You are on page 1of 1

Change over layout (24.Jul.

2023)

Change over layout for 690VI line


(8.Jun.2023) Change over layout for 900packing
1.CMC : 1pc
2. Scanner :1pc
3. PC :
4. internet : 1pc
1.CMC :
2. Scanner :1pc
3. PC : 1pc
4. internet : 1pc
line (8.Jun.2023)
5. Electric source : 5. Electric source :
6. Air source : 6. Air source :

1.CMC : 1pc 1.CMC : 1pc


1.CMC : 1.CMC : 1pc
2. Scanner :1pc 2. Scanner :2pc
1.CMC : 1pc 1.CMC : 2. Scanner :1pc 2. Scanner :1pc 3. PC : 1pc
3. PC :

25400 5026 2. Scanner :1pc


3. PC :
4. internet : 1pc
2. Scanner :2pcs
3. PC : 2pcs
4. internet : 2pcs
3. PC : 1pc
4. internet : 1pc
5. Electric source :
3. PC :
4. internet : 1pc
5. Electric source :
4. internet : 1pc
5. Electric source :
6. Air source :
4. internet : 2pc
5. Electric source :
6. Air source :
5. Electric source : 5. Electric source : 2x1.3kw 6. Air source : 6. Air source :

1111 3300 6. Air source : 6. Air source :

10 11 17 2 3 4
2 4 6 7
CCD VI
Place Leaf

1550
for putty NG Place Bracket
TOP inspection AVI visual inspection
Table support

C-Cover assembly

Support table
15001
place location spring1 pcs (No use)
Support table

Support table

Support table

place putty place putty (No use )


9 15

Trolley
putty

Semi- finish good


(0809:3pcs) (0644:2pcs) place putty 22
1 (No use)

table
to PCBA

table
HS clean+paste On line
690_BINDING 0833: 1pc
table

thermal 0818 to GPU screw


VI
Printer
0678: 2 pcs 23

3700
machine

CMC
787 2400
CMC CMC

PG141-0344-V00P1 6490
CMC CMC

Conveyor 2 layer
1G136
600 850 4489
CMC
CMC

install
900 336

Printer
CMC
NG

2367
table

location screw of Printing


Support table

Support table

cover 6pcs Online printing 1 Shipping box

table
Put cables into small
instal
Screw
place PCB and
Place 19
49 box and arrange Packing into Stick on tape for label, Packing
In put &VI
link SN Put 2 cable install bracket C-shape cover

Trolley
HS&cover to 16 accessory Retail box Retail box (2pcs) into PE bag
&screw 2 pcs 20 OQA
jig
Screw

place putty on HS place putty on HS 8 21 Bracket clean TOP VI & scan


install, 23

1300
Install screw Install screw 14 20 22
(0925 : 3 pcs) (0925:3 pcs) leafspring install screw of install screw of
Remove protective film Remove protective film
BC Testing
7 9 11 12 18
2pcs (No use) 4pcs(No use) 14
Bottom inspection
2 4

500
Lock screw and screw 13 bracket (No use) bracket 2pcs QC spot check 5
to cover
3 5
12 17 18
925

BC
Printer UPC 列印 CMC

3111
CMC CMC CMC

Conveyor Conveyor Conveyor 顶升

300
1.CMC : 1pc
1.CMC :
装置
2. Scanner :1pc

796
2. Scanner :1pc

24

Scan & insert PCBA


3. PC : Scale

BC
4. internet : 1pc 3. PC : 1pc Printer
1 25
5. Electric source : 4. internet : 1pc Packing into

weighting
and stick
5. Electric source :
雕 Install rubber

Scaning
6. Air source : BOT VI Put two bulk box
Scale

carton
6. Air source :
Tear off protective film BC Testing
15 instructions andcover into 21

label
BC
3 8
5 13 a warranty Cardgolden finger stick UPC

Printer
10 Remove accessory into small box label (1PCS)
10 11
19
Place Leaf 17 +weigh+bagging
2 4 6 7
CCD VI install 17

put to tray
Install small cover
Laser Sculpture

NG washer, spring1 pcs (No


for putty Place Bracket
Table support

400 765
Support table

place location leafspring use)


