SESSION LEARNING OBJECTIVE
2
I. Definition of Terms
V. Contract Implementation
Considerations
Competitive Bidding
(Sec. 10, IRR of R.A. No. 9184)
Exception
2 3
Assess Procure
🗹 Plans/Drawings
🗹 Bill of Quantities
Plans/Drawings
Detailed Engineering:
❑ Detailed engineering investigations, surveys and designs
❑ In case of projects with pending acquisition of right-of-way
site or location, the procurement process may commence,
but no award of contract shall be made until:
an authority or permit to enter is issued by the property
owner; or
a notarized deed of sale or deed of donation is executed in
favor of the government; or
a writ of possession is issued by a court of competent
jurisdiction
Exemption: In case of Design and Build Scheme
Preliminary examination
Eligibility checking
of bids
Shortlisting
Bid Evaluation
(For Consulting Services)
22
2 Engaging private procurement agents to directly
undertake the procurement for them, subject to the
guidelines to be issued by the GPPB
Sec. 7.3.3(b), IRR, No. RA 9184
Objective
To hasten the process of securing physical signatures of
procurement officers who may not always be available to affix
their signatures & to avoid pending of procurement documents
due to physical absence of the signatories
Pre-
Advertisement Pre-Bid
Procurement
Conference
Conference
Opening of
Opening of 2nd
Submission of 1st Envelope (Eligibility
Envelope (Financial
Bids & Technical
Proposal)
Requirements)
Purpose
Determine the readiness of the procurement, such as:
🗹 Description and scope of the contract
🗹 Approved Budget for the Contract (ABC)
🗹 Contract duration
🗹 Whether project is in accordance with the PPMP and APP
🗹 Availability of appropriations
🗹 Completeness and correctness of the Bidding Documents
🗹 Completion of the detailed engineering according to the prescribed
standards in the case of Infrastructure Projects
🗹 Availability of right-of-way site or location, and the possession of affected
properties
🗹 Review and adopt the procurement schedule
🗹 Reiterate and emphasize the importance of confidentiality
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
PRE-PROCUREMENT CONFERENCE
Timeline Condition 👪 Participants
❑ Conducted ❑ Mandatory for ❑ BAC
prior to projects with ❑ BAC
advertisement ABC above Secretariat
or posting of PhP5,000,000. ❑ TWG
the Invitation to 00 ❑ Consultants for
Bid the subject
procurement
project, if any
❑ End-user unit
❑ Other Officials
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
REFERENCE TO BRAND NAMES
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
GPPB RESOLUTION NO. 02-2018
Purpose
Advertisement Posting
At least once in one (1) Posted continuously for 7
newspaper of general calendar days for projects with
nationwide circulation, ABC of equal to or less than
which has been regularly PhP15,000,000.00, in the
published for at least two following:
PhilGEPS;
(2) years before
Website of the PE, if any;
advertisement date for
Website of IFI, if applicable;
projects with ABC of and
more than At any conspicuous place in
PhP15,000,000.00 the premises
Post ofAwthe PE.
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
ADVERTISEMENT/POSTING OF THE INVITATION TO BID
15M and
Medium Above 15M
Below
• Newspaper of General
Nationwide Circulation ✔ 🗶
• PhilGEPS website ✔ ✔
• PE’s website, if available ✔ ✔
• Conspicuous Place ✔ ✔
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
ADVERTISEMENT/POSTING OF THE INVITATION TO BID
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
PRE-BID CONFERENCE
Timeline Condition
❑ Held at least 12 cd before deadline
❑ Mandatory for
for bid submission but not earlier
projects with
than 7 cd from the PhilGEPS
ABC of
posting of the IB or Bidding
Documents PhP1,000,000.
❑ May be held at least 30 cd before 00 or more
deadline for bid submission,
considering the following:
Method, nature, and complexity of
contract
International participation is more
advantageous
Advert Pre- Receip
Post Aw
Pre- - ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
PRE-BID CONFERENCE
▪ For contracts less than PhP1M, pre-bid conferences may be
conducted at the discretion of the BAC.
