Professional Documents
Culture Documents
Objective : To pursue a Long Carrier with a Reputed Organisation where my Education, Training, Skills &
Experience can be fully Leveraged.
Current Status : Civil Engineer (B. E.) working at M/S Shapoorji Pallonji & Co. Pvt. Ltd.
Professional Experience :
* From 06th June 2016 to Till Date :
Employer > M/S Shapoorji Pallonji & Co. Pvt. Ltd.
Position > Manager - Quantity Survey
Posted at > Greater Noida, U. P.
Project > Design and Construction of Infrastructure Works for Integrated
Industrial Township in Greater Noida in the state of Uttar Pradesh
through EPC Basis
Project Value > Rs. 426.54 Cr.
Client > Delhi-Mumbai Industrial Corridor (DMIC) & Integrated Industrial
Township in Greater Noida Limited (IITGNL)
Responsibility > Joined as a Quantity Survey Head
> Equivalent responsibility of Dy. Project Manager regarding Site Activity.
> Monitering Site Progress, Distribution of works to my Juniors, Folowing the
Progress, Solving the Site related problems etc.
> Independent responsible in Client Billing, Subcontractor Engagement, Work
Order Preparation, Billing etc.
> Checking Sub Contractor's Measurement, Preparation of Bill, Preparation of
Payment Schedule etc. Preparation of PO / PR (Work Order), Entry of
Subcontractor RA Bills etc. in SAP.
> Preparation of Claims to Client for Extra Quantities, Extra Items, Follow Up for
Certification.
Page 1 of 4
from Sub CBD1 to Titumir in New Garia - Airport Metro Corridor of
Kolkata Metro Line for RVNL
Project Value > Rs. 299.77 Cr.
Client > Rail Vikas Nigam Limited (RVNL)
DDC > M/S Tandon Consultants Pvt. Ltd. & Fountainhead JV
Responsibility > Independent responsible in Client Billing, Subcontractor Engagement, Work
Order Preparation, Billing etc.
> Raising Invoce to Client, Certification of Measurement, Preparation of Final Bill,
Submission to RVNL Finance, Preparation of Memo of Payment considering Total
Recoveries applicable time to time, Collecting Cheque etc.
> Checking Sub Contractor's Measurement, Preparation of Bill, Preparation of
Payment Schedule etc.
> Oracle - ERP Entry of Subcontractor Work Order, RA Bills etc.
> Preparation of Claims to Client for Extra Quantities, Extra Items, Follow Up for
Certification.
> Estimation of Detailed Quantities for Pile, Pile cap, Column, Beams, Slabs etc.
and their BBS etc.
Page 2 of 4
Certification.
Project > Strengthening & Widening of 4/6 Lane of Durgapur Expressway (NH
2) from Palsit to Dankuni (B.O.T. Project), and National Highway 2
from Panagarh to Palsit (B.O.T. Project).
Project Value > Rs. 600 Crore.
Client > National Highway Authority of India.
Consultant > Lea Associates of South Asia (LASA)
I. E. > Dorsch Consultant India (Pvt.) Ltd.
Responsibility > As a Site Engineer supervised ROB, (Singur, WB) 1.0 m dia Bore Piles, Pile Caps,
Abuttment, Piers, Abuttment/Pier Caps, PSC 'I' Girders, Deck Slabs.
Supervised Flyover (635/2), Canal Bridges (621/1,624/2), Minor Bridges (625/3,
642/1, 645/1) Underpass (622/2, 617/2), Pipe Culverts (12 nos.), Box Culverts
(16 nos.) with Service Road Structures. Project supervise & Planning day to day
activities at site & solving site problems.
Supervising Palsit Interchange Flyover Piers, PSC 'I' Girders, Deck Slabs &
Voided Deck Slabs.
Supervising Shaktigarh ROB Pile Caps, Piers, Abuttments, Abuttment/Pier Caps,
PSC 'I' Girders.
Supervise as per M.O.R.T.H. Specification.
Page 3 of 4
Personal Details :
Language Known :
* Spoken > Bengali, English, Hindi.
* Written > Bengali, English.
Abhijit Dhara
Page 4 of 4