Support table

Support table

Support table

place putty place putty (No use )


putty 9 and screw 15
0809: 3pcs 0643:1pc place putty 22
1
1358
table

(0806 3pcs)
784965 1400 933

table
0758: 1pc to PCBA On line
GPU putty
690_BINDING 0566 : 3 pcs
4028 600
table

paste+V-cover screw VI 23

&
machine

CMC
CMC CMC
PG136-0362 1.CMC : 1pc 1.CMC :
1.CMC : 1.CMC :
1700 725
600
CMC
2. Scanner :1pc 2. Scanner :1pc 1.CMC : 1.CMC :
Screw
CMC
2. Scanner :4pc 2. Scanner :4pc
install 3. PC : 3. PC : 1pc 2. Scanner :

Printer
CMC
NG 3. PC : 4pc 3. PC : 4pc 2. Scanner :1pc
table

screw of 4. internet : 1pc 4. internet : 1pc 3. PC : 1pc


Support table

Support table

location place putty 4. internet : 4pc 4. internet : 4pc 3. PC : 1pc


cover screw of 5. Electric source : 5. Electric source : 4. internet : 1pc
table

to PCBA 5. Electric source : 4x1.3kw 4. internet : 1pc


table

5. Electric source :
Screw
place PCB and instal 6. Air source : 5. Electric source :
0833: 2 pcs 19 V-cover 4pcs 6. Air source : 6. Air source : 5. Air source :
Screw link SN Put 3 cable V-shape cover install install 6. Air source :1pc(0.6Mpa) 6. Air source :
install bracket 20 6. Vacuum :
place putty on HS 8 screw of screw of 21 7. Vacuum : 1pc 7. Vacuum :
place putty on HS
0758: 1pc Install screw Install screw bracket bracket 3
0926: 1pc
0809: 2 pcs 4pcs(No use) 4pcs(No use) 14 2pcs pcs
install support 0819: 2pc 13
3 5
block and screw 12 17 18

10 11
7
CCD VI install Place Leaf 17
2 4 6
put to tray
for putty NG washer, spring1 pcs (No
Place Bracket Install small cover
Table support

Support table

place location leafspring use)


Support table
Support table

Support table

(No use )
1
putty place putty
0809: 3pcs
place putty
0819: 2pcs
9 and screw 15
22 Layout trial (23.Aug.2023)
table

(0806 3pcs)
table

0760: 1pc 0691: 1pc place putty On line


GPU putty
690_BINDING to PCBA
table

paste+V-cover screw
0833: 2 pcs VI 23 Printing
&

machine
CMC

0931: 1 pcs Put cables into small Shipping box Put cables into small
CMC CMC
PG136-0332 16
box and arrange Packing into Stick on tape for label, Packing
Retail box (2pcs) into PE bag 16
box and arrange
accessory
stick UPC Stick on tape for
Retail box (2pcs)
Screw

600 CMC
CMC

850 787 Bracket clean TOP VI & scan


1936 14
accessory Retail box
20 23
OQA Bracket clean TOP VI & scan
14
label (1PCS)
20 23
OQA

925 22 22
Remove protective film Remove protective film
CMC
NG install 7 9 11 12 18
Remove protective film Remove protective film
7 9 11 12 18
table

BC Testing BC Testing
screw of 2 4 2 4
Support table

Support table

location 5 5
cover
table

screw of
table

instal
Screw
place PCB and place putty

BC

BC
19 V-cover 4pcs QC spot check
link SN Put 3 cable V-shape cover

Semi- finish good


Screw
to PCBA install install 20
Bottom inspection
UPC 列印 UPC 列印

Trolley
CMC CMC
Printer Printer
8 install bracket
0566: 4 pcs 21
place putty on HS place putty on HS screw of screw of CMC CMC CMC CMC CMC CMC

0806: 2 pcs 0926: 1pc


Install screw
4pcs(No use)
Install screw
4pcs(No use)
bracket bracket 3 Conveyor Conveyor Conveyor 顶升 Conveyor Conveyor Conveyor 顶升
install support 0758: 1pc 0819: 2pcs 13 14 2pcs pcs
block and screw
3 5
12 17 18
In put &VI
装置 装置
1