With the removal of this option in the 2016 IRR of RA 9184, all
prospective bidders are now given the opportunity to attend
the pre-bid conference and raise questions or clarifications
regardless whether they purchased the bidding documents
or not.
NPM No. 060-2017
Purpose
Timeline Conditions
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
RE-SCHEDULING OF BID OPENING
Opening of Opening of
1st Envelope Ranking
2nd Envelope
Checking presence
▪ Only 2nd Envelopes of bidders
or absence of Only bidders
whose 1st Envelope was rated
submitted whose both 1st
“Passed” will be opened
documents against a and 2nd envelopes
▪ Bids with missing, incomplete
checklist of required were rated
or patently insufficient, and/or
documents using a “Passed” will be
bid price exceeding the ABC
non-discretionary ranked
shall be rated “Failed”
“pass/fail” criterion
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
Should PE immediately return the
second bid envelope unopened to the
bidder if its bid has been declared failed
for neglecting to submit all required
documents in its first bid envelope?
The BAC should return the bid enveloped for a bidder whose bid has
been finally declared failed despite the deletion of the sentence "[i]n
case one or more of the above required documents in the first
envelope of a particular bid is missing..., the BAC shall rate the bid
concerned as "failed" and immediately return to the bidder
concerned its second bid envelope unopened" in Section 30.1 of the
IRR.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
ELIGIBILITY REQUIREMENTS
1. Registration Certificate;
2. Mayor’s/Business Permit or its Equivalent Document;
3. Tax Clearance;
4. Philippine Contractors Accreditation Board (PCAB) license and
registration; and
5. Audited Financial Statements (AFS).
(Sec. 8.5.2, 2016 IRR of RA No. 9184)
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
ELIGIBILITY REQUIREMENTS
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
ELIGIBILITY REQUIREMENTS
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
CLASS “A” ELIGIBILITY
DOCUMENTS
UNDER
Legal
SECTION 23.1(a)
Technical Financial
🗹 DTI/SEC/CDA 🗹 Statement of all 🗹 AFS
Class “A”
MAYOR’S/BUSINESS PERMIT
❑ The Mayor’s/Business Permit allows an entity to legally perform
the requirements and obligations of the project and the resultant
contract.
PCAB LICENSE
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
GPPB RESOLUTION NO. 10-2019
Background
Section 23.1(a)(vi) of the 2016 Revised IRR of RA No. 9184 requires
submission of PCAB License or Special PCAB License in case of Joint
Ventures as part of the eligibility requirements
Objective
Address volume of queries received by GPPB-TSO clarifying the
acceptability of Temporary PCAB License as an eligibility requirement
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
GPPB RESOLUTION NO. 10-2019
PCAB License
License issued by the Philippine Contractors Accreditation Board
allowing an entity to engage in business as a contractor
Turn-around time for its issuance is twenty (20) calendar days
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
GPPB RESOLUTION NO. 10-2019
General Consideration
Bidders shall submit a valid PCAB License for the following procurement projects:
TAX CLEARANCE
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
ELIGIBILITY REQUIREMENTS (CLASS “A”)
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
Can a new business avail of the
track record of an existing
enterprise, owned by the one and
the same person?
[T]he track record gained by the owner of a sole proprietorship
may be used by another enterprise of the same nature
established and registered by the same owner. The rationale
for this is that the business experience gained redounds, not to
the sole proprietorships that has no juridical personality, but to
the owner of the business itself.
xxx
[I]t is our considered view that a newly registered sole
proprietorship may use the experience of another sole
proprietorship with the same business owned by the same
individual. Incidentally, if one of the sole proprietorship is
blacklisted, such blacklisting will extend to all sole proprietorships
owned by the same individual.
