ee PEUSANGAN 1&2 HYDROELECTRIC POWER PLANT.
CONSTRUCTION PROJECT
PI. KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTAN
PPE. TATA GUNA PATRIA, PI. CONMUSA ENERGINDO, PT y4 CM,
Pet Onie emp 1 16 ek sma we A
4st ons 1 Sutil ho, chu a au 180 Yn 788 Ps 273602
Loan No. : IP S38 ‘Our Ret: PSMCW-20-6801
Lott Main Civil Works Date: August27, 2020
Contract No. :131.PHO41/DIR/2011 of March 18, 2011
Mr. Park, Kyung Ho
Project Manager
As Contractor's Representative
Hyundai E&C & PT. PP (Perseo) Thk JV
Dear Si,
Subject: Approval of Submission Electrical Drawing of Control House
Lighting & Auxiliary Service No.t Diversion wel
We refer tothe contractor letter Ref. IHPI/LOT }CRT/2008/070 recived an August 25%,
2020 regarding the above subject.
We hereby Approved the captioned drawings as atached,
Thank you for your kind attention,
Sey GS
T Ky
Team Le ineerff
ag
i
$
1
1
i
1
1
1
'
'
1
1
1
1
1
1
'
'
Hl
i
1
1
1
1
1
1
1
‘
1
Notes ;
4} Lay out equipment refer to drawing 2055/03/E64/12/027101
2) Cireuit agram refer to drawing 2055/05/E164121025101
‘A. Approved
27 AUG 2020,A Approved
27 AUG 20
Go|] 2lo|s|s|
CONTROL HOUSE AUXILIARY SERVICE & UTILITY SYSTEM
ites;
4, Chet agra an istibuton Panel davng fern 205S/0S/E/E4/121025/01
2. Final positon of fans, Switches Receptacle and Panel to be
‘coordinated with equipment positon of
LOT, LOT! & LOT It“A Approved
27 AUG a
Lats
{any
EAVES PASOIA
CONTROL HOUSE LIGHTING SYSTEM
Notes;
41 Chet Dagan and Disbuton Panel roving reef, 20S8/0S/E/64/121025/01