3700
1G136 鐳
24 1G136 鐳
Packing
24 into

Scan & insert PCBA

Scan & insert PCBA


Scale

BC

BC
Printer Printer
Weigh bulk
1 25 1 25
Packing into box+Weigh+

weighting
Conveyor 2 layer

and stick
雕 雕
Install rubber Remove

Scaning
label print

Packing
box and
BOT VI Put two bulk box BOT VI Put two Install rubber
Scale

carton
Scale accessory Scale

carton
Tear off protective film BC Testing
15 instructions andcover into 21 Tear off protective film BC Testing
15 instructions and
cover into 21

label

label
1G136

stick
BC

BC
CMC CMC
3 8 8
5 13 a warranty Cardgolden finger stick UPC 3 5 13 a warranty Cardgolden finger+
機 機 Packing into

Printer

Printer
Printer
10 Remove accessory into small box 19 label (1PCS) 10 into small box remove SN

1550
+weigh+bagging Retail box
label 19

Trolley
Laser Sculpture 17 Laser Sculpture 17
Fan cover assembly

C-Cover assembly
10 11
TOP inspection AVI visual inspection

Place CCD VI
7 17 2 3
2 4 6 4
Putty NG Place Leaf
place for putty Place Bracket
Table support

Support table

1. 0894(1pc) location spring1 pcs (No use)


1111 3300
Support table

Upper cover stick


Support table

Support table

place putty (No use )


2. 0566 (3pcs) 9 15
Insert

Packing
cover &

Screw
thermal Pad
1 (No use) putty 0562(3pcs) Align cable On line 22
Printing
place putty Packing into
table

0959(4pcs) screw Packing into


Put cables into small Put cables into small
Lock wire

Shipping box box and arrange Retail box+ Stick on tape for
690_BINDING
Screw
to PCBA machine box and arrange Retail box+ Stick on tape for
table

place putty AVI label, Packing insert rubber Retail box (2pcs)
insert rubber Retail box (2pcs) 16
Screw
16 accessory
to PCBA (0903:5pcs) 23
(No use) accessory OQA OQA
into PE bag
CMC

TOP VI & scan TOP VI & scan

5026
(0140:1pc) 14 20 Scan MES & Remove protective film
12 14 20 22
CMC Scan MES &
issue work order
Remove protective film
7 9 11 12 18 22 23 issue work order BC Testing
7 9 11 18 23
0 BC Testing
0 2 4

place
CMC
5G133-0510 2 4 5 5

BC
CMC

BC
NG
Printer

CMC
table

putty
(28.Aug.2023) UPC 列印
Support table

Support table

location UPC 列印
CMC
Printer
install
CMC
Printer
0959(4pcs) CMC CMC CMC
CMC CMC
table

Install Install CMC


back-cover&
100 100 顶升
Screw
place place PCB and Screw
Conveyor Conveyor 顶升 Conveyor Conveyor
install bracket Thermal Pad 19 screw screw
putty (No use) (No use) link SN
0959(4pcs) 8 &screw 2 pcs (0904-2pcs) 520pcs 5 pcs
21 装置 装置
Stick thermal install,
Install screw Install screw
leafspring install screw of install screw of
1G141 1G141 鐳
Scale

Scan & insert PCBA



Pad to heatsink Scale

Scan & insert PCBA


2pcs (No use) 4pcs(No use)
925

BC
14 24

BC
and screw 13 bracket (No use) bracket 2pcs Printer 24 Printer

3 5 1 1
12 17 18 25 25

雕 雕 Packing into
Print on line and
Print on line and Packing into

weighting
Put two

weighting
Put two BOT VI

and stick
BOT VI

and stick
QC spot check stick 900 SN label

Scaning
stick 900 SN label

Scaning
BC Testing
21 bulk box

Semi- finish good


Bottom inspection BC Testing
15 instructions and 21 bulk box 15 instructions and Scale

carton
BC
Scale 8

carton
BC
8

Trolley
3

label
3 5

label
5 a warranty Card stick UPC 13 a warranty Card stick UPC

13
10
機 Remove accessory into small box 19 label (1PCS) 10 Remove accessory into small box 19 label (1PCS)

Printer
Printer
+weigh+bagging +weigh+bagging 17
In put &VI Laser Sculpture 17 Laser Sculpture

3700
Conveyor 2 layer
1G141 Printing
CMC CMC Put cables into small Shipping box
box and arrange Packing into Stick on tape for label, Packing
16 Retail box (2pcs) into PE bag

331
Printer
accessory Retail box

805
Stick BIOS LABEL&
Tear 699SN TOP VI & scan
OQA

Trolley
Scan MES & Remove protective film 14 20 22 23
issue work order
4 BC Testing 7 9 11 12 18
0 2 5

