Strcuture Details-I

Drawing Structure Chainage Span as per Treatment


Status Type Site
PUP 137826 1 x 5.5 x 2.5 Repair
Received PUP 138645 1 x 12 x 4.0 New
Received Box 138661 1x3x2 Re-Con

PUP 140613 1 x 5.5 x 3.0 Repair


1 x 5.5 x 3.7
Received Box 141085 1x3x1 Widen
Received Box 141630 1 x 2 x 1.8 Widen
Received PUP 142035 1 x 12 x 4.0 New
Received Box 142962 1x2x2 Widen
PUP 143518 1 x 12 x 4 COS - Re-Con
Received PUP 145675 1 x 12 x 4.0 Re-Located 148+330
FO 147600 1 x 31 x 5.5 Repair
Received Box 148015 1 x 2 x 1.5 Widen
PUP 148330 1 x 12 x 4 COS - Re-Located
Received Box 148462 1x2x2 COS - Re-Con
MNB 149182 3 x 43.5 Repair
MJB 149580 3 x 25.5 New
10.5 + 3 x
MJB 150300 New
20.5 + 10.5
Received MNB 150680 5 x 8.5 Widen
Pipe 151280 1x1x1 Re-Con
Received PUP 151500 1 x 12 x 4.0 New
Received Box 152803 1 x 2 x 1.7 Widen
PUP 153144 1 x 5.5 x 3.4 Repair
Received Pipe 153704 1x1x1 Widen
Received Box 154718 1 x 2 x 2.5 Widen
1 x 25.08 + 1
Received ROB 155875 x 37.28 + 1 x COS - Addi
25.08
Box 156351 1 x 3 x 2.5 Widen
Received Box 157740 1 x 1.5 x 2.5 Widen
VUP 158177 1 x 12 x 5.5 COS - Re-Con
Received Box 158326 1x3x3 COS - Re-Con
Received Box 158475 1x6x2 Re-Con
Box 158731 1 x 2 x 1.6 Widen
Received Box 158927 1 x 1.5 x 2.1 Widen
PUP 159400 1x7x3 COS - New
VUP 160071 2 x 12 x 5.5 COS - Re-Con
Received VUP 160516 1 x 12 x 5.5 New
Received Box 161989 1 x 6 x 2.6 Widen
MNB 162475 2 x 27 New
Received PUP 162900 1 x 12 x 4.0 New
Received Box 162987 1 x 3 x 3.2 Re-Con
Received Box 163230 1x3x3 Widen
PUP 163639 1 x 5.5 x 2.5 Repair
Received Box 164029 1x3x2 Widen
Structure Sec- 1 org

Bikash (S.E) Hussain (A.E.)

(Box
MJB , Culverts
MNB & &
DRAIN Underpas
ses)

Sukant Behera (A.E) Sonu (J.E)

J.E/ J.E/
Supervisor - 2 Supervisor - 2
Vacant Vacant
ure Sec- 1 organisational Chart

PM

DPM

Yashjeet Asst. Engineer


(G.E.T) Vacant Janmejoy Das (A.E)

RE - C.O.S
Pannel ROB
PUP
FSCB
VUP
Drain

J.E/ J.E/ Junior Engineer


-1
Supervisor - 2 Supervisor - 1 Vacant
Vacant Vacant
-1
Vacant
Junior Engineer
anmejoy Das (A.E)
All document
work (BBS,
Reconciliation,
Quantity
estimation,
PRW Bills)
Balance Structure work details as on Date : 14.11.2021 (Package -I)
Drawing Status Work Status Shuttering Requirement (Sqm) Steel Requirement (KG) Concrete Requirement (Cum)
Structure Span as
Sr No Chainage Treatment Submitted Approve Feasibility Remarks
Type per Site LHS RHS LSR LHS RHS RSR LSR LHS RHS RSR LSR LHS RHS RSR
to IE d by IE
Shuttering
After LHS
for only
BOX Both SR & MCW SR S.R. Work
1 138+661 3X2 Reconstruction Approved COMPLETED COMPLETED
0 0 213.36 0 MCW 0 0 5041 0 0 0 81.25 0
Culvert can be
(RHS)
started.
portion

