Professional Documents
Culture Documents
2023)
10 11 17 2 3 4
2 4 6 7
CCD VI
Place Leaf
1550
for putty NG Place Bracket
TOP inspection AVI visual inspection
Table support
C-Cover assembly
Support table
15001
place location spring1 pcs (No use)
Support table
Support table
Support table
Trolley
putty
table
to PCBA
table
HS clean+paste On line
690_BINDING 0833: 1pc
table
3700
machine
CMC
787 2400
CMC CMC
PG141-0344-V00P1 6490
CMC CMC
Conveyor 2 layer
1G136
600 850 4489
CMC
CMC
install
900 336
Printer
CMC
NG
2367
table
Support table
table
Put cables into small
instal
Screw
place PCB and
Place 19
49 box and arrange Packing into Stick on tape for label, Packing
In put &VI
link SN Put 2 cable install bracket C-shape cover
Trolley
HS&cover to 16 accessory Retail box Retail box (2pcs) into PE bag
&screw 2 pcs 20 OQA
jig
Screw
1300
Install screw Install screw 14 20 22
(0925 : 3 pcs) (0925:3 pcs) leafspring install screw of install screw of
Remove protective film Remove protective film
BC Testing
7 9 11 12 18
2pcs (No use) 4pcs(No use) 14
Bottom inspection
2 4
500
Lock screw and screw 13 bracket (No use) bracket 2pcs QC spot check 5
to cover
3 5
12 17 18
925
BC
Printer UPC 列印 CMC
3111
CMC CMC CMC
300
1.CMC : 1pc
1.CMC :
装置
2. Scanner :1pc
796
2. Scanner :1pc
鐳
24
BC
4. internet : 1pc 3. PC : 1pc Printer
1 25
5. Electric source : 4. internet : 1pc Packing into
weighting
and stick
5. Electric source :
雕 Install rubber
Scaning
6. Air source : BOT VI Put two bulk box
Scale
carton
6. Air source :
Tear off protective film BC Testing
15 instructions andcover into 21
label
BC
3 8
5 13 a warranty Cardgolden finger stick UPC
機
Printer
10 Remove accessory into small box label (1PCS)
10 11
19
Place Leaf 17 +weigh+bagging
2 4 6 7
CCD VI install 17
put to tray
Install small cover
Laser Sculpture
400 765
Support table
Support table
Support table
(0806 3pcs)
784965 1400 933
table
0758: 1pc to PCBA On line
GPU putty
690_BINDING 0566 : 3 pcs
4028 600
table
paste+V-cover screw VI 23
&
machine
CMC
CMC CMC
PG136-0362 1.CMC : 1pc 1.CMC :
1.CMC : 1.CMC :
1700 725
600
CMC
2. Scanner :1pc 2. Scanner :1pc 1.CMC : 1.CMC :
Screw
CMC
2. Scanner :4pc 2. Scanner :4pc
install 3. PC : 3. PC : 1pc 2. Scanner :
Printer
CMC
NG 3. PC : 4pc 3. PC : 4pc 2. Scanner :1pc
table
Support table
5. Electric source :
Screw
place PCB and instal 6. Air source : 5. Electric source :
0833: 2 pcs 19 V-cover 4pcs 6. Air source : 6. Air source : 5. Air source :
Screw link SN Put 3 cable V-shape cover install install 6. Air source :1pc(0.6Mpa) 6. Air source :
install bracket 20 6. Vacuum :
place putty on HS 8 screw of screw of 21 7. Vacuum : 1pc 7. Vacuum :
place putty on HS
0758: 1pc Install screw Install screw bracket bracket 3
0926: 1pc
0809: 2 pcs 4pcs(No use) 4pcs(No use) 14 2pcs pcs
install support 0819: 2pc 13
3 5
block and screw 12 17 18
10 11
7
CCD VI install Place Leaf 17
2 4 6
put to tray
for putty NG washer, spring1 pcs (No
Place Bracket Install small cover
Table support
Support table
Support table
