You are on page 1of 24

Text2 Actual Financial Format(IIf([Baseline Cost]=0,0,[Actual Cost]/[Baseline Cost]),"0.

00%")
Text3 Actual Physical Format(IIf([Cost1]=0,0,[Cost2]/[Cost1]),"0.00%")
Text4 Schedule Financial NO FORMULA
Text5 Schedule Physical NO FORMULA

Cost1 Baseline Physical Cost IIf([Text1]=2,0,[Cost])


Cost2 Actual Physical Cost IIf([Text1]=2,0,[Actual Cost])

B7a/1
1
#REF!

BILL NO. 6 -

Item Code No.


Description Unit Qty. Rate Amount (RM)
No.

H PILING WORKS
1 H110 Provision of all necessary piling plant and equipment, sum -
transportation to the Site, handling, assembling, and
removal off the Site after completion of operation.

2 H120 Moving and handling of all piling plant and equipment sum -
within the Site and from location to location as often as is,
and whenever necessary for the execution of the whole
piling operation.

Items for micropiles shall be deemed to include temporary


casings, stabilising agent, jointing of API pipes, piling
records and disposal of excavated and surplus materials.

[300 mm] diameter micropiles as working piles.

3 H241.1 Boring in earth, up to [10m] for [14] nos. of pile points for m 0 340.00 -
Vertical hole.

4 H241.2 Boring in earth, up to [11m] for [14] nos. of pile points for m 0 360.00 -
Inclined hole (Raking 1H:4V).

5 H242 Boring through rock, up to [10m] for [14] nos. of pile m 0 460.00 -
points. Rate to include natural and artificial hard material
for Vertical hole.

6 H242 Boring through rock, up to [10m] for [14] nos. of pile m 0 490.00 -
points. Rate to include natural and artificial hard material
for Inclined hole (Raking 1H:4V).

7 H243 Supply and install [177.8mm OD x 10.4mm thick Grade m 0 500.00 -


N-80 API pipe].

8 H247 Grouting with non-shrink cement grout Grade [C30] as m3 0 3,000.00 -


specified into drilled hole. Rate shall include excess
cement required when the grout volume exceeded the
theoretical volume.

9 H248 Cut-off piles. Rate to include preparing heads. nr 0 600.00 -

10 H510.1 Initial static load test on 300 mm diameter micropile up to nr 0 40,000.00 -


two times working load of 800 kN (Test load of 1,600kN).

11 H510.2 Subsequent static load test, on 300 mm diameter mircopile nr 0 40,000.00 -


up to two times working load of 800 kN (Test load of
1,600 kN).

12 H520 PDA test on [300 mm] diameter micropile nr 0 4,000.00 -

13 H530 Pile integrity test (sonic echo test) on [300 mm] diameter nr 0 600.00 -
micropile

Carried Forward: -

B6/3
#REF!

BILL NO. 6 -

Item Code No.


Description Unit Qty. Rate Amount (RM)
No.

Bring Forward: -

ABUTMENTS AND WINGWALL


Item for abutments shall be deemed to include everything
necessary all in accordance with the specifications and
drawings as directed by the S.O.;
1 F141 Excavate in earth material m3 0 18.00 -
2 I111 Grade C15, Mass concrete blinding, [50 mm] thick. m2 0 19.00 -
3 I145 Grade C30, Reinforced concrete to abutment and wingwall m3 0 600.00 -

4 I430 F3: Smooth finish to walls m2 0 70.00 -


5 I523 High tensile bars, nominal diameter: 12mm t 0 5,500.00 -
6 I524 High tensile bars, nominal diameter: 16mm. t 0 5,500.00 -
7 I525 High tensile bars, nominal diameter: 20mm. t 0 5,500.00 -
8 I526 High tensile bars, nominal diameter: 25mm. t 0 5,500.00 -
9 F410 Supply and lay 'Polyfelt TS20' or approved equivalent m2 0 18.50 -
filter cloth for abutment and wingwall
10 F314.1 Filling with approved filter material m3 0 90.00 -
11 F314.2 Filling with approved granular backfill m3 0 130.00 -
12 I652 [150 mm DN, PN 15] perforated uPVC pipe including nr 0 150.00 -
450mm x 450mm gravel pocket and filter cloth 'Polyfelt
TS20'
13 N631.3 Supply and paint two coats of tar based waterproofing m2 0 45.00 -
paint to the back of the abutments and wingwall

