Project : Colombo Katunayake Expressway Doc.

No : CSE-CKE-SD-01
Rev. No 00
Project Engineer : Civil and Structural Engineering Date : 18.05.2016
Page
Consultants Author : Eng. Shiromal Fernando
B.Sc Eng(Hons), MPhiI, MIESL, CEng. MSSE(SL)

REPORT

ELEMENT DESIGN REPORT

Reference sheet
Document number Description

Civil and Structural Engineering Consultants (Pvt) Ltd


No. 64, Barnes Place
Colombo 07
Sri Lanka

Revision History

18.05.2016 NA FOR INFORMATION BW


Revision Date Prepared by Description Checked Project
by Approved

Total no of pages [incl Att]


.. CSE
Introduction
The second express highway built from Colombo- Katunayake is set to reduce travel time to the airport. The
CKE constructed through the Muthurajawela Marshland, travels along the Negombo lagoon and falls on to the
Canada Friendship Road leading to the Bandaranaike International Airport. The CKE connects to the Outer
Circular Highway at Kerawalapitiya, which in turn is connected to the Southern Expressway.

It is proposed to construct additional MTC lane and Ramp widening at Ja-Ela. The report consist with load
evaluation for the new structural elements, stability calculations and the preliminary design calculations.

The ETAB and PROKON software are used for the design calculations. .

Figure 1 : Colombo Katunayake Expressway

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Modification area

Figure 2 : Front Elevation of Car Park

Figure 2 : Plan view of interchange

Figure 3 : Section view of Modification area

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Design Summary

Column Design

Mxx Myy
Axial Required Provided
Column Force R/F As
(KN) Top Botttom Top Bottom mm2 mm2
(KNm) (KNm) (KNm) (KNm)
C1 2851 7415.7
1880 22.1 -9.84 82.99 14.29
(450x450mm) (1.41%) (3.6%)
C2 2025 7415.7
-544 4.9 -63.8 11.5 18.9
(450x450mm) (1.00%) (3.6%)

Beam Design

R/F Shear
Beam R/F Provided Shear Provided
Requirement Requirement

2225mm2 2100mm2
B1 T10@150 T10@125
(5T25) (3T25+2T20)
2100mm2
B2 1817mm2 T10@200 T10@125
(3T25+2T20)
2100mm2
B3 1121mm2 T10@475 T10@125
(3T25+2T20)
6434mm2
B4 5548mm2 T10@225 T12@125
(8T32)

Slab Design

Design Moment R/F


R/F Provided
(KNm/m) Requirement

61.45 T12@125mm T12@125mm

48.075 T12@150mm T12@150mm

Pile Design

Serviceability load Capacity No of piles per pile


Pile
group
Compression Tension
P1 (400ɸ) 1884.8 KN 1080.8 KN 4

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
ETAB model output

Figure 4 : ETAB Model for Modified Tall Gate

Com 1 = 1.0 Dead Load +1.0 Super Dead Load + 1.0 Live

Load Com 2 = 1.4 Dead Load + 1.4 Super Dead Load +

1.6 Live Load

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Column Design

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Beam Design

Figure 6 : Beam Arrangement of Toll Gate

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Design of Beam B1(750/400X300)

Load Calculation

Dead Loads

Dead loads from the slabs = 24 KN/m3 x 0.175m x 5m x 0.5 x 2

= 21 KN/m

S.Dead loads from the slabs = 1.5 KN/m2 x 5m x 0.5 x 2

= 7.5 KN/m

Total Dead load to the beam B1 = (21+7.5) KN/m

= 28.5 KN/m

Live Loads

Live loads from the slabs = 5 KN/m2 x 5m x 0.5 x 2

= 25 KN/m

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Elastic Deflections (Alternate spans loaded) Def max = 8.577mm @ 5.72m
-.500
.200
.400
.600
.800
1.00

1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
.500
1.00
1.50
2.00
2.50
3.00
3.50
4.00
4.50
5.00
5.50
6.00
6.50
7.00
7.50
8.00
8.50