BOX Both SR & MCW SR


2 141+085 3X1 Widening only Approved COMPLETED COMPLETED
completed 0 0 0 0 completed 0 0 0 0 0 0 0 0
Culvert

BOX Both SR & MCW SR


3 141+630 2 X 1.8 Widening only Approved COMPLETED COMPLETED
completed 0 0 0 0 completed 0 0 0 0 0 0 0 0
Culvert

De watering Utility
BOX
4 142+962 2X2 Widening only Approved pump 0 66.36 0 135 shifting is 0 842.61 0 1930.63 0 13.35 0 28.2
Culvert
required pending

BOX SR SR
5 148+015 2 X 1.5 Widening only Approved COMPLETED COMPLETED
completed 0 0 0 0 completed 0 0 0 0 0 0 0 0
Culvert
BOX
148+462 1 x 2 x 2 COS - Re-Con
Culvert
BOX SR SR
6 148+458 1.8 X 2.2 Widening only Approved COMPLETED COMPLETED
completed 0 0 0 0 completed 0 0 0 0 0 0 0 0
Culvert
BOX SR SR
7 152+698 2 X 1.7 Widening only Approved COMPLETED COMPLETED
completed 0 0 0 0 completed 0 0 0 0 0 0 0 0
Culvert

Shuttering
for only
BOX MCW water flow
8 154+718 2 X 2.5 Widening only Approved COMPLETED 0 0 29.4 0 MCW 0 0 653.5 0 0 0 5.616 0
Culvert due rain
(RHS)
portion

Drawing
BOX Drawing not
9 156+351 3 X 2.5 Widening only Not Approved ______ _____ ___ ____ ____ ____ not ____ ____ ____ ____ ____ ____ ____ ____
Culvert available
available
BOX SR SR
10 157+740 1.5 X 2.5 Widening only Approved COMPLETED COMPLETED
completed 0 0 0 0 completed 0 0 0 0 0 0 0 0
Culvert
Shuttering
BOX water flow for only
11 158+326 3X5 COS - Re-Con Approved NR 0 0 0 248 0 0 0 5041 0 0 0 81.25
Culvert due rain RSR
portion

Shuttering
BOX SR water flow for LHS ,
12 158+475 6X2 New Approved 0 233.44 233.44 0 0 5041 5041 0 0 81.25 81.25 0
Culvert COMPLETED due rain RHS, RSR
portion

Drawing
BOX SR Drawing not
13 158+721 2 X 1.6 Widening only Not Approved ______ COMPLETED
___ ____ ____ ____ not ____ ____ ____ ____ ____ ____ ____ ____
Culvert available
available

Shuttering
De watering
BOX PCC for LHS ,
14 158+921 1.5 X 2.1 Widening only Approved pump 113.52 36.486 0 113.52 2292.31 653.5 0 2292.31 28.2 5.65 0 28.2
Culvert COMPLETED LSR , RSR
required
portion

BOX MCW MCW


15 161+989 6 X 2.6 Widening only Approved COMPLETED COMPLETED
completed 0 0 0 0 completed 0 0 0 0 0 0 0 0
Culvert
After LHS
Shuttering
BOX Both SR & MCW Only SR S.R. Work
16 162+987 3 X 3.2 Reconstruction Approved COMPLETED COMPLETED
0 0 213.36 0 for RHS 0 0 5038 0 0 0 81.25 0
Culvert can be
portion
started.

Bottom De watering Shuttering


BOX Both SR & MCW
17 163+222 3 X 3.2 Widening only Approved COMPLETED Haunch pump 0 0 32.96 0 for RHS 0 0 942.61 0 0 0 13.35 0
Culvert
completed required portion

Shuttering
De watering
BOX for L.H.S
18 164+029 3X2 Widening only Approved pump 113.52 0 29.4 0 2292.31 0 630.22 0 28.2 0 5.616 0
Culvert SR & RHS
required
portion
Balance Structure work details as on Date : 14.