STEEL SUPERSTRUCTURE
Item for supply and erection of structural members shall
be deemed to include delivery, protective and/or
decorative surface treatment, fabrication, handling,
hoisting, welded connections, bolted connections and
nondestructive testing.

14 L110 Supply and erection of structural members for frames; t 0 13,000.00 -


steel to [BS:4360] (Grade 50B)
15 L161 HSFG bolts to [BS 4604], nominal diameter [16 mm] nr 0 45.00 -
(Grade 10.9)
16 L162 HSFG bolts to [BS 4604], nominal diameter [20 mm] nr 0 50.00 -
(Grade 10.9)
17 L163 HSFG bolts to [BS 4604], nominal diameter [24 mm] nr 0 65.00 -
(Grade 10.9)
18 L312 [102 mm x 51 mm x 10.42 kg/m] C-channel shear studs m 0 100.00 -
to [BS:4360] (Grade 43A)

Carried Forward: -

B6/4
#REF!

BILL NO. 6 -

Item Code No.


Description Unit Qty. Rate Amount (RM)
No.

Bring Forward: -

BRIDGE DECK AND RUN-ON-SLAB


Item for bridge deck and run-on-slab shall be deemed to
include everything necessary all in accordance with the
specifications and drawings as directed by the S.O.;

1 I111 Grade C15, Mass concrete blinding, [50 mm] thick. m2 0 19.00 -
2 I145 Grade C30, Reinforced concrete to bridge deck and run- m3 0 550.00 -
on-slab
3 I430 F3: Smooth finish to walls m2 0 70.00 -
4 I523 High tensile bars, nominal diameter: 12mm t 0 5,500.00 -
5 I524 High tensile bars, nominal diameter: 16mm. t 0 5,500.00 -
6 I615 Sealed [25mm] thick 'Expandite' or approved equivalent m 0 60.00 -
natural bonded cork filler
7 I616 Dowels – plain, [16mm diameter x 1100mm long] hot-dip nr 0 50.00 -
galvanised m.s. dowel bar
8 P320 Outlet drains; 100 mm diameter UPVC pipe including m 0 90.00 -
fittings
9 T414 [200mm x 6mm thick] rubber bearing strip m 0 200.00 -

PARAPET WALL HANDRAIL


10 L240 Galvanised mild steel handrail with fixing accessories as m 0 300.00 -
shown on the drawing.

EXPANSION JOINT
11 I613 Expansion joints, Fosroc Fosflex bridge joint F250 or m 0 2,000.00 -
approved equivalent expansion joint

BRIDGE BEARING
Supply and fix in position 'PSC Freyssinet' or approved
equivalent bridge bearings including dowel bars, grout,
mortared plinths including everything necessary all in
accordance with the specifications and drawings as
directed by the S.O.;

12 L190.1 Bridge bearing [Free End] nr 0 5,000.00 -


13 L190.2 Bridge bearing [Fixed End] nr 0 5,500.00 -

CONCRETE WALL
14 F131 Excavate in earth material m3 0 18.00 -
15 I125 Grade C20, Mass concrete to walls m3 0 480.00 -
16 I414 F1: Rough finish to walls m2 0 60.00 -

Carried Forward: -

B6/5
#REF!

BILL NO. 6 -

Item Code No.


Description Unit Qty. Rate Amount (RM)
No.

Bring Forward: -
SURFACE PROTECTION
Gunite Face
1 G410 [75 mm] thick [G20] guniting. Rate shall be deemed to m2 0 100.00 -
include steel fabric mesh.