(No use )
1
putty place putty
0809: 3pcs
place putty
0819: 2pcs
9 and screw 15
22 Layout trial (23.Aug.2023)
table
(0806 3pcs)
table
paste+V-cover screw
0833: 2 pcs VI 23 Printing
&
machine
CMC
0931: 1 pcs Put cables into small Shipping box Put cables into small
CMC CMC
PG136-0332 16
box and arrange Packing into Stick on tape for label, Packing
Retail box (2pcs) into PE bag 16
box and arrange
accessory
stick UPC Stick on tape for
Retail box (2pcs)
Screw
600 CMC
CMC
925 22 22
Remove protective film Remove protective film
CMC
NG install 7 9 11 12 18
Remove protective film Remove protective film
7 9 11 12 18
table
BC Testing BC Testing
screw of 2 4 2 4
Support table
Support table
location 5 5
cover
table
screw of
table
instal
Screw
place PCB and place putty
BC
BC
19 V-cover 4pcs QC spot check
link SN Put 3 cable V-shape cover
Trolley
CMC CMC
Printer Printer
8 install bracket
0566: 4 pcs 21
place putty on HS place putty on HS screw of screw of CMC CMC CMC CMC CMC CMC
3700
1G136 鐳
24 1G136 鐳
Packing
24 into
BC
BC
Printer Printer
Weigh bulk
1 25 1 25
Packing into box+Weigh+
weighting
Conveyor 2 layer
and stick
雕 雕
Install rubber Remove
Scaning
label print
Packing
box and
BOT VI Put two bulk box BOT VI Put two Install rubber
Scale
carton
Scale accessory Scale
carton
Tear off protective film BC Testing
15 instructions andcover into 21 Tear off protective film BC Testing
15 instructions and
cover into 21
label
label
1G136
stick
BC
BC
CMC CMC
3 8 8
5 13 a warranty Cardgolden finger stick UPC 3 5 13 a warranty Cardgolden finger+
機 機 Packing into
Printer
Printer
Printer
10 Remove accessory into small box 19 label (1PCS) 10 into small box remove SN
1550
+weigh+bagging Retail box
label 19
Trolley
Laser Sculpture 17 Laser Sculpture 17
Fan cover assembly
C-Cover assembly
10 11
TOP inspection AVI visual inspection
Place CCD VI
7 17 2 3
2 4 6 4
Putty NG Place Leaf
place for putty Place Bracket
Table support
Support table
Support table
Packing
cover &
Screw
thermal Pad
1 (No use) putty 0562(3pcs) Align cable On line 22
Printing
place putty Packing into
table
Shipping box box and arrange Retail box+ Stick on tape for
690_BINDING
Screw
to PCBA machine box and arrange Retail box+ Stick on tape for
table
place putty AVI label, Packing insert rubber Retail box (2pcs)
insert rubber Retail box (2pcs) 16
Screw
16 accessory
to PCBA (0903:5pcs) 23
(No use) accessory OQA OQA
into PE bag
CMC
5026
(0140:1pc) 14 20 Scan MES & Remove protective film
12 14 20 22
CMC Scan MES &
issue work order
Remove protective film
7 9 11 12 18 22 23 issue work order BC Testing
7 9 11 18 23
0 BC Testing
0 2 4
place
CMC
5G133-0510 2 4 5 5
BC
CMC
BC
NG
Printer
CMC
table
putty
(28.Aug.2023) UPC 列印
Support table
Support table
location UPC 列印
CMC
Printer
install
CMC
Printer
0959(4pcs) CMC CMC CMC
CMC CMC
table
BC
14 24
BC
and screw 13 bracket (No use) bracket 2pcs Printer 24 Printer
3 5 1 1
12 17 18 25 25
雕 雕 Packing into
Print on line and
Print on line and Packing into
weighting
Put two
weighting
