1/2” (Steel Oil Resistant) Pcs
8 Ball Valve Dia 1-1/2” (Steel Oil Resistant) tipe Three Piece Pcs
PV Vent Flame Arrester Dia 2” with extension pipe blacksteel sch.40 Set
10 Anti Siphon Valve Dia. 1-1/2" Outlet Pipe Pcs
11 Emergency Shut off valve (Inlet : Female dan Outlet : Male) Set

SUB TOTAL- II
UANTITY (BQ)
T PERTASHOP 3 KL GENERASI 3
MINA RETAIL
HARGA SATUAN JUMLAH HARGA
VOL MATERIAL JASA MATERIAL JASA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
IV v VI VII VIII

1,518.17 15000 22,772,550.00


1.00
1.00
2.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1,050
17.07
1.00
2.00
1.00

1.00
2.00
1.00
1.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
U R A I A N P E K E R J AA N
NO SAT
. .

C PEKERJAAN COMPARTMENT
Compartment Dimensi Luar 1900 x 2200 x 2200 mm dan Accessories Terpasang
1 Rangka Utama Container (Frame dan Based)
” IWF 150 x 75 x 7mm
* Hollow 100 x 100 x 2,3mm
” Hollow 50 x 50 x 2,3mm
* CNP 200 x 75mm
” UNP 50 x 38 x 6 x 8mm
2 Dinding, Alas & Atap Container
” Plat Dinding tebal 2 mm Incl. ventilasi pada sisi container with nut and bolt (Khusus area Tangki) Kg
* Plat Bordes tebal 3,2 mm (alas bandwall kemiringan 1 Derajat) Kg
” Dudukan Dispenser, inEI. dinding dan dop drain bandwall Ls
* Name Plate Unit (Fabrikator, Serial No. dan Tahun Produksi) Pcs
3 Rolling Door Aluminium berkisi partial perforated with box plat metal m2
4 Lifting Lug 4 titik corner Titik
5 Sandblasting Finishing Interior dan Exterior warna Putih & Hitam standar dan Merah Pantone Pertamina 186 C unit
6 Acrilic (Sign Produk) dan sticker unit (setara 3M), Penashop, produk, dilarang merokok & zona berbahaya (kanan, kiri dan belakang)
serta ketentuan rambu lainnya
7 Tangga Knockdown Unit
8 Wadah Tumpahan Detachable with Ball Valve (wadah tumpahan) loading Set
9 Pekerjaan Listplang Kanopi Keliling m’
” Hollow 30x30x1,5
”Siku 60x60
”ACP Warna Merah Pantone Pertamina 186 C
”Aluminium Plat Warna Putih bagian bawah canopy
”Cutting sticker scotlite list keliling dan background logo Pertamina Putih
”Stickering logo Pertamina
”Sealant dan finishing cat duco
” Plat Aluminium penutup bagian dalam listplang

SUB TOTAL- III


D PEKERJAAN ELECTRICAL
1 Kabel NYFGBY 4 x 2,5mm Incl. Accessories terpasang
” Untuk Koneksi lampu dan Dispenser
2 Kabel Conduit (Flexible & Pipe) metal & Gland Cable metal terpasang Ls
3 Pemasangan Bonding Dispenser dan Tangki ke Body Container, Copper Rod 5/8” @1 batang dan kabel grounding BC 35mm Ls

4 Lampu Explosion Proof dan aksesoris terpasang Unit

SUB TOTAL - IV
JUMLAH TOTAL
JUMLAH MATERIAL + JASA
KEUNTUNGAN & RESIKO 10%
JUMLAH
DIBULATKAN
TERBILANG :
“ Harga belum termasuk ppn 10A
Jakarta, Agustus 2020
Dibuat : Technical Manager
VOL HARGA SATUAN JUMLAH HARGA
MATERIAL JASA MATERIAL JASA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
IV V VI VII VIII

140.35
83.94
125.91
22.37
7.17

363.19
15.23
1.00
1.00
3.06
4.00
1.00
1.00

1.00
1.00
12.10

10.00

1.00
1.00

1.00

Jakarta, Agustus 2020