Stone Pitching (100mm - 150mm diameter)


2 G440.1 [300mm] thick mortared rip-rap stone pitching including m2 0 150.00 -
75mm thick porous backfill, geotextile fabric and
weepholes.

GABION
3 G211.1 [1.0m wide x 1.0m high x 3.0m long] rock-filled gabion m3 0 #REF! #REF!
with PVC-coated wire gauge size of [2.7 mm] as per
Specification clause (3.6) and as shown in the drawings.

4 G213 Non-woven geotextile as separator as per Specification m2 0 #REF! #REF!


clause (3.8.2.3).

Total Carried to Grand Summary #REF!

B6/6
#REF!

BILL NO. 6 -

Item Code No.


Description Unit Qty. Rate Amount (RM)
No.

H PILING WORKS
1 H110 Provision of all necessary piling plant and equipment, sum -
transportation to the Site, handling, assembling, and
removal off the Site after completion of operation.

2 H120 Moving and handling of all piling plant and equipment sum -
within the Site and from location to location as often as is,
and whenever necessary for the execution of the whole
piling operation.

Items for micropiles shall be deemed to include temporary


casings, stabilising agent, jointing of API pipes, piling
records and disposal of excavated and surplus materials.

[300 mm] diameter micropiles as working piles.

3 H241.1 Boring in earth, up to [10m] for [14] nos. of pile points for m 0 340.00 -
Vertical hole.

4 H241.2 Boring in earth, up to [11m] for [14] nos. of pile points for m 0 360.00 -
Inclined hole (Raking 1H:4V).

5 H242 Boring through rock, up to [10m] for [14] nos. of pile m 0 460.00 -
points. Rate to include natural and artificial hard material
for Vertical hole.

6 H242 Boring through rock, up to [10m] for [14] nos. of pile m 0 490.00 -
points. Rate to include natural and artificial hard material
for Inclined hole (Raking 1H:4V).

7 H243 Supply and install [177.8mm OD x 10.4mm thick Grade m 0 500.00 -


N-80 API pipe].

8 H247 Grouting with non-shrink cement grout Grade [C30] as m3 0 3,000.00 -


specified into drilled hole. Rate shall include excess
cement required when the grout volume exceeded the
theoretical volume.

9 H248 Cut-off piles. Rate to include preparing heads. nr 0 600.00 -

10 H510.1 Initial static load test on 300 mm diameter micropile up to nr 0 40,000.00 -


two times working load of 800 kN (Test load of 1,600kN).

11 H510.2 Subsequent static load test, on 300 mm diameter mircopile nr 0 40,000.00 -


up to two times working load of 800 kN (Test load of
1,600 kN).

12 H520 PDA test on [300 mm] diameter micropile nr 0 4,000.00 -

13 H530 Pile integrity test (sonic echo test) on [300 mm] diameter nr 0 600.00 -
micropile

Carried Forward: -

B6/7
#REF!

BILL NO. 6 -

Item Code No.


Description Unit Qty. Rate Amount (RM)
No.

Bring Forward: -

ABUTMENTS AND WINGWALL


Item for abutments shall be deemed to include everything
necessary all in accordance with the specifications and
drawings as directed by the S.O.;
1 F141 Excavate in earth material m3 0 18.00 -
2 I111 Grade C15, Mass concrete blinding, [50 mm] thick. m2 0 19.00 -
3 I145 Grade C30, Reinforced concrete to abutment and wingwall m3 0 600.00 -

4 I430 F3: Smooth finish to walls m2 0 70.00 -


5 I523 High tensile bars, nominal diameter: 12mm t 0 5,500.00 -
6 I524 High tensile bars, nominal diameter: 16mm. t 0 5,500.00 -
7 I525 High tensile bars, nominal diameter: 20mm. t 0 5,500.00 -
8 I526 High tensile bars, nominal diameter: 25mm. t 0 5,500.00 -
9 F410 Supply and lay 'Polyfelt TS20' or approved equivalent m2 0 18.50 -
filter cloth for abutment and wingwall
10 F314.1 Filling with approved filter material m3 0 90.00 -
11 F314.2 Filling with approved granular backfill m3 0 130.00 -
12 I652 [150 mm DN, PN 15] perforated uPVC pipe including nr 0 150.00 -
450mm x 450mm gravel pocket and filter cloth 'Polyfelt
TS20'
13 N631.3 Supply and paint two coats of tar based waterproofing m2 0 45.00 -
paint to the back of the abutments and wingwall

STEEL SUPERSTRUCTURE
Item for supply and erection of structural members shall
be deemed to include delivery, protective and/or
decorative surface treatment, fabrication, handling,
hoisting, welded connections, bolted connections and
nondestructive testing.

