4 142+962 2X2 Widening only Approved pump 0 66.36 0 135 shifting is 0 842.61 0 1930.63 0 13.35 0 28.2
Culvert
required pending
BOX SR SR
5 148+015 2 X 1.5 Widening only Approved COMPLETED COMPLETED
completed 0 0 0 0 completed 0 0 0 0 0 0 0 0
Culvert
BOX
148+462 1 x 2 x 2 COS - Re-Con
Culvert
BOX SR SR
6 148+458 1.8 X 2.2 Widening only Approved COMPLETED COMPLETED
completed 0 0 0 0 completed 0 0 0 0 0 0 0 0
Culvert
BOX SR SR
7 152+698 2 X 1.7 Widening only Approved COMPLETED COMPLETED
completed 0 0 0 0 completed 0 0 0 0 0 0 0 0
Culvert
Shuttering
for only
BOX MCW water flow
8 154+718 2 X 2.5 Widening only Approved COMPLETED 0 0 29.4 0 MCW 0 0 653.5 0 0 0 5.616 0
Culvert due rain
(RHS)
portion
Drawing
BOX Drawing not
9 156+351 3 X 2.5 Widening only Not Approved ______ _____ ___ ____ ____ ____ not ____ ____ ____ ____ ____ ____ ____ ____
Culvert available
available
BOX SR SR
10 157+740 1.5 X 2.5 Widening only Approved COMPLETED COMPLETED
completed 0 0 0 0 completed 0 0 0 0 0 0 0 0
Culvert
Shuttering
BOX water flow for only
11 158+326 3X5 COS - Re-Con Approved NR 0 0 0 248 0 0 0 5041 0 0 0 81.25
Culvert due rain RSR
portion
Shuttering
BOX SR water flow for LHS ,
12 158+475 6X2 New Approved 0 233.44 233.44 0 0 5041 5041 0 0 81.25 81.25 0
Culvert COMPLETED due rain RHS, RSR
portion
Drawing
BOX SR Drawing not
13 158+721 2 X 1.6 Widening only Not Approved ______ COMPLETED
___ ____ ____ ____ not ____ ____ ____ ____ ____ ____ ____ ____
Culvert available
available
Shuttering
De watering
BOX PCC for LHS ,
14 158+921 1.5 X 2.1 Widening only Approved pump 113.52 36.486 0 113.52 2292.31 653.5 0 2292.31 28.2 5.65 0 28.2
Culvert COMPLETED LSR , RSR
required
portion
Shuttering
De watering
BOX for L.H.S
18 164+029 3X2 Widening only Approved pump 113.52 0 29.4 0 2292.31 0 630.22 0 28.2 0 5.616 0
Culvert SR & RHS
required
portion
Balance Structure work details as on Date : 14.
-
De watering
Pump
- required 17 2.5 Mtr Each Pipe 31.45
Remarks FOR PM
& DPM SIR SITE
Remarks
VISIT ON DT-03-
09-2021
Drawing available
Balance Structure work details as on Date : 14.11.2021 (Package -I)
SHUTTERING CONCRETE REQ
Drawing Status Work Status STEEL REQ (MT) REMARKS
Structure Span as per QTY (SQM) (CUM)
Sr No Chainage Treatment Feasibility Remarks
Type Site Submitted Approved
LHS RHS LHS RHS LHS RHS LHS RHS
to IE by IE
Not Methodology
1 PUP 137+826 1 x 5.5 x 2.5 Repair - -
Approved not available
Not Methodology
8 PUP 153+144 1 x 5.5 x 3.4 Repair
Approved not available
Drawing
12 VUP 160+516 12 X 5.5 New Approved COMPLETED COMPLETED COMPLETED 0 0 COMPLETED 0 0 0 0
Available
After LHS S.R.
shuttering For 1 Drawing
13 PUP 162+900 12 X 4 New Approved COMPLETED - Work can be 0 434.32 0 30 0 290
side Available
started.
Not Methodology
14 PUP 163+639 1 x 5.5 x 2.5 Repair
Approved not available
Balance Structure work details as on Date : 14.11.2021 (Package -I)
Drawing Status Work Status Shuttering Requirement (Sqm) Remarks FOR PM
Steel Concrete
Sr Structure Span as per & DPM SIR SITE
Chainage Treatment Submitted Approved Feasibility Sub Super Remarks Requirement Requirement Remarks
No Type Site LHS RHS Girder Foundation VISIT ON DT-03-
to IE by IE structure Structure (MT) (Cum)
09-2021
Sub-structure
De watering
work in progress RCC GIRDER
1 MJB 149+580 3x25.5 (76.5) New Approved NA pump required 480.18 34.97 291.411 Heavy water Flow
(Cap bottom CASTING COMPLTED
at site
level)
De watering
10.08+3x19.0 ALL PILE RCC GIRDER
2 MJB 150+285 New Approved pump required Heavy water Flow
6+10.08 COMPLETED CASTING COMPLTED
NA at site 1581.6 200.54 1671.199
NOT DRAWING De watering
DRAWING NOT Drawing not
3 MNB 150+680 5x8.5 Widen APPROVE NOT NA pump required - &
CONFIRMED available
D APPROVED at site
(A1&A2 PILE
COMPLETED) PSC GIRDER De watering
4 MNB 162+475 2x27 New Approved (P1 UPTO PIER NA CASTING NOT pump required Heavy water Flow
SHAFT STARTED DUE TO at site
COMPLETED) NON AVAILABILITY
OF PSC MATERIALS 287.03 52.75 600.5
N.B. - For shuttering material requirement we have already given indent ( ) on date / /2021
, but till date material not available at store.
Balance Structure wo
Drawing Status Work Status
Sr Structure Span as per
Chainage Treatment Submitted Approved
No Type Site LHS RHS
to IE by IE
Project Name: Rehabilitation And Up-gradation of 4-Lane to 6-Lane of Bhadrak - Baleshwar Section of NH-5 (New NH-16) from Km. 136.500 to Km.
199.141) in the State of Odisha to be Executed as Hybrid Annuity Mode Under NHDP Phase - V (Package - II)
SL. Length of
Structure Type Chainage Span Treatment Sheathing Anchor cone H.T. Strands Live wedges Master Bearing Plate
NO HDPE Pipe pipe O.D = 96 (12.7 mm)
19T13 (NOS) (nos) wedges (nos) (nos)
MM (NOS) (MT)