Prepared
CDI
by
Reviewed
AP
by
Approved
QCC
by
A) Modification to the existing roof.
2. In order to be able to install the steel tower before casting we will add some
reinforcements to the beams .
2.1. Modification 1: Weld a bracket to the bottom flange of the beam
as shown in the drawing to prevent the bending in X-Direction.
Modification.pdf
3. Install and fully weld the wend bracing to the beam.
B) Lifting plan.
1- Divide the steel tower into two Parts and lifting with the tower crane, the
tower crane height will be increased to 73.4m,it is not exceed the
maximum height.
- Part 1:
71,7 m
H1 = H + 10,7 m
70 m
4,3 m
20,5 m 12 t 3,2 t
3m 65 m
3,85 t
60 m
4,25 t H (m)
55 m
57,5
4,7 t
50 m
5,4 t
45 m
6t
40 m
6,7 t
35 m
18 m 7,95 t
30 m
12 m 9,6 t
2x2m
MCB 1 6m
3m
5 36,5 F1 99 t 10 32,8 30 m ➡ 45 m
7 37,4 147 t
6 34,4 4 33,5 98 t 9 29,8
3m
H
5 31,4 F3 90 t 3 30,5 88 t 8 26,8
4 28,4 97 t 2 27,5 7
3 25,4 75 t 1 24,5 6
3m
2 22,4 5 50 m ➡ 70 m
7,5 m 7,5 m
1 19,4 4
3
7,5 m 7,5 m
2
1
12,8 m
0,32 m
0,15 m
1,5 m
6m
F2 F3 F1
TOPKIT
MC 310 K12
Climbing crane
MCB 1
BA 66 A
30 m ➡ 45 m
2m
A H1 P
H1 (m) (m) (t)
R 16 38,8 96,1
A
15
R 35,8 94,6
14
P 13 32,8 93
12
29,8 91,5
11
1500 1300
10 26,8 90
2170
20 22 24 26 28 30 R (t)
TOPKIT
MC 310 K12
GB
Reactions in service
Reactions out of service
Without load, ballast (or transport axles), with maximum jib and maximum height.
Consult us
See climbing crane
Load diagrams
70 m 3,1 21,4 22 25 27 30 32 35 37 37,4 41,9 45 47 50 52 55 57 60 62 65 67 70 m
MCB 1 12 10 9,1 8 7,3 6,5 6,1 6 6 5,5 5,2 4,9 4,6 4,3 4,2 3,9 3,7 3,5 3,4 3,2 t
12 11,6
35 m 3,1 24,8 25 27 30 32 35 m
12 11,9 10,8 9,6 8,9 7,95 t
30 m 3,1 24,9 25 27 30 m
12 11,9 10,9 9,6 t
TOPKIT
MC 310 K12
(kg) (kg)
Base ballast H (m) 57,5 54,5 51,5 48,5 45,5 42,5 39,5 36,5 33,5 30,5 27,5 24,5 21,5
2m VB 21 A
MCB 1 (t) 84 72 72 72 72 72 72 60 60 60 60 60 60
GB
Anchorages Reactions in service 139,4 m
MCB 1
Reactions out of service 118,4 m
Without load, ballast (or transport axles), with maximum jib and maximum
97,4 m height.
Consult us P21A
76,4 m
106,65 m
52,4 m
See climbing crane
85,65 m
64,65 m
40,65 m
TOPKIT
MC 310 K12
GB
A Distance between collars
H1 Crane height
P Crane weight (in service)
R Horizontal reaction
Mechanisms hp kW
MCB 3
m/min 0 ➞ 40 0 ➞ 80 0 ➞ 20 0 ➞ 40
70 RCS 30 70 51 523 m
t 6 3 12 6
1,5 3 6 t
TOPKIT
MC 310 K12
GB
Hoisting
Trolleying
Slewing
Travelling
Asia – Pacific
Tel : +65 6264 1188
Fax : +65 6862 4040
MC 310 K12
www.manitowoccranegroup.com
Réf. 2004 45 MCB 3
Subject to modification