NPM No. 037-2011
Joint
🗹 Valid Joint Venture Agreement
Objective
The authentication of documents under the Apostille Convention shortens the
process for authenticating documents of foreign bidders who intent to participate
in government procurement in the Philippines.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
ELIGIBILITY REQUIREMENTS FOR
FOREIGN BIDDERS
New Provision
❑ However, for Contracting Parties to the Apostille Convention, the
documents shall be authenticated through an apostille by the
Competent Authority, except for countries identified by the
Department of Foreign Affairs (DFA) that will still require legalization
(red ribbon) by the relevant Embassy or Consulate.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
TECHNICAL REQUIREMENTS
BID SECURITY
Purpose Conditions
To guarantee that the ❑ Only 1 form of Bid Security is required to be
successful bidder submitted
shall, within ten (10) ❑ Bidders have the option to choose their
calendar days from preferred form of bid security
receipt of the notice of ❑ Bank-issued securities must be issued by a
award, enter into universal or commercial bank
However, in LGUs biddings, securities may be
contract with the PE issued by banks certified by BSP as
and furnish the authorized to issue said instruments
performance security ❑ Surety Bonds must be accompanied by
required certification from Insurance Commission
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
TECHNICAL REQUIREMENTS
BID SECURITY
a) Cash or cashier’s/manager’s
check
2% of ABC
b) Bank guarantee/draft or
Irrevocable LC
c) Surety bond callable upon
5% of ABC
demand
d) Bid Securing Declaration No percentage required
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
TECHNICAL REQUIREMENTS
PROJECT REQUIREMENTS
Must contain the following:
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
OPENING OF 2ND ENVELOPE
CONTENTS
1. Bill of Quantities
2. Detailed Estimate
3. Cash Flow by quarter
4. Other requirements
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
Can PEs impose additional eligibility
documents other than those required
under Sections 23.1, 24.1, and 25.1 of
the revised IRR of RA No. 9184?
PEs are proscribed from requiring additional requirements. The list
of minimum eligibility requirements under the revised IRR of RA No.
9184 has been streamlined/simplified, such that only those requirements
enumerated in Sections 23.1, 24.1, and 25.1 of the IRR are necessary
for purposes of determining bidders' eligibility.
-xxx-
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
DETAILED EVALUATION OF BIDS
CEILING FOR BID PRICES
❑ The estimated budget for the cost components of an
infrastructure project is used by PEs in determining the
appropriate and reasonable amount of the ABC.
❑ On the other hand, the ABC, as the upper limit or ceiling for
bid prices, is used by the bidder in submitting a responsive bid.
Accordingly, bids that are within the ABC, even if the price
offered for a particular component exceeds the identified
estimated cost for such component, can be considered for
award if proven to be the lowest calculated and responsive bid
among all other bids.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
DETAILED EVALUATION OF BIDS
CEILING FOR BID PRICES
For Foreign-funded Procurement, the ABC shall be applied as
ceiling provided that:
❑ Bidding documents are obtainable free of charge on a freely
accessible website;
❑ The procuring entity has procedures in place- that ABC is
based on recent estimates made by the Engineer or the
responsible unit of the procuring entity and based on adequate
detailed engineering and reflect the quality, supervision and
risk and inflationary factors, as well as the prevailing market
price;
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
DETAILED EVALUATION OF BIDS
CEILING FOR BID PRICES
For Foreign-funded Procurement, the ABC shall be applied as
ceiling provided that (Cont.):
❑ The PE has trained estimators on estimating prices and
analyzing bid variance;
❑ The agency has established a system to monitor and report
bid prices relative to ABC and Engineers estimate.
❑ The PE has established monitoring and evaluation system for
contract implementation to provide feedback on actual total
costs of works.