14 L110 Supply and erection of structural members for frames; t 0 13,000.00 -


steel to [BS:4360] (Grade 50B)
15 L161 HSFG bolts to [BS 4604], nominal diameter [16 mm] nr 0 45.00 -
(Grade 10.9)
16 L162 HSFG bolts to [BS 4604], nominal diameter [20 mm] nr 0 50.00 -
(Grade 10.9)
17 L163 HSFG bolts to [BS 4604], nominal diameter [24 mm] nr 0 65.00 -
(Grade 10.9)
18 L312 [102 mm x 51 mm x 10.42 kg/m] C-channel shear studs m 0 100.00 -
to [BS:4360] (Grade 43A)

Carried Forward: -

B6/8
#REF!

BILL NO. 6 -

Item Code No.


Description Unit Qty. Rate Amount (RM)
No.

Bring Forward: -

BRIDGE DECK AND RUN-ON-SLAB


Item for bridge deck and run-on-slab shall be deemed to
include everything necessary all in accordance with the
specifications and drawings as directed by the S.O.;

1 I111 Grade C15, Mass concrete blinding, [50 mm] thick. m2 0 19.00 -
2 I145 Grade C30, Reinforced concrete to bridge deck and run- m3 0 550.00 -
on-slab
3 I430 F3: Smooth finish to walls m2 0 70.00 -
4 I523 High tensile bars, nominal diameter: 12mm t 0 5,500.00 -
5 I524 High tensile bars, nominal diameter: 16mm. t 0 5,500.00 -
6 I615 Sealed [25mm] thick 'Expandite' or approved equivalent m 0 60.00 -
natural bonded cork filler
7 I616 Dowels – plain, [16mm diameter x 1100mm long] hot-dip nr 0 50.00 -
galvanised m.s. dowel bar
8 P320 Outlet drains; 100 mm diameter UPVC pipe including m 0 90.00 -
fittings
9 T414 [200mm x 6mm thick] rubber bearing strip m 0 200.00 -

PARAPET WALL HANDRAIL


10 L240 Galvanised mild steel handrail with fixing accessories as m 0 300.00 -
shown on the drawing.

EXPANSION JOINT
11 I613 Expansion joints, Fosroc Fosflex bridge joint F250 or m 0 2,000.00 -
approved equivalent expansion joint

BRIDGE BEARING
Supply and fix in position 'PSC Freyssinet' or approved
equivalent bridge bearings including dowel bars, grout,
mortared plinths including everything necessary all in
accordance with the specifications and drawings as
directed by the S.O.;

12 L190.1 Bridge bearing [Free End] nr 0 5,000.00 -


13 L190.2 Bridge bearing [Fixed End] nr 0 5,500.00 -

CONCRETE WALL
14 F131 Excavate in earth material m3 0 18.00 -
15 I125 Grade C20, Mass concrete to walls m3 0 480.00 -
16 I414 F1: Rough finish to walls m2 0 60.00 -

Carried Forward: -

B6/9
#REF!

BILL NO. 6 -

Item Code No.


Description Unit Qty. Rate Amount (RM)
No.

Bring Forward: -
SURFACE PROTECTION
Gunite Face
1 G410 [75 mm] thick [G20] guniting. Rate shall be deemed to m2 0 100.00 -
include steel fabric mesh.

Stone Pitching (100mm - 150mm diameter)


2 G440.1 [300mm] thick mortared rip-rap stone pitching including m2 0 150.00 -
75mm thick porous backfill, geotextile fabric and
weepholes.