SHEAR: X-X V max = -455.0kN @ 2.10m


300
250
200
150
100
50.0
.200
.400
.600
.800
1.00

1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60
-50.0
-100
-150
-200
-250
-300
-350
-400
-450

MOMENTS: X-X M max = -559.2kNm @ 2.10m


-580
-560
-540
-520
-500
-480
-460
-440
-420
-400
-380
-360
-340
-320
-300
-280
-260
-240
-220
-200
-180
-160
-140
-120
-100
-80.0
-60.0
.200
.400
.600
.800

1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60

-40.0
-20.0

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Shear Steel: X-X Asv max = .5260mm²/mm @ 1.43m
.540
.520
.500
.480
.460
.440
.420
.400
.380
.360
.340
.320
.300
.280
.260
.240
.220
.200
.180
.160
.140
.120
.100
.080
.060
.200
.400

.800

1.00
1.20

1.60
1.80

2.20

2.60

3.00

3.40
3.60

4.00

4.40

4.80

5.20
5.40
.600

1.40

2.00

2.40

2.80

3.20

3.80

4.20

4.60

5.00

5.60
.040
.020

Bending Steel: X-X As max = -2173mm2 @ 2.10m


-2200
-2100
-2000
-1900
-1800
-1700
-1600
-1500
-1400
-1300
-1200
-1100
-1000
-900
-800
-700
-600
-500
-400
-300
-200
.200
.400
.600
.800

1.00
1.20
1.40
1.60
1.80
2.00
2.20
2.40
2.60
2.80
3.00
3.20
3.40
3.60
3.80
4.00
4.20
4.40
4.60
4.80
5.00
5.20
5.40
5.60

-100

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Reinforcement Requirement for Maximum Bending

Reinforcement Requirement for Shear

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Design of Beam B2(750/400X300)

Load Calculation

Dead Loads

Dead loads from the slabs = (24 KN/m3 x 0.175m x 5m x 0.5 ) +


= ((24 KN/m3 x 0.175m x 3.375m x 0.5 )
= 17.59 KN/m

S.Dead loads from the slabs = (1.5 KN/m2 x 5m x 0.5) +


= (1.5 KN/m2 x 3.375m x 0.5)
= 6.28 KN/m

Total Dead load to the beam B2 = (17.59+6.28) KN/m


= 23.87 KN/m

Live Loads

Live loads from the slabs = (5 KN/m2 x 5m x 0.5) +


= (5 KN/m2 x 3.375m x 0.5)
= 20.94 KN/m

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Project : Colombo Katunayake Expressway Project Date : 19.05.2016
Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Project : Colombo Katunayake Expressway Project Date : 19.05.2016
Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Reinforcement Requirement for Maximum Bending

Reinforcement Requirement for Shear

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Design of Beam B3(750/400X300)

Load Calculation

Dead Loads

Dead loads from the slabs = (24 KN/m3 x 0.175m x 3.375m x 0.5)+
= (24 KN/m3 x 0.175m x 1m)
= 11.29 KN/m

S.Dead loads from the slabs = (1.5 KN/m2 x 3.375m x 0.5) +


= (1.5 KN/m2 x 1m)
= 4.03 KN/m

Total Dead load to the beam B2 = (11.29 + 4.03) KN/m


= 15.32 KN/m

Live Loads

Live loads from the slabs = (5 KN/m2 x 3.375m x 0.5) +


= (5 KN/m2 x 1m)
= 13.44 KN/m

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Project : Colombo Katunayake Expressway Project Date : 19.05.2016
Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Project : Colombo Katunayake Expressway Project Date : 19.05.2016
Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Reinforcement Requirement for Maximum Bending

Reinforcement Requirement for Shear

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Design of Beam B4(750/400X300)

Load Calculation

Dead Loads

P1 = 172.9 KN

P2 = 249.5 KN

P3 = 291.0 KN

Live Loads

P1 = 120.4 KN

P2 = 187.6 KN

P3 = 224.0 KN

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Elastic Deflections (Alternate spans loaded) Def max = 65.36mm @ 0.00m
-15.0
-10.0
-5.00
1.00