❑ Conditions may be waived
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
DETAILED EVALUATION OF BIDS
NO CONTACT RULE
Prohibition on communication w/ bidders from bid
evaluation until award of contract
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
DETAILED EVALUATION OF BIDS
In case of discrepancies:
VS
Unit Price for the Item
Total Price Per Item
x Quantity
TECHNICAL REQUIREMENTS
1. The bidder and its key personnel‘s competence and experience
2. Verification of availability and commitment, and/or inspection and
testing for the required capacities and operating conditions, of
equipment units to be owned/leased/under purchase by the bidder
for use in the contract under bidding
3. Ascertainment of the authenticity and sufficiency of the bid
security as to type, amount, form wording and
Post
validity
Aw
period
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
FINANCIAL REQUIREMENTS
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
The BAC shall check performance of the bidders in its ongoing
contracts:
Negative slippage of at least 15% in any one project or a negative
slippage of at least 10% in each of 2 or more contracts;
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
GPPB RESOLUTION NO. 25-2019
Amendment
Section 37.1.4 (a)(iii) of the IRR of RA 9184
Within ten (10) calendar days from receipt by the winning bidder of the
Notice of Award, the following documents shall be submitted before the
contract may be awarded:
i. xxx
ii. xxx
iii. The SEC Certificate of Registration of the foreign
corporation/consulting firm and/or the authority or license from the
appropriate government agency or professional regulatory body of the
foreign professionals engaging in the practice of regulated professions
and allied professions, where applicable.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
1. BAC;
2. TWG;
3. BAC Secretariat; and
4. The contractor, ranked starting from bidder with the
LCB.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
2
The BAC/TWG inquires about the bidder’s performance in
relation with other contracts/transactions as indicated in
its eligibility statement (statements of all ongoing or
completed contracts).
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
What happens if a bidder is found to have committed an
act that constitutes fraud or misrepresentation or to have
colluded with others for the purpose of influencing the
outcome of the Bidding?
❑ Disqualification,
❑ Forfeiture of the Bid Security,
❑ Upon conviction, imprisonment of not less than six (6) and one (1)
day and not more than fifteen (15) years, (Sec. 65.2, 2016 IRR
of RA 9184); and
❑ Imposition of administrative penalties of suspension for one (1)
year from participation in government procurement for the first
offense, and suspension for two (2) years for the second offense.
Pre-
(Sec. 69.1, 2016
Advert Pre- IRR of RA 9184)
Receip
Post
-
Aw
ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
What happens if the bidder with the LCB fails Post-
Qualification?
❑ All bidders that have initially responded to the IB in the first bidding
shall be allowed to submit new bids. (Sec. 35.4, 2016 IRR of RA
9184)
❑ It may be necessary to reduce the scope of the project.
❑ Should a second failure of bidding occur and the Procuring Entity
so decides to revise the ABC, the Procuring Entity should conduct
another public bidding with re-advertisement and/or posting.
❑ Alternatively, the PE may enter into a negotiated procurement.
(Sec. 35.5, 2016 IRR of RA 9184)
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
DPWH Secretary Datumanong, et al. Vs. Malaga
G.R. No. 204906, June 5, 2017
Facts:
❑ Respondent Malaga, a private contractor and the lowest bidder for two
concreting projects of the DPWH, particularly:
a) Mandurriao-San Miguel Road, Bgry. Hibao-an Section in Iloilo City; and
b) Manduriao-San Miguel Road, Guzman-Jesena Section in Iloilo City.
❑ After publication but before opening of the bids, the road condition of the
Mandurriao-San Miguel Road in Brgy. Hibao-an was severely deteriorated
because of typhoon and monsoon season. The DPWH Region VI Director
indorsed to the DPWH Secretary the request of the District Engineer that the
said road be implemented by administration.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
DPWH Secretary Datumanong, et al. Vs. Malaga
G.R. No. 204906, June 5, 2017
Facts (Cont.):
❑ Since no response was forthcoming from the DPWH Secretary,
DPWH RO VI proceeded to open the bids as scheduled
❑ Thereafter, the Secretary approved the request, but only with
respect to the Mandurriao-San Miguel Road, Barangay Hibao-an
Section, which will be undertaken through administration. The BAC
conducted the post-qualification of respondent’s firm, but only for the
Mandurriao-San Miguel Road, Guzman-Jesena Section Project. The
respondent was declared post-qualified for the project, and the same
was awarded to her.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
Facts (Cont.):
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
DPWH Secretary Datumanong, et al. Vs. Malaga
G.R. No. 204906, June 5, 2017
Issue:
❑ Whether or not the CA erred in granting the respondents appeal
because respondent failed to allege any actionable wrong that would
entitle her to the damages claimed.
Ruling:
❑ Before a government project is awarded to the lowest calculate bidder,
his bid must undergo a mandatory post-qualification procedure whereby
the “Procuring Entity verifies, validates, and ascertain all statements
made and documents submitted by the bidder with the lowest
calculated or highest rated bid using a non-discretionary criteria as
Pre-
stated in the bidding
Advert Pre- documents.”
