This document is a checklist for preparing an activity from October 3-5, 2022 in Kupang, Indonesia. It lists the equipment, materials, logistics, and confirmations needed including budget, facilitators, venue, accommodations, transportation, and more. Susi is the main point of contact and is working with a team to finalize items like itineraries, attendance lists, transport allowances and per diems, laptops, and stationery ahead of the activity. Several items are still being processed or confirmed including lodging arrangements, vehicle schedules, and LCD projectors.
This document is a checklist for preparing an activity from October 3-5, 2022 in Kupang, Indonesia. It lists the equipment, materials, logistics, and confirmations needed including budget, facilitators, venue, accommodations, transportation, and more. Susi is the main point of contact and is working with a team to finalize items like itineraries, attendance lists, transport allowances and per diems, laptops, and stationery ahead of the activity. Several items are still being processed or confirmed including lodging arrangements, vehicle schedules, and LCD projectors.
This document is a checklist for preparing an activity from October 3-5, 2022 in Kupang, Indonesia. It lists the equipment, materials, logistics, and confirmations needed including budget, facilitators, venue, accommodations, transportation, and more. Susi is the main point of contact and is working with a team to finalize items like itineraries, attendance lists, transport allowances and per diems, laptops, and stationery ahead of the activity. Several items are still being processed or confirmed including lodging arrangements, vehicle schedules, and LCD projectors.
TOR 1 Hadi Prepared Budget 1 Susi Signed Additional Budget X X X SBA 1 Tri, Susi Ongoing process PR/PO/CO 1 Tri, Susi Ongoing process GL & Rooming List 1 Susi not yet Materials Softfiles Ito Creating Gdrive Folder Daftar Hadir Google 3x Ito not yet Facilitators & Narsum Kemkes & Cluster Kemkes, Susi, Hermin, Lenny, Fius Ongoing process Itinerary (facilitators) 1 Susi not yet Invitation and Lampirans 1 Susi, Vian, Ois, Fius Done Staff Attendance (as in TOR) Susi, Lenny not yet Lodging 3-4 Oct'22 All MCGL Staff offline Susi Ongoing process Lodging 5 Oct'22 Participants Susi Ongoing process Venue Aston Kupang Susi Done Meeting Package 52 Hotel Done Attendance List 3 - 5 Oct'22 Susi Done Transport Allowance 3 - 5 Oct'22 Hadi, Ois, Santi Ongoing process Per Diem 3 - 5 Oct'22 Hadi, Ois, Santi Ongoing process
Sim Card X X X LCD Projector 2 Hotel/Susi Confirmed? Flashnet (Modem) X X X Recorder X X X Printer 1 Floater Done Stationary (ATK) Standar Lenny Done Extension Cable 1 for each table Hotel/Susi Done Banner X X X Envelope for per diem and transport 1 box Lenny Done Alat peraga X X X Paper A4 80 gram 1 rim Lenny Done Spare catridge 1 Lenny Done Confirmation Invitee, stakeholders, etc As in TOR Susi, Hermin, Lenny, Fius Ongoing process Printing Materials 1 Lenny Ongoing process Practice material X X X Printed TOR & Agenda 2 Susi Done Backdrop Design on Layar LCD 1 Ito Done Set Up Ruang Round Table Hotel, Susi Confirmed by Mas Hadi Desain Nametag X X X