Put two BOT VI
and stick
BOT VI
and stick
QC spot check stick 900 SN label
Scaning
stick 900 SN label
Scaning
BC Testing
21 bulk box
carton
BC
Scale 8
carton
BC
8
Trolley
3
label
3 5
label
5 a warranty Card stick UPC 13 a warranty Card stick UPC
機
13
10
機 Remove accessory into small box 19 label (1PCS) 10 Remove accessory into small box 19 label (1PCS)
Printer
Printer
+weigh+bagging +weigh+bagging 17
In put &VI Laser Sculpture 17 Laser Sculpture
3700
Conveyor 2 layer
1G141 Printing
CMC CMC Put cables into small Shipping box
box and arrange Packing into Stick on tape for label, Packing
16 Retail box (2pcs) into PE bag
331
Printer
accessory Retail box
805
Stick BIOS LABEL&
Tear 699SN TOP VI & scan
OQA
Trolley
Scan MES & Remove protective film 14 20 22 23
issue work order
4 BC Testing 7 9 11 12 18
0 2 5
BC
C-Cover assembly TOP inspection
10 11 AVI visual inspection
6 7 install 17 UPC 列印
2 4
CMC
Printer
2 3 4 CMC CMC
leafspring CMC
Table support
Place 顶升
Support table
Support table
Support table
inspection+Remove the
clean HS+ place On line
5G133 鐳
Scale
Take PE bag+Visual
PTM
table
table
screw
BC
Printer
VI 1 25
machine
CMC
5026 雕 Scale
CMC
CMC CMC BOT VI Put two
Retail box
21
weighting
Tear off protective film BC Testing
15
and stick
instructions and
Scaning
BC
CMC
PG132 3 5
8 24
carton
13 a warranty Card stick UPC
機
label
CMC
Printer
10 Remove accessory into small box 19 label (1PCS)
CMC
install
+weigh+bagging
Support table
Support table
Trolley
Putty Putty 690_BINDING 12 Printing
screw screw 1 pcs screw 1 pcs
16 Shipping box
3 CHECK_ASSY_1 Put cables into small
5 10 17 18 In put &VI box and arrange Packing into Stick on tape for label, Packing
16 accessory Retail box Retail box (2pcs) into PE bag
3700
Tear 699SN TOP VI & scan
Scan MES & Remove protective film 14 20 22 23
CMC issue work order
4 BC Testing
7 9 11 12 18
500
0 2 5
Conveyor 2 layer
BC
UPC 列印
CMC
CMC
Printer
CMC CMC CMC
顶升
Printer
Trolley
装置
inspection+Remove the
5G132 鐳
Scale
Take PE bag+Visual
BC
Printer
Bottom inspection TOP inspection AVI visual inspection 1 25
Scale
2 3 4 BOT VI
雕 Put two
Retail box
weighting
Tear off protective film BC Testing
15 21
and stick
instructions and
BC
Scaning
3 8
5
carton
13 a warranty Card stick UPC
機
label
Printer
10 Remove accessory into small box 19 label (1PCS)
+weigh+bagging
Laser Sculpture 17
24
5026
Fan cover assembly
10 11
Place CCD
7 VI 17
2 4 6
Putty NG Place Leaf
place for putty Place Bracket
Table support
Stick thermal
Support table
Support table
Screw
Trolley
place putty
table
0959(4pcs) screw
Lock wire
690_BINDING
Screw
to PCBA machine
table
In put &VI
CAP
(0140:1pc) 1
3700
CMC
NG
CMC
CMC
5G133-0510
Printer
CMC
Conveyor 2 layer
table
Support table
Support table
location install
place
table
Trolley
thermal Pad install,
Install screw Install screw install screw of
leafspring install screw of
2pcs (No use) 4pcs(No use) 13 14 bracket (No use) bracket 2pcs
and screw
3 5
12 17 18 Bottom inspection TOP inspection AVI visual inspection
2 3 4
5026