GABION
3 G211.1 [1.0m wide x 1.0m high x 3.0m long] rock-filled gabion m3 0 #REF! #REF!
with PVC-coated wire gauge size of [2.7 mm] as per
Specification clause (3.6) and as shown in the drawings.

4 G213 Non-woven geotextile as separator as per Specification m2 0 #REF! #REF!


clause (3.8.2.3).

Total Carried to Grand Summary #REF!

B6/10
BILL 2e.3
BRIDGE 3 (15 METER)
Item No. Code No. Description Unit Qty. Rate Amount (RM)

A500 CONTRACTOR'S REQUIREMENTS

Temporary Work

1 A521.1 Construct temporary road diversion and remove sum


and make good all works after completion; fixed
charge.

2 A521.2 Maintain temporary road diversion for duration of sum


construction; time-related charge.

3 A529.1 Construct temporary works and remove and make good sum
all works after completion; fixed charge.

4 A529.2 Maintain temporary works for duration of constrution; sum


time-related charge.

5 A529.3 Construct temporary sheet piling and remove after sum


completion; fixed charge.

6 A529.4 Maintain temporary sheet piling for duration of sum


construction; time-related charge.

Mobilisation and Demobilisation

7 A541 Mobilisation and demobilisation of all necessary plant, sum


equipment & other accessories for the excavation &
relocation operation.

8 A542 Mobilisation and demobilisation of sheet piling plant sum


and equipment.

F100 EXCAVATION

Cut and Dispose

Excavation in cut shall be deemed to include trimming


and preparation of excavated surface and transportation
from source to Contractor's dumpsite.

9 131 Excavate in earth material m3 0.00

Page Total carried to Summary of Bill 2e.3 0.00

Page B2e3.11 of B2f.24


BILL 2e.3
BRIDGE 3 (15 METER)
Item No. Code No. Description Unit Qty. Rate Amount (RM)

H PILING WORKS

1 H110 Provision of all necessary piling plant and equipment, sum 50,000.00
transportation to the Site, handling, assembling, and
removal off the Site after completion of operation.

2 H120 Moving and handling of all piling plant and equipment sum 10,000.00
within the Site and from location to location as often as
is, and whenever necessary for the execution of the
whole piling operation.

Items for micropiles shall be deemed to include


temporary casings, stabilising agent, jointing of API
pipes, piling records and disposal of excavated and
surplus materials.

[300 mm] diameter micropiles as working piles.

3 H241.1 Boring in earth, up to [10m] for [14] nos. of pile points m 140 340.00 47,600.00
for Vertical hole.

4 H241.2 Boring in earth, up to [11m] for [14] nos. of pile points m 154 360.00 55,440.00
for Inclined hole (Raking 1H:4V).

5 H242 Boring through rock, up to [10m] for [14] nos. of pile m 140 460.00 64,400.00
points. Rate to include natural and artificial hard
material for Vertical hole.

6 H242 Boring through rock, up to [10m] for [14] nos. of pile m 140 490.00 68,600.00
points. Rate to include natural and artificial hard
material for Inclined hole (Raking 1H:4V).

7 H243 Supply and install [177.8mm OD x 10.4mm thick Grade m 574 500.00 287,000.00
N-80 API pipe].

8 H247 Grouting with non-shrink cement grout Grade [C30] as m3 21 3,000.00 63,000.00
specified into drilled hole. Rate shall include excess
cement required when the grout volume exceeded the
theoretical volume.

9 H248 Cut-off piles. Rate to include preparing heads. nr 28 600.00 16,800.00

10 H510.1 Initial static load test on 300 mm diameter micropile up nr 1 40,000.00 40,000.00
to two times working load of 800 kN (Test load of
1,600kN).

11 H510.2 Subsequent static load test, on 300 mm diameter nr 1 40,000.00 40,000.00


mircopile up to two times working load of 800 kN (Test
load of 1,600 kN).

