You are on page 1of 3
ee PEUSANGAN 1&2 HYDROELECTRIC POWER PLANT CONSTRUCTION PROJECT PI KWARSA HEXAGON, PT. AMYTHAS, PT. HASFARM DIAN KONSULTAN PI. TATA GUNA PATRIA, PT: CONNUSA ENERGINDO, PT. Jaya CM pany oj non Tanto iPS ‘ure PSVCW.20- 794 Tot Main Works Dates Daceber 29,2020 Contact No. TS-DHOULDINOLL of Mach 1, 2011 Mr. Park, Kyung Ho Project Manager ‘As Contractors Representative Hyundai E&C & PT. PP (Persero) Tok IV Dear Sir, Subject: Approval_of Submission of Drawing Auxiliary Service, Fan_and Lighting Sysfem of Ware Howie at No.1 Outdoor Switelward We rer tothe contactor leter Ref, IHPL/LOT UCRT/2012/133 Date Desember 24, 2020 that we received on December 6, 2020, eganling the above subject We hereby Approved the captioned drawings as attached ‘Thank you for your kind attention RECEIVED 9 Nowe PANEL 82 LIGHTING,RECEPTACLE AND UTILITY J_*X? i mma TT Two fa |» |» | | + | wo] 1 Se — oat ee I | lel | ye 1 a tami ae To tT 2 [= | | 7 [Wann i 29 DEC 2020 {Gre Diagram and Distbuon Pane drawing refer 088H9 612004020 2 Ble Suplyrequrement Capac wat ard phase tobe confirmed a "Great iar an tse Pane oi le asso ea t2n0420 _2.Suhth poste, EL. 100 mm From Fished Flor | Roceplage EL. 00 nm From Fished Foot

You might also like