You are on page 1of 92

EQUIPMENT

CHILLEDWATER PRIMARY PUMPDATE / …………….

EQUIPMENT TAG

CHPP-P1 (to) CHPP-P9

LOCATION

CUP-2 BUILDING / ZONE-10 / GROUND LEVEL

SR.No

Description

Daily

Check the operation  of machine


 In Operation Not in Operation

Check un-usual noise and vibration.

Check for leakage and at the Mechanical Seal.

Check valve seals for leakages

Weekly

Check valves for proper operation and setting

DATE

CHPP-P1
CHPP-P2

CHPP-P3

CHPP-P4

CHPP-P5

CHPP-P6

CHPP-P7

CHPP-P8

CHPP-P9

REMARKS

1/……/2021
2/……/2021

3/……/2021
4/……/2021
5/……/2021

6/……/2021
7/……/2021
8/……/2021
9/……/2021

10/……/2021
11/……/2021
12/……/2021

13/……/2021
14/……/2021
15/……/2021
16/……/2021

17/……/2021
18/……/2021
19/……/2021

20/……/2021
21/……/2021
22/……/2021
23/……/2021

24/……/2021
25/……/2021
26/……/2021

27/……/2021
28/……/2021
29/……/2021
30/……/2021

31/……/2021
DAILY & WEEKLY SERVICE PLANNED PREVENTIVE MAINTENANCE REPORT

ENGINEER SIGNFOREMAN SIGNTECHNICIAN SIGN

DAILY & WEEKLY SERVICE PLANNED PREVENTIVE MAINTENANCE REPORT


EQUIPMENT

CHILLED WATER SECONDARY PUMP DATE / …………..

EQUIPMENT TAG

CHSP-P1 (to) CHSP-P7

LOCATION

CUP-2 BUILDING / ZONE-1 / GROUND LEVEL

SR.No

Description

Daily
1

Check the operation  of machine


 In Operation Not in Operation

Check un-usual noise and vibration.

Check for leakage and at the Mechanical Seal.

Check valve seals for leakages

Weekly

Check valves for proper operation and setting

DATE

CHSP -P1

CHSP

–P2

CHSP

–P3

CHSP

-P4

CHSP

-P5

CHSP

-P6

CHSP

-P7
REMARKS

1/……/2021

2/……/2021
3/……/2021

4/……/2021
5/……/2021

6/……/2021
7/……/2021
8/……/2021

9/……/2021
10/……/2021

11/……/2021
12/……/2021

13/……/2021
14/……/2021
15/……/2021

16/……/2021
17/……/2021

18/……/2021
19/……/2021

20/……/2021
21/……/2021
22/……/2021

23/……/2021
24/……/2021

25/……/2021
26/……/2021

27/……/2021
28/……/2021
29/……/2021

30/……/2021
31/……/2021

ENGINEER SIGN FOREMAN SIGN TECHNICIAN SIGN

DAILY & WEEKLY SERVICE PLANNED PREVENTIVE MAINTENANCE REPORT


EQUIPMENT

CONDENSER WATER PUMPS DATE / ………………

EQUIPMENT TAG
:

CWP-P1 (to) CWP-P5

LOCATION

CUP-2 BUILDING / ZONE-7-2 / LOWER LEVEL

SR.No

Description

Daily

Check the operation  of machine


 In Operation Not in Operation

Check un-usual noise and vibration.

Check for leakage and at the Mechanical Seal.

Check valve seals for leakages

Weekly

Check valves for proper operation and setting

DATE

CWP -P1

CWP -P2

CWP -P3

CWP -P4

CWP -P5
REMARKS

1/……/2021

2/……/2021

3/……/2021
4/……/2021

5/……/2021
6/……/2021

7/……/2021
8/……/2021

9/……/2021

10/……/2021
11/……/2021

12/……/2021
13/……/2021

14/……/2021
15/……/2021

16/……/2021

17/……/2021
18/……/2021

19/……/2021
20/……/2021

21/……/2021
22/……/2021

23/……/2021

24/……/2021
25/……/2021

26/……/2021
27/……/2021

28/……/2021
29/……/2021

30/……/2021

31/……/2021
ENGINEER SIGNFOREMAN SIGN TECHNICIAN SIGN

DAILY & WEEKLY SERVICE PLANNED PREVENTIVE MAINTENANCE REPORT


EQUIPMENT

CONDENSER WATER PUMPS DATE / ………………

EQUIPMENT TAG

CWP-P6 (to) CWP-P9

LOCATION

CUP-2 BUILDING / ZONE-7-3 / LOWER LEVEL

SR.No

Description

Daily

1
Check the operation  of machine
 In Operation Not in Operation

Check un-usual noise and vibration.