Drawing Status Work Status


Sr Structure Span as per
Chainage Treatment
No Type Site
Submitted Approved by
LHS
to IE IE
1 HPC 151+280 1x1x1 Re-Con Not approved -

2 HPC 153+704 1x1x1 Widen Approved


-
work details as on Date : 14.11.2021 (Package -I)
NP4 Class
Work Status Hume Pipe (1.0 Concrete
Feasibility mtr Dia) Remarks Requirement
(Cum)
RHS RMT

-
De watering
Pump
- required 17 2.5 Mtr Each Pipe 31.45
Remarks FOR PM
& DPM SIR SITE
Remarks
VISIT ON DT-03-
09-2021

Drawing not vailable

Drawing available
Balance Structure work details as on Date : 14.11.2021 (Package -I)
SHUTTERING CONCRETE REQ
Drawing Status Work Status STEEL REQ (MT) REMARKS
Structure Span as per QTY (SQM) (CUM)
Sr No Chainage Treatment Feasibility Remarks
Type Site Submitted Approved
LHS RHS LHS RHS LHS RHS LHS RHS
to IE by IE

Not Methodology
1 PUP 137+826 1 x 5.5 x 2.5 Repair - -
Approved not available

After LHS S.R.


shuttering For 1 Drawing
2 PUP 138+645 12 X 4 New Approved COMPLETED - Work can be 0 434.32 0 30 0 290
side Available
started.

1 x 5.5 x 3.0 Not Methodology


3 PUP 140+613 Repair
1 x 5.5 x 3.7 Approved not available

After LHS S.R.


shuttering For 1 Drawing
4 PUP 142+025 12 X 4 New Approved COMPLETED - Work can be 0 434.32 0 30 0 290
side Available
started.

BHS Work can


RE- Not Drawing not
5 PUP 143+518 5.5 X 2.5 - - be started after
Construction Approved available
SR construction

After LHS S.R.


shuttering For 1 Drawing
6 PUP 148+200 12 X 4 New Approved - COMPLETED Work can be 434.32 0 30 0 290 0
side Available
started.
Drawing
7 PUP 151+500 12 X 4 New Approved COMPLETED COMPLETED COMPLETED 0 0 COMPLETED 0 0 0 0
Available

Not Methodology
8 PUP 153+144 1 x 5.5 x 3.4 Repair
Approved not available

BHS Work can


Not Drawing not
9 VUP 158+177 1 x 12 x 5.5 COS - Re-Con be started after
Approved available
SR construction

BHS Work can


Not Drawing not
10 PUP 159+400 1x7x3 COS - New - - be started after
Approved available
SR construction

BHS Work can


Not Drawing not
11 VUP 160+071 2 x 12 x 5.5 COS - Re-Con - - be started after
Approved available
SR construction

Drawing
12 VUP 160+516 12 X 5.5 New Approved COMPLETED COMPLETED COMPLETED 0 0 COMPLETED 0 0 0 0
Available
After LHS S.R.
shuttering For 1 Drawing
13 PUP 162+900 12 X 4 New Approved COMPLETED - Work can be 0 434.32 0 30 0 290
side Available
started.

Not Methodology
14 PUP 163+639 1 x 5.5 x 2.5 Repair
Approved not available
Balance Structure work details as on Date : 14.11.2021 (Package -I)
Drawing Status Work Status Shuttering Requirement (Sqm) Remarks FOR PM
Steel Concrete
Sr Structure Span as per & DPM SIR SITE
Chainage Treatment Submitted Approved Feasibility Sub Super Remarks Requirement Requirement Remarks
No Type Site LHS RHS Girder Foundation VISIT ON DT-03-
to IE by IE structure Structure (MT) (Cum)
09-2021

