Chart: Programme according to Cl. 8.3 FIDIC Red Book

Start Cl. 8.3


Is there any Has the Contractor
programme which received the notice
has not been under Cl. 8.1?
rejected

Revising the Reliance on


Submission in Time?
Programme Programme

The C shows on each Programme:


(a) the order in which the Contractor intends to carry out the Works, including the
anticipated timing of each stage of design (if any), Contractor’s Documents, Sanction?
procurement, manufacture of Plant, delivery to Site, construction, erection and
testing,
(b) each of these stages for work by each nominated Subcontractor (as defined in
Clause 5 [Nominated Subcontractors]),
(c) the sequence and timing of inspections and tests specified in the Contract, and
(d) a supporting report which includes:
(i) a general description of the methods which the Contractor intends to adopt, and
of the major stages, in the execution of the Works, and Progress Reports
(ii) details showing the Contractor’s reasonable estimate of the number of each Cl. 4.21
class of Contractor’s Personnel and of each type of Contractor’s Equipment,
required on the Site for each major stage. Reports. Cl. 6.10

Rejection
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 241
FIDIC Training Module 1

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 242
FIDIC Training Module 1

Event

3 5

activity activity
Event

Commencement
1 4 6
Date
activity activity activity

2 7 8

activity activity

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 243
FIDIC Training Module 1

Accelaration
Cl. 8.6
Co-operation
Variation Claim
Cl. 4.6

Instruction
Variation Claim
Cl. 3.3

Programme To review

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 244
FIDIC Training Module 1

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 245
FIDIC Training Module 1

Issue of
Tests were
Notice Taking Over Defects Notification Period
successful
Certificate

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 246
FIDIC Training Module 1

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 247
FIDIC Training Module 1

Non attributable Perfor-


Variation mance
Defect
at cost
attributable
Max.
Defects Notification Period Extension Remedy
2 years

Taking
Over Non attributable
Variation
Defect
at cost
attributable

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 248
FIDIC Training Module 1

Perfor-
mance

Performance
Certificate
Remedy
Expiry of Defects
Notification Period New defects?

Remedy
Attention:
Documents
Effect of
civil law
Tests

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 249
FIDIC Training Module 1

Defects
Design & Defects
Contractor Notification Employer
Completion Liability
period

Yellow Book

Engineer

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 250
FIDIC Training Module 1

251
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG
FIDIC Training Module 1

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 252
FIDIC Training Module 1

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 253
FIDIC Training Module 1

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 254
FIDIC Training Module 1

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 255
FIDIC Training Module 1

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 256
FIDIC Training Module 1

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 257
FIDIC Training Module 1

Measurement and Evaluation


Engineer requires any part of the by reasonable notice
Works to be measured

•!Attendance of the Contractor


•!Supply of particulars by Contractor

Method of measurement (Sub-Clause 12.2)


•!Net actual quantity
•!Method in accordance with BoQ

Evaluation (Sub-Clause 12.3) Agreement or


•!according to rates specified in the Contract determination of
•!according to rates to be determined Contract Price in
accordance with Sub-
Clause 3.5
according to rates according to rates to be
specified in the Contract determined

Changement of quantity

Work instructed as a Variation

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 258
FIDIC Training Module 1

Measurement and Evaluation (Rates)


Measured actual quantity of
MDB
the item is changed
Version

by more than 10 % for the quantity Principle of a


of this item in the BoQ 25 %
balanced contract

This change in quantity multiplied Principle of relevancy


by such specified rate for this item 0,25 %
exceeds 0,01 % of the Accepted
Contract Amount

This change in quantity directly Principle of relevancy


changes Cost per unit quantity of
1%
this item by more than 1%
Any item for which no rate
This item is not a fixed item Principle of exclusivity was specified shall
be included in other rates
INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 259
FIDIC Training Module 1

INTERNATIONAL FEDERATION OF CONSULTING ENGINEERS – WORLD TRADE CENTER – GENEVA – SWITZERLAND – WWW.FIDIC.ORG 260

You might also like