Check for leakage and at the Mechanical Seal.

Check valve seals for leakages

Weekly

Check valves for proper operation and setting

DATE

CWP –P6

CWP –P7

CWP –P8

CWP –P9

REMARKS

1/……/2021
2/……/2021

3/……/2021
4/……/2021

5/……/2021

6/……/2021
7/……/2021

8/……/2021
9/……/2021

10/……/2021

11/……/2021
12/……/2021

13/……/2021
14/……/2021

15/……/2021

16/……/2021
17/……/2021

18/……/2021

19/……/2021
20/……/2021

21/……/2021
22/……/2021

23/……/2021

24/……/2021
25/……/2021

26/……/2021
27/……/2021

28/……/2021

29/……/2021
30/……/2021

31/……/2021
ENGINEER SIGN FOREMAN SIGN TECHNICIAN SIGN
DAILY & WEEKLY SERVICE PLANNED PREVENTIVE MAINTENANCE REPORT
EQUIPMENT

:: :

CHILLED WATER CIRCULATION & TES CHILLED WATER SECONDARY PUMP


DATE / ……………..

EQUIPMENT TAG :CHC-P1, CHC-P2& TCHS-P1

LOCATION: CUP-2 BUILDING / ZONE-1 / GROUND LVL.

SR.No

Description

Daily

Check the operation  of machine


 In Operation Not in Operation

Check un-usual noise and vibration.

Check for leakage and at the Mechanical Seal.

4
Check valve seals for leakages

Weekly

Check valves for proper operation and setting

DATE

CHC-P1

CHC-P2

TCHS-P1

REMARKS

1/……./2021

2/……./2021
3/……./2021

4/……./2021

5/……./2021
6/……./2021

7/……./2021

8/……./2021

9/……./2021
10/……./2021

11/……./2021

12/……./2021
13/……./2021

14/……./2021

15/……./2021
16/……./2021

17/……./2021

18/……./2021
19/……./2021

20/……./2021

21/……./2021
22/……./2021

23/……./2021

24/……./2021
25/……./2021

26/……./2021

27/……./2021
28/……./2021

29/……./2021

30/……./2021
31/….…/2021

ENGINEER SIGNFOREMAN SIGNTECHNICIAN SIGN

DAILY & WEEKLY SERVICE PLANNED PREVENTIVE MAINTENANCE REPORT


EQUIPMENT

TES CHILLED WATER PRIMARY PUMPS DATE / …………..

EQUIPMENT TAG

TCHP-P10 &P11

LOCATION

CUP-2 BUILDING / ZONE-7 / LOWER LEVEL

SR.No

Description

Daily

Check the operation  of machine


 In Operation Not in Operation

2
Check un-usual noise and vibration.

Check for leakage and at the Mechanical Seal.

Check valve seals for leakages

Weekly

Check valves for proper operation and setting

DATE

TCHP-P10

TCHP-P11

REMARKS

1/……./2021

2/……./2021
3/……./2021

4/……./2021

5/……./2021

6/……./2021
7/……./2021

8/……./2021

9/……./2021

10/……./2021
11/……./2021

12/……./2021

13/……./2021

14/……./2021
15/……./2021

16/……./2021

17/……./2021

18/……./2021
19/……./2021

20/……./2021

21/……./2021

22/……./2021
23/……./2021

24/……./2021

25/……./2021

26/……./2021
27/……./2021

28/……./2021

29/……./2021

30/……./2021
31/….…/2021

ENGINEER SIGNFOREMAN SIGNTECHNICIAN SIGN