You are on page 1of 4
ee PEUSANGAN 1&2 HYDROELECTRIC POWER PLANT. CONSTRUCTION PROJECT PI. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTAN PPE. TATA GUNA PATRIA, PI. CONMUSA ENERGINDO, PT y4 CM, Pet Onie emp 1 16 ek sma we A 4st ons 1 Sutil ho, chu a au 180 Yn 788 Ps 273602 Loan No. : IP S38 ‘Our Ret: PSMCW-20-6801 Lott Main Civil Works Date: August27, 2020 Contract No. :131.PHO41/DIR/2011 of March 18, 2011 Mr. Park, Kyung Ho Project Manager As Contractor's Representative Hyundai E&C & PT. PP (Perseo) Thk JV Dear Si, Subject: Approval of Submission Electrical Drawing of Control House Lighting & Auxiliary Service No.t Diversion wel We refer tothe contractor letter Ref. IHPI/LOT }CRT/2008/070 recived an August 25%, 2020 regarding the above subject. We hereby Approved the captioned drawings as atached, Thank you for your kind attention, Sey GS T Ky Team Le ineer ff ag i $ 1 1 i 1 1 1 ' ' 1 1 1 1 1 1 ' ' Hl i 1 1 1 1 1 1 1 ‘ 1 Notes ; 4} Lay out equipment refer to drawing 2055/03/E64/12/027101 2) Cireuit agram refer to drawing 2055/05/E164121025101 ‘A. Approved 27 AUG 2020, A Approved 27 AUG 20 Go|] 2lo|s|s| CONTROL HOUSE AUXILIARY SERVICE & UTILITY SYSTEM ites; 4, Chet agra an istibuton Panel davng fern 205S/0S/E/E4/121025/01 2. Final positon of fans, Switches Receptacle and Panel to be ‘coordinated with equipment positon of LOT, LOT! & LOT It “A Approved 27 AUG a Lats {any EAVES PASOIA CONTROL HOUSE LIGHTING SYSTEM Notes; 41 Chet Dagan and Disbuton Panel roving reef, 20S8/0S/E/64/121025/01

You might also like