se PEUSANGAN 1&2 HYDROELECTRIC POWER PLANT
CONSTRUCTION PROJECT
NIPPON KOE! CO. LTD. in sociation with TERSCO,
PI. KWARSA HEXAGON, PT. AMYTHAS, PT HASFARM DIAN KONSULTAN
PI-TATA GUNA PATRIA, PT: CONNUSA ENERGINDO, PT. Ja)2 CM
Pree ar i 8 1, Wh aman Pe) 7h HH
‘sors ice" Sttan rain Nets Keen Baraka San 1460 Pome 03) 76056 a 0D] 2260
oan No, IP S38 ‘Our Ret: PSMICW-20-7295
Lot ‘Main Civil Works Date: December 29, 2020
Contract No, :131.PNO$1/DIR/2011 of March 18,2011
Mr, Pask, Kyung Ho
Project Manager
As Contractor’ Representative
Hyundai B&C & PT. PP (Persero) Tok J/V
Dear Sir,
Subject: Approval of Submission of Drawing Auxiliary Service and Lighting
System of Guard House at No, 1 Outdoor Switchvard
We refer to the contractor leter Ref IHPLILOT VCRT/2012/134 Date December 24, 2020
that we received on December 26, 2020, regarding the above subject.
We hereby Approved the captioned drawings as attached,
Thank you for you kind attention
RECeIVED _PANEL 91
Note:
1, Chout Daya an isbn Pane craving feo
‘RESNBEA 12OO4OIC 20SSOSEIEA ZN4NC
Tapeoae
29 DEC zoNets
1. Cre iagram ang Distbuton Pane cawing refer to
Z2OS8nSFEBUIZNO4INC
2. Final positon of raceptacie to be
‘coordinated with equipment postion of
LOT4LOTAI 8 LOT-It
For telephone and wiring willbe provided and istalled
by LOTAIl
4.For conduit and outlet telephone willbe provided and.
installed by Lot -1
‘Such postin EL. 1500 mm Fram Fished Foo
{6 Receptace EL 300 mm From Fished Ft
Telephone Wal Mou ype E1600 mm From Fished For
Teephane Desk ipe EL 00 mm For Fished For
Rea ERNE RE —
Fi _pmenmie naam
a
@_ ReNCEOT UCR