2.50

3.00

4.50
.500

1.50

2.00

3.50

4.00

5.00

6.50

7.00

8.00

8.50

10.0

10.5

12.0

12.5

13.5

14.0

15.5

16.0

17.5

18.0
5.50

6.00

7.50

9.00

9.50

11.0

11.5

13.0

14.5

15.0

16.5

17.0

18.5
5.00
10.0
15.0
20.0
25.0
30.0
35.0
40.0
45.0
50.0
55.0
60.0
65.0

SHEAR: X-X V max = -461.2kN @ 4.38m


450
400
350
300
250
200
150
100
50.0
.500

2.00

2.50

4.00

4.50
1.00

1.50

3.00

3.50

5.50

6.00

7.50

8.00

9.50

10.0

11.5

13.0

13.5

15.0

15.5

17.0

18.5
5.00

6.50

7.00

8.50

9.00

10.5

11.0

12.0

12.5

14.0

14.5

16.0

16.5

17.5

18.0
-50.0
-100
-150
-200
-250
-300
-350
-400
-450

MOMENTS: X-X M max = -1519kNm @ 4.38m

-1400
-1200
-1000
-800
-600
-400
.500

1.50

3.00

4.00

4.50

5.50

6.00

7.00

8.50

9.50

10.0

11.0

12.5

13.5

14.0

15.0

16.5

17.5

18.0
1.00

2.00

2.50

3.50

5.00

6.50

7.50

8.00

9.00

10.5

11.5

12.0

13.0

14.5

15.5

16.0

17.0

18.5

-200

200
400
600
800
1000
1200

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Shear Steel: X-X Asv max = 1.991mm²/mm @ 17.8m
2.00
1.90
1.80
1.70
1.60
1.50
1.40
1.30
1.20
1.10
1.00
.900
.800
.700
.600
.500
.400
.300
.200
.500

1.00

1.50

2.00

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

6.50

7.00

7.50

8.00

8.50

9.00

9.50

10.0

10.5

11.0

11.5

12.0

12.5

13.0

13.5

14.0

14.5

15.0

15.5

16.0

16.5

17.0

17.5

18.0

18.5
.100

Bending Steel: X-X As max = -5423mm2 @ 4.38m


-5500
-5000
-4500
-4000
-3500
-3000
-2500
-2000
-1500
-1000
3.00

3.50

4.00

4.50
.500

1.00

1.50

2.00

2.50

5.00

7.50

8.00

8.50

9.00

9.50

11.5

12.0

12.5

13.0

13.5

16.5

17.0

17.5

18.0
5.50

6.00

6.50

7.00

10.0

10.5

11.0

14.0

14.5

15.0

15.5

16.0

18.5

-500
500
1000
1500
2000
2500
3000
3500
4000
4500

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Reinforcement Requirement for Maximum Bending

Reinforcement Requirement for Shear

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Slab Design

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Pile Design

Compression Pile (400ɸ) Tension Pile (400ɸ)

9m Ks = 40KPa
Ks = 40KPa x 50%
9m

2m Ks = 150KPa Ks = 150KPa x 50%


2m

Structural Capacity (QSt)


QSt = 0.25 x fcu X Ac
= 0.25 x 30 N/mm2 X π x (200)2 mm2
= 942.4KN

Geotechnical Capacity (Qf)


The ultimate capacity Qf of a pile is equal to the base capacity plus the skin friction acting on the
shaft.

