ee PEUSANGAN 1&2 HYDROELECTRIC POWER PLANT
CONSTRUCTION PROJECT
PI KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTAN
PI. TATA GUNA PATRIA, PT: CONNUSA ENERGINDO, PT. Jaya CM
pany oj non
Tanto iPS ‘ure PSVCW.20- 794
Tot Main Works Dates Daceber 29,2020
Contact No. TS-DHOULDINOLL of Mach 1, 2011
Mr. Park, Kyung Ho
Project Manager
‘As Contractors Representative
Hyundai E&C & PT. PP (Persero) Tok IV
Dear Sir,
Subject: Approval_of Submission of Drawing Auxiliary Service, Fan_and
Lighting Sysfem of Ware Howie at No.1 Outdoor Switelward
We rer tothe contactor leter Ref, IHPL/LOT UCRT/2012/133 Date Desember 24, 2020
that we received on December 6, 2020, eganling the above subject
We hereby Approved the captioned drawings as attached
‘Thank you for your kind attention
RECEIVED 9Nowe
PANEL 82
LIGHTING,RECEPTACLE AND UTILITY
J_*X? i mma TT Two fa |» |» | | + | wo]
1 Se
— oat ee I | lel |
ye 1 a tami ae To tT
2 [= | | 7
[Wann
i 29 DEC 2020
{Gre Diagram and Distbuon Pane drawing refer 088H9 612004020
2 Ble Suplyrequrement Capac wat ard phase tobe confirmeda
"Great iar an tse Pane oi le
asso ea t2n0420
_2.Suhth poste, EL. 100 mm From Fished Flor
| Roceplage EL. 00 nm From Fished Foot