12 H520 PDA test on [300 mm] diameter micropile nr 4 4,000.00 16,000.00

13 H530 Pile integrity test (sonic echo test) on [300 mm] diameter nr 24 600.00 14,400.00
micropile

Page Total carried to Summary of Bill 2e.3 773,240.00

Page B2e3.12 of B2f.24


BILL 2e.3
BRIDGE 3 (15 METER)
Item No. Code No. Description Unit Qty. Rate Amount (RM)

ABUTMENTS AND WINGWALL

Item for abutments shall be deemed to include


everything necessary all in accordance with the
specifications and drawings as directed by the S.O.; as
shown in drawing No.

1 141 Excavate in earth material m3 125 18.00 2,250.00


2 I111 Grade C15, Mass concrete blinding, [50 mm] thick. m2 60 26.00 1,560.00

3 I145 Grade C30, Reinforced concrete to abutment and m3 120 600.00 72,000.00
wingwall
4 I414 F3: Smooth finish to walls m2 230 70.00 16,100.00
5 I523 High tensile bars, nominal diameter: 12mm t 1 6,000.00 6,000.00
6 I524 High tensile bars, nominal diameter: 16mm. t 5 6,000.00 30,000.00
7 I525 High tensile bars, nominal diameter: 20mm. t 2 6,000.00 12,000.00
8 I526 High tensile bars, nominal diameter: 25mm. t 14 6,000.00 84,000.00
9 F410 Supply and lay 'Polyfelt TS20' or approved equivalent m2 195 18.50 3,607.50
filter cloth for abutment and wingwall
10 F314.1 Filling with approved filter material m3 23 90.00 2,070.00
11 F314.2 Filling with approved granular backfill m3 80 130.00 10,400.00
12 I652 [150 mm DN, PN 15] perforated uPVC pipe including nr 36 150.00 5,400.00
450mm x 450mm gravel pocket and filter cloth 'Polyfelt
TS20'
13 N631.3 Supply and paint two coats of tar based waterproofing m2 180 45.00 8,100.00
paint to the back of the abutments and wingwall

STEEL SUPERSTRUCTURE

Item for supply and erection of structural members shall


be deemed to include delivery, protective and/or
decorative surface treatment, fabrication, handling,
hoisting, welded connections, bolted connections and
nondestructive testing.

14 L110 Supply and erection of structural members for frames; t 28 16,000.00 448,000.00
steel to [BS:4360] (Grade 50B)
15 L161 HSFG bolts to [BS 4604], nominal diameter [16 mm] nr 192 45.00 8,640.00
(Grade 10.9)
16 L162 HSFG bolts to [BS 4604], nominal diameter [20 mm] nr 96 50.00 4,800.00
(Grade 10.9)
17 L163 HSFG bolts to [BS 4604], nominal diameter [24 mm] nr 1,016 65.00 66,040.00
(Grade 10.9)
18 L312 [102 mm x 51 mm x 10.42 kg/m] C-channel shear studs m 62 100.00 6,200.00
to [BS:4360] (Grade 43A)

Page Total carried to Summary of Bill 2e.3 787,167.50

Page B2e3.13 of B2f.24


BILL 2e.3
BRIDGE 3 (15 METER)
Item No. Code No. Description Unit Qty. Rate Amount (RM)

BRIDGE DECK AND RUN-ON-SLAB

Item for bridge deck and run-on-slab shall be deemed to


include everything necessary all in accordance with the
specifications and drawings as directed by the S.O.; as
shown in drawing No.

