& PEUSANGAN 1&2 HYDROELECTRIC POWER PLANT
CONSTRUCTION PROJECT
PPT. KWARSA HEXAGON, PT, AMYTHAS, PT. HASEARM DIAN KONSULTAN
PI. TATA GUNA PATRIA, PL: CONNUSA ENERGINDO, PL-Jaya CM
ee re eee
Loan No, :1P S38 (Our Ret: PSMCW-19-5520
Lot! ‘Main Civil Works
‘Contrmet No. : 131 PLIOSI/DIR/2011 of March 18,2011 Date: October 21,2019
Mr. Park, Kyung Ho
Project Manager
‘as Contractor’ Representative
Hyundai E&C & PT. PP (Persero) Tok JV
Submission of 3 Revised for No.2 Power Station Premises Power House
‘And Penstock Line Lighting
Subject
Dea Si,
‘We refer to your letter INP VLOT VCRT/1910/031 dated October 9, 2019,
We send herewith our eomments as per attached shoe
RECEIVED 24 ocr i019‘omments ow the Contractor's Drawings
{contracts er [Late No- HFELOTUCRTIOIOWH ed Oeer 92019
subject Iuison of Revs fr No, 2 Pov Sto Penis Hone Hea an Riek ne Un
‘Drawing Vide Rena, ‘Satu
TR Roe Ss PS Pome Me Pes Ue ng Unig Up S| apgrve
a Ne? Powe Son Premises Power Hee and enc Lin (1) ging hing Uppergat i 1
Reset Raew—[ Tez wan Come
1). Na-2 Power Staton Premises Pomer Hose and Peastock Line (1) Lighting Lighting Upperpart
[reset ing “Approved
by. No.2 Pomer Station Premises Power Howse and Perso Line (1 Lighting Lighting Uperpat
LOTAICONCPSD2GID RS
ec the drawing. "Approved