You are on page 1of 4

ABHIJIT DHARA

Civil Engineer Communication Address


[ B. E.] Flat No - K274, Tata Amantra
E-mail : dhara.abhijit@rediffmail.com, abhijit.dhara@shapoorji.com Kalyan Junction, Bhiwandi, Mumbai-Nashik Exressway
 91 8420811559 Sapna Industrial Estate, Saravali, Maharashtra
91 9674283174 Mumbai-Thane - 421 302

Objective : To pursue a Long Carrier with a Reputed Organisation where my Education, Training, Skills &
Experience can be fully Leveraged.

Personality Profile :* High learning curve, hard working & sincere.


* Self-driven and dynamic.
* Ability to deal with people diplomatically.
* Adaptive to situations.

Current Status : Civil Engineer (B. E.) working at M/S Shapoorji Pallonji & Co. Pvt. Ltd.

Qualification : * B. E. 70.98 % (B. E. College, Deemed University), 1997.


* 10+2 Standard 68.40 % (WBCHSE) 1992.
* 10 Standard 73.33 % (WBBSE) 1990.

Computer Explosure : MS Word, MS Excel, MS Project, SAP, ERP Oracle

Professional Experience :
* From 06th June 2016 to Till Date :
Employer > M/S Shapoorji Pallonji & Co. Pvt. Ltd.
Position > Manager - Quantity Survey
Posted at > Greater Noida, U. P.
Project > Design and Construction of Infrastructure Works for Integrated
Industrial Township in Greater Noida in the state of Uttar Pradesh
through EPC Basis
Project Value > Rs. 426.54 Cr.
Client > Delhi-Mumbai Industrial Corridor (DMIC) & Integrated Industrial
Township in Greater Noida Limited (IITGNL)
Responsibility > Joined as a Quantity Survey Head
> Equivalent responsibility of Dy. Project Manager regarding Site Activity.
> Monitering Site Progress, Distribution of works to my Juniors, Folowing the
Progress, Solving the Site related problems etc.
> Independent responsible in Client Billing, Subcontractor Engagement, Work
Order Preparation, Billing etc.
> Checking Sub Contractor's Measurement, Preparation of Bill, Preparation of
Payment Schedule etc. Preparation of PO / PR (Work Order), Entry of
Subcontractor RA Bills etc. in SAP.
> Preparation of Claims to Client for Extra Quantities, Extra Items, Follow Up for
Certification.

Posted at > Mumbai, Water Division RO


Responsibility > Checking Sub Contractor's Measurement, Payment Schedule, Invoices, PO / PR
(Work Order), Entry of Subcontractor RA Bills etc. in SAP for all Project Sites of
Water Division.
> Preparation of CTC, CTD for 5 Project Sites of Punjab & Greater Noida.
> Solving all Commercial related problems for the 5 Project Sites

* From 23rd May 2014 to 31st March 2016 :


Employer > M/S IL&FS Engineering and Construction Company Limited
Position > Sr. Manager (Quantity Survey)
Posted at > New Town, Kolkata.
Project > ANS-3 Construction of Seven (07) Stations including related works
from Sub CBD1 to Titumir in New Garia - Airport Metro Corridor of

Page 1 of 4
from Sub CBD1 to Titumir in New Garia - Airport Metro Corridor of
Kolkata Metro Line for RVNL
Project Value > Rs. 299.77 Cr.
Client > Rail Vikas Nigam Limited (RVNL)
DDC > M/S Tandon Consultants Pvt. Ltd. & Fountainhead JV
Responsibility > Independent responsible in Client Billing, Subcontractor Engagement, Work
Order Preparation, Billing etc.
> Raising Invoce to Client, Certification of Measurement, Preparation of Final Bill,
Submission to RVNL Finance, Preparation of Memo of Payment considering Total
Recoveries applicable time to time, Collecting Cheque etc.
> Checking Sub Contractor's Measurement, Preparation of Bill, Preparation of
Payment Schedule etc.
> Oracle - ERP Entry of Subcontractor Work Order, RA Bills etc.
> Preparation of Claims to Client for Extra Quantities, Extra Items, Follow Up for
Certification.
> Estimation of Detailed Quantities for Pile, Pile cap, Column, Beams, Slabs etc.
and their BBS etc.

* From 15th Dec 2011 to 22nd May 2014 :


Employer > M/S Afcons Infrastructure Ltd.
Position > Sr. Engineer (Quantity Survey)
Posted at > New Town, Kolkata.
Project > ANV-3 : Construction of Viaduct including related works for 5.16 KM
length between Nicco Park to CBD-1, in New Garia - Airport Corridor
of Kolkata Metro Railway Line
Project Value > Rs. 212.55 Cr.
Client > Rail Vikas Nigam Limited (RVNL)
DDC > M/S Stup Consultants Pvt. Ltd.
Responsibility > Raising Invoce to Client for Work Done Bill and Price Adjustment Bill,
Certification of Measurement, Preparation of Final Bill, Submission to RVNL
Finance, Preparation of Memo of Payment considering Total Recoveries
applicable time to time, Collecting Cheque etc. and entry into SAP
> Checking Sub Contractor's Measurement, Preparation of Bill, Preparation of
Payment Schedule etc. and input in SAP for Subcontractor's Work Order and
Bills.
> Preparation of Contractor's Performance Evaluation every month.
> Preparation of Bill due to change in Legislation.
> Preparation of Claims to Client for Extra Quantities, Extra Items, Follow Up for
Certification.
> Estimation of Detailed Quantities for Pile, Pile cap, Pier, Pier Head, Segment and
their BBS etc.