Sub-structure
De watering
work in progress RCC GIRDER
1 MJB 149+580 3x25.5 (76.5) New Approved NA pump required 480.18 34.97 291.411 Heavy water Flow
(Cap bottom CASTING COMPLTED
at site
level)
De watering
10.08+3x19.0 ALL PILE RCC GIRDER
2 MJB 150+285 New Approved pump required Heavy water Flow
6+10.08 COMPLETED CASTING COMPLTED
NA at site 1581.6 200.54 1671.199
NOT DRAWING De watering
DRAWING NOT Drawing not
3 MNB 150+680 5x8.5 Widen APPROVE NOT NA pump required - &
CONFIRMED available
D APPROVED at site

(A1&A2 PILE
COMPLETED) PSC GIRDER De watering
4 MNB 162+475 2x27 New Approved (P1 UPTO PIER NA CASTING NOT pump required Heavy water Flow
SHAFT STARTED DUE TO at site
COMPLETED) NON AVAILABILITY
OF PSC MATERIALS 287.03 52.75 600.5

N.B. - For shuttering material requirement we have already given indent ( ) on date / /2021
, but till date material not available at store.
Balance Structure wo
Drawing Status Work Status
Sr Structure Span as per
Chainage Treatment Submitted Approved
No Type Site LHS RHS
to IE by IE

1 ROB 155+883 1X24 New


lance Structure work details as on Date : 14.11.2021 (Package -I)
Work Status Shuttering Requirement (Sqm) Steel
Feasibility Sub Super Remarks Requirement
Girder Foundation (MT)
structure Structure

shuttering For 1 pier


(fdn+shaft + cap) + 1
abutment (fdn+shaft + 70
cap) + 1 deck slab.(A1-
P1, P1-P2)
Remarks FOR PM
Concrete
& DPM SIR SITE
Requirement Remarks
VISIT ON DT-03-
(Cum)
09-2021

591.7625 as per old DPR GAD


BEARING REQUIREMENT FOR ODISHA PROJECT- BGCC (Package -I)
Bearing Details (nos)
Sr Structure
Chainage Span Treatment Elastomeric Bearing Metallic Bearing Remarks
No Type Elastomeric Pin Bearing Metalic Guided
Size Size
Pin & metallic
Drawing not
1 MJB 149+580 3x25.5 New (450 X 360 X 121 mm) Bearing drawing not 24 3 3
available
available
Pin & metallic
10.08+3x19.0 Drawing not
2 MJB 150+285 New (400 X 250 X 63 mm) Bearing drawing not 24 3 3
6+10.08 available
available
3 MNB 150+680 5x8.5 Widen NA NA SOLID SLAB 0 0 0
Pin & metallic
Drawing not
4 MNB 162+475 2x27 New (400 X 300 X 73 mm) Bearing drawing not 16 2 2
available
available
BRIJ GOPAL CONSTRUCTION COMPANY PVT. LTD.,

Project Name: Rehabilitation And Up-gradation of 4-Lane to 6-Lane of Bhadrak - Baleshwar Section of NH-5 (New NH-16) from Km. 136.500 to Km.
199.141) in the State of Odisha to be Executed as Hybrid Annuity Mode Under NHDP Phase - V (Package - II)

IMPORTANT MATERIALS TO BE PROCURED FOR PSC GIRDER


For PSC Girder

SL. Length of
Structure Type Chainage Span Treatment Sheathing Anchor cone H.T. Strands Live wedges Master Bearing Plate
NO HDPE Pipe pipe O.D = 96 (12.7 mm)
19T13 (NOS) (nos) wedges (nos) (nos)
MM (NOS) (MT)

1 MNB 162+475 ( 2 x 27.0 ) 26.560 MTR New 32


370 107.84 6484 100 360

2 MJB 198+550 ( 6 X 40.5) 40.500 MTR New 144

NOTE : IMPORTANT ITEMS TO BE PURCHASED


ITEMS UNIT QUANTITY
1 Slush Pump 15 HP with Starter electric box (3 phase) NOS 4
2 Diesel Dewatering Pump (HONDA) with fittings & accessories NOS 2
3 6'' Delivery Pipe (Fire Fighting Canvas Hose Pipe) RMT 100