You are on page 1of 1

SCHEDULE OF FOOTING

COLUMN SCHEDULE
1 COLUMN / FOOTING SCHEDULE
S 3 Scale NTS
5 DETAIL
S 3 Scale 1:25
6
S 3
2 TYPICAL FOOTING DETAIL
S 3 Scale NTS
4 TYPICAL BEAM DETAIL
S 3 Scale NTS
3 TYPICAL DETAIL OF RC COLUMN
S 3 Scale 1:50
Drawings and Specifications duly signed, stamped
or sealed, as instruments of service are the
intellectual properties and documents of the
COLUMN AND FOOTING SCHEDULE
ENGINEER / ARCHITECT , whether TYPICAL FOOTING DETAIL S-3
the object for which they are made is executed or
PROPOSED SINGLE STOREY RESIDENTIAL BLDG TYPICAL DETAIL OF REINFORCED CONCRETE COLUMN
MRS. ALICE EBAL
not. It shall be unlawful for any person, without the
CIVIL ENGINEER consent of the ENGINEER / ARCHITECT TYPICAL BEAM DETAIL
or author of said documents, to duplicate or to
make copies of said documents for use in the DETAIL OF CONCRETE SLAB END
repetition of and for other projects or buildings,
whether executed partly or in whole.
BRGY. MALABON, CANDELARIA, ZAMBALES 7 / 14

You might also like