1 I111 Grade C15, Mass concrete blinding, [50 mm] thick. m2 100 26.00 2,600.00

2 I145 Grade C30, Reinforced concrete to bridge deck and run- m3 95 600.00 57,000.00
on-slab
3 I414 F3: Smooth finish to walls m2 325 70.00 22,750.00
4 I523 High tensile bars, nominal diameter: 12mm t 7 6,000.00 42,000.00
5 I524 High tensile bars, nominal diameter: 16mm. t 9 6,000.00 54,000.00
6 I615 Sealed [25mm] thick 'Expandite' or approved equivalent m 33 60.00 1,980.00
natural bonded cork filler
7 I616 Dowels – plain, [16mm diameter x 1100mm long] hot- nr 22 50.00 1,100.00
dip galvanised m.s. dowel bar
8 P320 Outlet drains; 100 mm diameter UPVC pipe including m 20 90.00 1,800.00
fittings
9 T414 [200mm x 6mm thick] rubber bearing strip m 20 200.00 4,000.00

PARAPET WALL HANDRAIL

10 L240 Galvanised mild steel handrail with fixing accessories as m 50 300.00 15,000.00
shown on the drawing.

EXPANSION JOINT

11 613 Expansion joints, Fosroc Fosflex bridge joint F250 or m 21 2,000.00 42,000.00
approved equivalent expansion joint

BRIDGE BEARING

Supply and fix in position 'PSC Freyssinet' or approved


equivalent bridge bearings including dowel bars, grout,
mortared plinths including everything necessary all in
accordance with the specifications and drawings as
directed by the S.O.; as shown in drawing No.

12 L190.1 Bridge bearing [Free End] nr 7 5,000.00 35,000.00


13 L190.2 Bridge bearing [Fixed End] nr 7 5,500.00 38,500.00

CONCRETE WALL

14 131 Excavate in earth material m3 15 18.00 270.00


15 125 Grade C20, Mass concrete to walls m3 15 550.00 8,250.00
16 414 F3: Smooth finish to walls m2 120 60.00 7,200.00

Page Total carried to Summary of Bill 2e.3 333,450.00

Page B2e3.14 of B2f.24


BILL 2e.3
BRIDGE 3 (15 METER)
Item No. Code No. Description Unit Qty. Rate Amount (RM)

SURFACE PROTECTION

Gunite Face
1 G410 [75 mm] thick [G20] guniting. Rate shall be deemed to m2 750 100.00 75,000.00
include steel fabric mesh as shown in Drawing No. (….).

Stone Pitching (100mm - 150mm diameter)


2 G440.1 [300mm] thick mortared rip-rap stone pitching including m2 460 150.00 69,000.00
75mm thick porous backfill, geotextile fabric and
weepholes as shown in Drawing No. (….)

GABION

3 G211.1 [1.0m wide x 1.0m high x 3.0m long] rock-filled gabion m3 200 530.00 106,000.00
with PVC-coated wire gauge size of [2.7 mm] as per
Specification clause (3.6) and as shown in the drawings.

4 G213 Non-woven geotextile as separator as per Specification m2 390 25.00 9,750.00


clause (3.8.2.3).

Page Total carried to Summary of Bill 2e.3 259,750.00

Page B2e3.15 of B2f.24


BILL 2e.3
BRIDGE 3 (15 METER)
Item No. Code No. Description Unit Qty. Rate Amount (RM)

Summary of Bill 2e.3: Bridge 3 (15 Meter)

Page B2e3.1 0.00

Page B2e3.2 773,240.00

Page B2e3.3 787,167.50

Page B2e3.4 333,450.00

Page B2e3.5 259,750.00

Total of Bill 2e.3 carried to Grand Summary 2,153,607.50

Page B2e3.16 of B2f.24


Bill 2.g
Environmental Protection Works

ITEM DESCRIPTION OF WORKS UNIT QTY RATE


NO. (RM)

NON - PHYSICAL WORKS

9.1 ENVIRONMENTAL IMPACT ASSESSMENT


(EIA)
9.1.1 Preparation, submission and approval of EIA Report by Sum
environmental consultant registered with Department Of
Environment (DOE)

9.2 ENVIRONMENTAL MANAGEMENT PLAN


(EMP)

9.2.1 Preparation, submission and approval of EMP by Sum


environmental consultant registered with DOE including
:-

(i)Erosion and Sediment Control Plan

(ii)Flora Management Plan *

(iii)Wildlife Management Plan *

9.3 ENVIRONMENTAL OFFICER (E.O.)


9.3.1 Provision of a full time E.O. for environmental man-mth 3,000.00
management works only, through out the contract period
for the implementation of EMP and JKR EMS : MS ISO
14001