Receip
Post Aw
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
DPWH Secretary Datumanong, et al. Vs. Malaga
G.R. No. 204906, June 5, 2017
Ruling (Cont.):
❑ Since respondent’s lowest calculated bid for the subject
project did not undergo the required post-qualification
process, then she cannot claim that the project was awarded
to her. And if the project was never awarded to her, then she
has no right to undertake the same. If she has no right to the
project, then she cannot demand indemnity for lost profits or
actual damages suffered in the event of failure to carry out the
same. Without formal award of the project in her favor, such
demand
Advert
would
Pre-
be premature
Receip
Post Aw
Pre- - ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
POST-QUALIFICATION
What happens if the bidder being considered for
award does not accept the award?
❑ Refusal to accept an award, without just cause or for the
purpose of forcing the PE to award the contract to another
bidder, if proven, is meted with a penalty of imprisonment of
not less than six (6) years and one (1) day by not more than
fifteen (15) years. (Sec. 65.3.4, 2016 IRR of RA 9184)
❑ Additional penalties of suspension for one (1) year from
participation in government procurement for the first
offense, and suspension for two (2) years for the second
offense shall also be imposed on the bidder. (Sec. 69.1, 2016
IRR of RA 9184)
Advert Pre- Receip
Post Aw
Pre- - ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
CONTRACT SIGNING
❑ The PE shall issue the NTP together with a copy/ies of the approved
contract to the successful bidder within 7 calendar days from the
date of approval of the contract by the appropriate government
approving authority.
❑ All notices called for by the terms of the contract shall be effective
only at the time of receipt thereof by the successful bidder.
❑ The BAC Secretariat shall post the NTP and the approved contract
in the PhilGEPS and PE’s websites within 15 calendar days from
Pre-
the issuance
Advert of the
Pre- NTP. Receip
Post Aw
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
*For biddings conducted by LGUs, these may be issued by other banks certified by
the BSP as authorized to issue such financial instrument
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Facts:
❑ Plaintiff joint venture was awarded the construction of Pier 2
and the rock causeway for the port of La Union, after a public
bidding conducted by the defendant PPA. Adjacent to Pier 2 is
an area of P4,280 square meters intended for the reclamation
project as part of the overall port development plan.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Sargasso Construction & Development Corp. v. Philippine
Ports Authority
G.R. No. 170530, July 5, 2010
Facts (Cont.):
❑ Plaintiff offered to undertake the reclamation project, as an extra
work to its existing construction of R.C. Pier 2 and Rock Causeway
for a price of P36,294,857.03. Defendant replied to plaintiff in a letter
as follows:
"Your proposal to undertake the project at a total cost of
P36,294,857.03 is not acceptable to PPA. If you can reduce your
offer to P30,794,230.89 we may consider favorably award of the
project in your favor, subject to the approval of higher
Pre-
authority.”
Advert Pre- Receip
Post
-
Aw
ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Sargasso Construction & Development Corp. v. Philippine
Ports Authority
G.R. No. 170530, July 5, 2010
Facts (Cont.):
❑ Subsequently, a Notice of Award (NOA) signed by PPA General
Manager was sent to plaintiff for the Reclamation Contract and
instructing it to "enter into and execute the contract agreement with
this Office." The award of the negotiated contract as supplemental
project in favor of plaintiff was intended "to save on the
mobilization/demobilization costs and some items as provided for in
the original contract." Hence, the contract proposal for the
reclamation project was presented to the PPA Board of Directors.
