You are on page 1of 4
& PEUSANGAN 1&2 HYDROELECTRIC POWER PLANT CONSTRUCTION PROJECT PPT. KWARSA HEXAGON, PT, AMYTHAS, PT. HASEARM DIAN KONSULTAN PI. TATA GUNA PATRIA, PL: CONNUSA ENERGINDO, PL-Jaya CM ee re eee Loan No, :1P S38 (Our Ret: PSMCW-19-5520 Lot! ‘Main Civil Works ‘Contrmet No. : 131 PLIOSI/DIR/2011 of March 18,2011 Date: October 21,2019 Mr. Park, Kyung Ho Project Manager ‘as Contractor’ Representative Hyundai E&C & PT. PP (Persero) Tok JV Submission of 3 Revised for No.2 Power Station Premises Power House ‘And Penstock Line Lighting Subject Dea Si, ‘We refer to your letter INP VLOT VCRT/1910/031 dated October 9, 2019, We send herewith our eomments as per attached shoe RECEIVED 24 ocr i019 ‘omments ow the Contractor's Drawings {contracts er [Late No- HFELOTUCRTIOIOWH ed Oeer 92019 subject Iuison of Revs fr No, 2 Pov Sto Penis Hone Hea an Riek ne Un ‘Drawing Vide Rena, ‘Satu TR Roe Ss PS Pome Me Pes Ue ng Unig Up S| apgrve a Ne? Powe Son Premises Power Hee and enc Lin (1) ging hing Uppergat i 1 Reset Raew—[ Tez wan Come 1). Na-2 Power Staton Premises Pomer Hose and Peastock Line (1) Lighting Lighting Upperpart [reset ing “Approved by. No.2 Pomer Station Premises Power Howse and Perso Line (1 Lighting Lighting Uperpat LOTAICONCPSD2GID RS ec the drawing. "Approved

You might also like