9.4 ENVIRONMENTAL MONITORING, AUDIT AND


TRAINING

9.4.1 Environmental Monitoring


i) Water Quality Monitoring
a) Conduct monthly river/stream/other water bodies* Sum
water quality monitoring as specified and as shown on
drawing for the following parameters or as directed by
the S.O. through out the contract period :-

1.Turbidity;
2.pH;
3.Total Suspended Solids (TSS);
4.Biochemical Oxygen Demand (BOD);
5.Chemical Oxygen Demand (COD);
6.Dissolved Oxygen (DO);
7.Oil & Grease;
8.E. Coli;
9.Ammoniacal Nitrogen (NH3-N)

TOTAL CARRIED FORWARD CF :

TOTAL BROUGHT FORWARD BF :

9.4 ENVIRONMENTAL MONITORING, AUDIT AND


TRAINING (cont'd)

9.4.1 Environmental Monitoring (cont’d)

b) Conduct monthly water quality monitoring of the Sum 24 90.00


effluent discharge at accommodation, workshop and
canteen area as specified for the following parameters or
as directed by the S.O. through out the contract period :-

1.Turbidity;
2.pH;
3.Total Suspended Solids (TSS);
4.Biochemical Oxygen Demand (BOD);
5.Chemical Oxygen Demand (COD);
6.Dissolved Oxygen (DO);
7.Oil & Grease;
8.E. Coli;
9.Ammoniacal Nitrogen (NH3-N)

c) Conduct monthly water quality monitoring at Sum 24 90.00


discharge outlet of silt trap, sediment pond, sediment
basin as specified for Total Suspended Solid (TSS) or as
directed by the S.O. through out the contract period.

d) Air Quality Monitoring


Conduct quarterly air quality monitoring for Total Sum 24 120.00
Suspended Particulates (TSP) for 24- hour period
including wind velocity and direction as specified or as
directed by the S.O. through out the contract period.

e) Noise Monitoring
Conduct quarterly noise monitoring (12 hours average) Sum 8 120.00
including Leq, L10 and L90 as specified or as directed
by the S.O. through out the contract period.

f) Vibration Monitoring
Conduct vibration monitoring as specified or as directed Sum 1 300.00
by the S.O. through out the contract period .

TOTAL CARRIED FORWARD CF :

TOTAL BROUGHT FORWARD BF :

9.4 ENVIRONMENTAL MONITORING, AUDIT AND


TRAINING (cont'd)

9.4.1 Environmental Monitoring (cont’d)


ii) Environmental Quality Report
a) Preparation of five (5) copies (per month) of the
following report through out the contract period :-
1.Monthly environmental quality report Sum 150 50.00

9.4.2 Environmental Audit


i) Conduct quarterly audit as specified including Nr 50 132.00
preparation of five (5) copies of Environmental
Monitoring and Audit Report (per audit) through out the
contract period

ii) Conduct closure audit prior to issuance of certificate Nr


of practical completion including preparation of five (5)
copies of the report

9.4.3 Training
i)Local Training
Conduct environmental training on site for JKR Nr
personnel once a year.

ii)Transfer of Technology for Environment

Allow JKR personnel to acquire the transfer of Provision


technology. al Sum

PHYSICAL WORK

9.5 DUST AND MUD CONTROL


9.5.1 Water Browser Truck

Provision, operation and maintenance of browser truck Nr 2 10,000.00


including operator, pumping of water, water tank and
other necessary equipments as specified for carrying out
water spraying along haul/access roads, existing roads
and near settlements or as directed by the S.O.

TOTAL CARRIED FORWARD CF :


AMOUNT
(RM)

15,000.00

9,000.00

12,000.00
36,000.00

36,000.00

2,160.00

2,160.00

2,880.00
960.00

300.00

44,460.00

44,460.00

7,500.00

6,600.00

NIL

NIL

NIL
20,000.00

78,560.00