For Compression Pile


Qf = End Bearing + Skin Friction
= End bearing capacity x Ab + Skin friction coefficient x AS
= 1000 KPa x π x (200)2 x10-6m2 + (π x 0.4m )(40 KPa x 9m + 150 KPa x 2m)
= 955.0 KN

For Tension Pile


Qf = Pile Weight + Skin Friction x 50%
= Pile Weight + Skin friction coefficient x AS x 50%
= π x 0.2m2 x 11m x 24 KN/m3 + (π x 0.4m)(40 KPa x 9m + 150 KPa x 2m) x 0.5
= 447.9 KN

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Total serviceability load capacity of the compression piles = Min (Structural Capacity, Geotechnical
Capacity)
= 942.4KN x2
= 1884.8 KN > 1284 KN
Total serviceability load capacity of the tension piles = Min (Structural Capacity, Geotechnical Capacity)
= 447.9 KN x 2
= 895.8 KN > 368 KN

Com 1 - 1.0 Dead Load + 1.0 Super Dead Load + 1.0 Live
Load Com 2 - 1.4 Dead Load + 1.4 Super Dead Load +
1.6 Live Load

Axial Load Diagram

Provide four piles to bear the loads from the columns as shown below.

Compression Pile Tension Pile

Pile Arrangement
Project : Colombo Katunayake Expressway Project Date : 19.05.2016
Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Design of Tension Column and Pile

Tension Force = 544 KN


𝑇
Reinforcement Area Requirement
0.87 𝑓𝑦
=

544 𝑥 103
=
0.87 𝑥 500

= 1250 mm2

Provided Pile Diameter = 400 mm

Pile Area = 125663.7 mm2

Pile Area X 0.8 % = 1005.3 mm2 < Required Area (1250


mm2)

Pile Area X 1.0 % = 1256.64 mm2 > Required Area (1250


mm2)
Provide 8T16 = 1608.5 mm2 > Required Area (1250
mm2)

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Pile Cap Design (BS 8110 : PART 1 : 1997)

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Project : Colombo Katunayake Expressway Project Date : 19.05.2016
Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Project : Colombo Katunayake Expressway Project Date : 19.05.2016
Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Project : Colombo Katunayake Expressway Project Date : 19.05.2016
Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Geotechnical Design
The following geotechnical parameters were used for the analysis.

Classification Ø’ C’(KPa) γ’ (KPa)


Clayey sand / Dense Sand 290 10 18
Organic Clay 100 20 14
Residual Soil 290 10 18

Layer Position Layer description SPT


No. (m) No.
1a 0.0-4.1 Lateritic Fill 30
1b 4.1-7.3 Very dense sand > 50
1c 7.3-13.7 Clayey sand/ Dense sand 15-50
2 13.7-14.8 Organic clay 8
3 14.8-15.4 Residual soils 25
4 15.4-18.3 Completely weathered rock > 50
5 > 18.3 Basement rock

Elastic
Layer description Average Shear strength Ultimate bearing
Modulus
SPT parameters capacity (kN/m2) E (kN/m2)
Very dense sand > 50 c' = 0 kPa, φ' = 43 > 1000 > 25000
Clayey sand/ Dense c' = 10 kPa, φ' =
15-50 490 18000
sand 29
Organic clay 8 Φu = 0, cu = 20 kPa 150 2000
c' = 10 kPa, φ' =
Residual soils 25 490 18000
29
Completely c' = 10 kPa, φ' =
> 50 2000 > 25000
weathered rock 38

 400mm diameter concrete pile sections were used.


 Pile properties are as follows;
 Concrete grade = C30 N/mm2
 Concrete density = 24 KN/m3
 GWT of the lane lies at a depth of 1.00 m.

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Slope Stability Analysis

 The slope stability analysis was done by using Slide 6.005 software and above
geotechnical parameters were used for the analysis.

10 x ddiameter of pile

 The anti-slide pile should be extend by 10xPile diameter from the failure plane.

Slope Stability - Global failure

Factor of Safety for above two cases are greater than 1.5. Hence Slope is safe.

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01
Conclusion

 The structure is satisfactory to accommodate serviceability considerations and the


strength requirements.

Recommendation
 Consolidation settlement analysis shall be done by the Geotechnical Engineer.

 Pre-loading height shall be given by the Geotechnical Engineer.

Reference
 Geotechnical Guideline hong kong 2007

 BS 8002 Code of Practice for Earth Retaining Structures.

Project : Colombo Katunayake Expressway Project Date : 19.05.2016


Doc. Title : Element Deaign Report Rev. : 00
Doc. no. : CSE-CKE-SD-01