Professional Documents
Culture Documents
All Modules
Version 0.1
The transaction codes to execute these processes in ERP system are placed in subsequent sections:
8 Transfer Posting MIGO 542 Receive back from Vendor after Repair
9 Goods Receipt MIGO Z52 Scrap generation
(others)
10 Transfer Posting MIGO 415 Stock Movement from O&M to Project (Scheme)
11 Transfer Posting MIGO 415Q Stock Movement from Project To Project
(Scheme to Scheme)
12 Transfer Posting MIGO 411Q Stock Movement from Project (Scheme) to O&M
13 Goods Issue (Others) MIGO 221 (JE) Consumption of O&M Stock against
scheme/estimate
14 Goods Issue (Others) MIGO 221Q (JE) Consumption of Scheme Stock against
scheme/estimate
15 Goods Issue (Others) MIGO 201 Consumption of O&M Stock from JE stock to
Cost Center other than transformer
16 Goods Issue (Others) MIGO 281 Consumption of O&M Stock from JE stock
Workshop to Network other than transformer
17 Goods Issue (Others) MIGO 281Q Consumption of Project (Scheme) from JE stock
Workshop to Network other than transformer
18 Transfer Posting MIGO Z11 Movement of O&M stock from JE stock to
vendor stock
19 Transfer Posting MIGO Z11Q Movement of Project (Scheme) stock from JE
stock to vendor stock
20 Transfer Posting MIGO Z11 Movement of O&M stock from Vendor stock to
JE stock
21 Transfer Posting MIGO Z11Q Movement of Project (Scheme) stock from
Vendor stock to JE stock
22 Goods Issue (Others) MIGO Z21 Consumption of O&M Stock against
scheme/estimate from Vendor Location