* From 3rd Apr 2006 to 12th Dec 2011 :


Employer > M/S Hindustan Construction Co. Ltd.
Position > Quantity Survey Engineer
Posted at > Warangal, A. P.
Project > Devadulla Lift Irrigation Scheme Project (DLIS) - Phase - I & II
Project Value > Phase I - 844 Cr., Phase II - 1887 Cr.
Client > Irrigation & Common Area Development Department (I & CADD),
Government of A. P.
Project Partner > Phase I - With KBL(HCC 85%), Phase II - With NCC (HCC 51%).
Responsibility > Raising Invoce to Client, Certification of Measurement, Preparation of Final Bill,
Submission to Pay & Accounts, Preparation of Memo of Payment considering
Total Recoveries applicable time to time, Collecting Cheque etc.
> Checking Sub Contractor's Measurement, Preparation of Bill, Preparation of
Payment Schedule etc.
> Preparation of Contractor's Performance Evaluation every month.
> Estimation of Detailed Quantities for Pump Houses, Tanks, Gravity Canal, One
Way Suge Tank and Preparation of Percentage Break Up etc.
> Preparation of Claims to Client for Extra Quantities, Extra Items, Follow Up for
Certification.

Page 2 of 4
Certification.

* From 16th Aug 2004 to 31st Mar 2006 :


Employer > M/S Stup Consultants Pvt. Ltd.
Position > Construction Supervision Engineer.
Posted at > Kolkata.
Project > Kolkata Environmental Improvement Project (KEIP).
An ADB Funded Project.
Project Value > 1800 Crore.
Client > Kolkata Municipal Corporation (KMC) and Irrigation & Waterways
Department, Govt. of West Bengal.
Responsibility > Supervised Canal Bridge No. 4 (Near Anandapur), Canal Bridge No. 5 (Near
Choubaga), Canal Bridge No. 10 (Near Garfa, Jadavpur), Caanal Bridge No. 23
(Near Baghajatin Railway Stn./Hiland Park) & Canal Bridge No. 15 (Near Haltu) -
600 mm dia Bore Piles, Pile Caps, Abuttment, Piers, Abuttment/Pier Caps, RCC 'I'
Girders, Deck Slabs, Crash Barrier.
Supervising Sewarage & Drainage work in LOT 2 of Package I.

* From 26th Aug 2002 to 14th Aug 2004 :


Employer > M/S Gamuda-WCT (India) Pvt. Ltd.
Position > Site Engineer.
Posted at > Sigur, Hooghly & Shaktigarh, Burdwan, W. B. for Palsit to Dankuni (B.O.T.
Project)

Project > Strengthening & Widening of 4/6 Lane of Durgapur Expressway (NH
2) from Palsit to Dankuni (B.O.T. Project), and National Highway 2
from Panagarh to Palsit (B.O.T. Project).
Project Value > Rs. 600 Crore.
Client > National Highway Authority of India.
Consultant > Lea Associates of South Asia (LASA)
I. E. > Dorsch Consultant India (Pvt.) Ltd.

Responsibility > As a Site Engineer supervised ROB, (Singur, WB) 1.0 m dia Bore Piles, Pile Caps,
Abuttment, Piers, Abuttment/Pier Caps, PSC 'I' Girders, Deck Slabs.
Supervised Flyover (635/2), Canal Bridges (621/1,624/2), Minor Bridges (625/3,
642/1, 645/1) Underpass (622/2, 617/2), Pipe Culverts (12 nos.), Box Culverts
(16 nos.) with Service Road Structures. Project supervise & Planning day to day
activities at site & solving site problems.
Supervising Palsit Interchange Flyover Piers, PSC 'I' Girders, Deck Slabs &
Voided Deck Slabs.
Supervising Shaktigarh ROB Pile Caps, Piers, Abuttments, Abuttment/Pier Caps,
PSC 'I' Girders.
Supervise as per M.O.R.T.H. Specification.

* From 12th Nov 1997 to 28th Feb 1999 :


Employer > M/S Simplex Concrete Piles (India) Ltd.
Position > Student Engineer.
Project > Construction of Haldia Petrochemical Plant.
Client > Haldia Petrochemicals Ltd.
Responsibility > Supervision in Construction of Driven Cast-in-situ Piles, Pile Caps.

Project > Mitshubishi Chemical Corporation PTA Plant.


Client > Mitshubishi Chemical Corporation (I) Pvt. Ltd.
Responsibility > Supervision in Construction of Driven Piles, Pile Caps, Machine Foundation, Civil
Structures, Quality Control.

Vocational Training : Under Civcon Construction Pvt. Ltd.

Page 3 of 4
Personal Details :

Name : ABHIJIT DHARA.


Father's Name : Late Dipak Kumar Dhara.
Date of Birth : 15th July 1974
Sex : Male
Marital Status : Married
Nationality : Indian

Permanent Address : Flat No - 4A, Tower - 1, Sharnam


54/A, Rajarhat Road
Kaikhali Chiria More
Kolkata - 700 052, West Bengal
Ph. No.  : 91 8420811559
E-mail : : dhara.abhijit@rediffmail.com

Language Known :
* Spoken > Bengali, English, Hindi.
* Written > Bengali, English.

Hobbies & Interests : Listening Music, Painting, Playing Cricket.

Present Salary : Rs. 18,04,324/- pa and Other Perks

Expected Salary : Negotiable.

Time Required to Join : 30 days aftter confirmation.

Abhijit Dhara

Page 4 of 4

You might also like