TOMMORROW PROGRAMME

DATE:- 8/25/2021
Chainage Machinary
DEPARTMENT Length(M) Side DESCRIPTION Quantity(CUM) Remarks
From To 1 2

163280 190+220 40 LHS M-25 GRADE DRAIN SLAB 6 TM

190+240 190+270 30 LHS M-25 GRADE DRAIN WALL 7.866 TM

189+920 189+960 40 LHS M-25 GRADE DRAIN RAFT 6.9 TM


STRUCTURE
SECTION (II)
181+400 181+421 35 LHS M-25 GRADE Drain slab 5.25 TM

181+315 181+320 5 LHS M-25 GRADE Drain wall 1.311 TM

181+420 181+423 3 LHS M-25 GRADE Drain wall 0.7866 TM


TODAY REPORT
\Date- 9/2/2021
Chainage
DEPARTMENT Length(M) Side DESCRIPTION Quantity(CUM)
From To

162+950 163+013 63 LHS Drain pcc 7.25

162+600 162+609 9 LHS Drain Wall


6
STRUCTURE
163+330 163+355 25 LHS Drain Slab
SECTION (I)

148+458 148+500 42 LHS Drain Wall 3.25

155+100 LHS FSCB 10.75

27.25
TOMMORROW PROGRAMME
DATE:- 9/2/2021
Chainage Machinary
DEPARTMENT Length(M) Side DESCRIPTION Quantity(CUM) Remarks
From To 1 2

162+950 162+998 48 LHS Drain Raft 7.25

163+332 163+357 25 LHS Drain wall 4.75 JCB

163+282 163+307 25 LHS Drain Slab 3.75

141+640 141+660 20 LHS Drain pcc 2.5 JCB


STRUCTURE
SECTION (I)
141+640 141+660 20 LHS Drain raft 5.25

148+458 BHS Retaining wall pcc 3 Excavator

155+100 LHS FSCB 11

162+645 LHS MNB Excavation Excavator Water Tanker

37.5

M15 M25 M30 M35 M40 TOTAL


5.5 21 0.000 0.00 11.00 37.5
SL.NO Employe name Designation Work
1 Sukant Behera Asst. Engg. MJB,RFI,PUP,VUP
BBS,Shuttering BOQ ,
2 Janmejoy Das Asst. Engg.
Measurement ,RFI,MNB
3 Yashjeet Sinha GET Drain,MJB,FSCB
4 Sonu kumar Meheta Supervisor Drain ,Box,Re pannel
TOMMORROW PROGRAMME
DATE:- 8/30/2021
Chainage Machinary
SECTION Length(M) Side DESCRIPTION Quantity(CUM) Remarks
From To 1 2

185+920 185+960 40 LHS M25 Grade of Drain Raft 6

185+960 185+990 30 LHS M25 Grade of Drain PCC 1

162+674 162+696 22 LHS M25 Grade of Drain slab 3.25

162+622 162+670 48 LHS M25 Grade of Drain RAFT 7.25


STRUCTURE
SECTION (I)
151+750 151+770 20 LHS M25 Grade of Drain slab 3

151+200 151+218 18 RHS M25 Grade of Drain wall 3.25 JCB

148+458 RSR BOX Wall 6 Excavator

155+100 LHS FSCB 11

Drain Raft 88 13.25


Drain Wall 18 3.25
Drain Slab 72 7.25