BC
C-Cover assembly TOP inspection
10 11 AVI visual inspection

6 7 install 17 UPC 列印
2 4
CMC
Printer
2 3 4 CMC CMC
leafspring CMC
Table support

Place 顶升
Support table

and screw Conveyor Conveyor


Support table

Support table

Support table

1 place place place Leaf spring Place Bracket


CCD for 8
Packing

putty putty putty putty


1 pcs 20 装置
table

inspection+Remove the
clean HS+ place On line
5G133 鐳
Scale

Scan & insert PCBA

Take PE bag+Visual
PTM
table

table

screw

BC
Printer
VI 1 25
machine
CMC

5026 雕 Scale
CMC
CMC CMC BOT VI Put two

Retail box
21

weighting
Tear off protective film BC Testing
15

and stick
instructions and

Scaning
BC
CMC

PG132 3 5
8 24

carton
13 a warranty Card stick UPC

label
CMC

Printer
10 Remove accessory into small box 19 label (1PCS)
CMC
install
+weigh+bagging
Support table

Support table

screw of Laser Sculpture 17


place place cover
base place PCB+SN cable Place module into protective
Install Install install bracket 19
link settle Putty cover cover
screw 4pcs screw 4pcs and screw
9 install 15 CHECK_ASSY_1
QC spot check

Semi- finish good


1 Place Place Install Install
leafspring and 13 14

Trolley
Putty Putty 690_BINDING 12 Printing
screw screw 1 pcs screw 1 pcs
16 Shipping box
3 CHECK_ASSY_1 Put cables into small
5 10 17 18 In put &VI box and arrange Packing into Stick on tape for label, Packing
16 accessory Retail box Retail box (2pcs) into PE bag

800 1 Stick BIOS LABEL& OQA

3700
Tear 699SN TOP VI & scan
Scan MES & Remove protective film 14 20 22 23
CMC issue work order
4 BC Testing
7 9 11 12 18

500
0 2 5
Conveyor 2 layer

BC
UPC 列印
CMC
CMC
Printer
CMC CMC CMC

顶升
Printer

5G133 Conveyor Conveyor

Trolley
装置

inspection+Remove the
5G132 鐳
Scale

Scan & insert PCBA

Take PE bag+Visual
BC
Printer
Bottom inspection TOP inspection AVI visual inspection 1 25
Scale
2 3 4 BOT VI
雕 Put two

Retail box

weighting
Tear off protective film BC Testing
15 21

and stick
instructions and

BC

Scaning
3 8
5

carton
13 a warranty Card stick UPC

label
Printer
10 Remove accessory into small box 19 label (1PCS)
+weigh+bagging
Laser Sculpture 17
24

5026
Fan cover assembly

10 11
Place CCD
7 VI 17
2 4 6
Putty NG Place Leaf
place for putty Place Bracket
Table support

Stick thermal
Support table

1. 0894(1pc) location spring1 pcs (No use)


Support table
Support table

Support table

Pad to heatsink place putty (No use )


2. 0566 (3pcs) 9 15 QC spot check
Packing

Screw

Semi- finish good


1 (No use) putty 0562(3pcs) Align cable On line 22

Trolley
place putty
table

0959(4pcs) screw
Lock wire

690_BINDING
Screw
to PCBA machine
table

place putty Screw


VI
VI & Install
to PCBA (0903:5pcs) (No use) 23
CMC

In put &VI
CAP
(0140:1pc) 1

3700
CMC

NG
CMC
CMC
5G133-0510
Printer

CMC
Conveyor 2 layer
table
Support table

Support table

location install
place
table

place Install Install


CMC CMC
Screw
back-cover&
putty
(No use)
putty
(No use)
place PCB and
link SN
Screw

install bracket Thermal Pad 19 screw screw Printer


5G132
Upper cover stick 0959(4pcs) 0959(4pcs) 520pcs 5 pcs
8 &screw 2 pcs (0904-2pcs) 21

Trolley
thermal Pad install,
Install screw Install screw install screw of
leafspring install screw of
2pcs (No use) 4pcs(No use) 13 14 bracket (No use) bracket 2pcs
and screw
3 5
12 17 18 Bottom inspection TOP inspection AVI visual inspection

2 3 4

5026

You might also like