However, the Board did not approve the same. Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Sargasso Construction & Development Corp. v. Philippine
Ports Authority
G.R. No. 170530, July 5, 2010
Facts (Cont.):
❑ Plaintiff filed a complaint for PPA’s unjustified refusal to comply with
its undertaking, which delays the implementation of the NOA. PPA
contended that the alleged NOA has already been properly revoked
when the Supplemental Agreement which should have implemented
the award was denied approval by the Board of Directors. The Board
of Directors denied approval of the Supplemental Agreement for lack
of legal basis to award the supplemental contract through
negotiation.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Sargasso Construction & Development Corp. v. Philippine
Ports Authority
G.R. No. 170530, July 5, 2010
Facts (Cont.):
❑ Petitioner contends that the existence of "NOA of Contract and Contractor’s
Conforme thereto," resulting from its negotiation with respondent, proves that a
contract has already been perfected, and that the other documents enumerated
under the amended IRR of P.D. 1594 are mere physical representations of the
parties’ meeting of the minds; that the "Approval of Award by Approving
Authority" is only a "supporting document," and not an evidence of perfection of
contract, and which merely "facilitates the approval of the contract;" that PPA is
bound by the acts of its general manager in issuing the Notice of Award under
the doctrine of apparent authority; and that the doctrine of estoppel, being an
equitable doctrine, cannot be invoked to perpetuate an injustice against
petitioner.
Advert Pre- Receip
Post Aw
Pre- - ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Issue:
❑ Whether or not a contract has been perfected for the
reclamation project between the parties which, in turn,
depends on whether or not the general manager of PPA
is vested with authority to enter into a contract for and on
behalf of PPA.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Sargasso Construction & Development Corp. v. Philippine
Ports Authority
G.R. No. 170530, July 5, 2010
Ruling:
❑ A government or public contract has been defined as a
contract entered into by state officers acting on behalf of the
state, and in which the entire people of the state are directly
interested. It relates wholly to matter of public concern, and
affects private rights only so far as the statute confers such
rights when its provisions are carried out by the officer to
whom it is confided to perform.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Sargasso Construction & Development Corp. v. Philippine
Ports Authority
G.R. No. 170530, July 5, 2010
Ruling (Cont.):
❑ A government contract is essentially similar to a private
contract contemplated under the Civil Code. The legal
requisites are the same; Otherwise, there is no government
contract to speak of.
❑ On the matter of entering into negotiated contracts by GOCC,
the provisions of existing laws are clear in requiring the
governing board’s approval thereof.
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Sargasso Construction & Development Corp. v. Philippine
Ports Authority
G.R. No. 170530, July 5, 2010
Ruling (Cont.):
❑ The authority to negotiate contract for projects under the exceptional cases
shall be subject to prior approval by heads of agencies within their
limits of approving authority
❑ The contracting officer functions as agent of the government for the purpose
of making the contract. There arise a principal-agent relationship between
the Government and the contracting official. The latter possesses
only actual agency authority. This is to say that his contracting power exists,
where it exists at all, only because and by virtue of a law, or by authority of
law, creating and conferring it. And it is well settled that he may make only
such contractsPre-
Advert
as he is so authorized to make.
Receip
Post Aw
Pre- - ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Sargasso Construction & Development Corp. v. Philippine
Ports Authority
G.R. No. 170530, July 5, 2010
Ruling (Cont.):
❑ The acts of such agents in entering into agreements or contracts
beyond the scope of their actual authority do not bind or obligate the
Government. The moment this happens, the principal-agent
relationship between the Government and the contracting officer
ceases to exist
❑ All signatories in a contract should be clothed with authority to
bind the parties they represent. Unless respondent’s Board validly
authorizes its general manager, the latter cannot bind respondent
PPAAdvert
to a contract.
Pre- Receip
Post Aw
Pre- - ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Sargasso Construction & Development Corp. v. Philippine
Ports Authority
G.R. No. 170530, July 5, 2010
Ruling (Cont.):
❑ Petitioner failed to present competent evidence to prove that the
respondent’s general manager possessed such actual authority
delegated either by the Board of Directors, or by statutory
provision. Without such actual authority, there could be no real consent,
much less a perfected contract, to speak of.
❑ Contracts to which the government is a party are generally subject to
the same laws and regulations which govern the validity and sufficiency
of contracts between private individuals. A government contract is
perfected only upon approval by a competent authority, where
Pre- such approvalPre-
Advert is required.
Receip
Post
-
Aw
ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
IN EMPHASIS, THE STEPS IN AWARDING OF A
CONTRACT:
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
IN EMPHASIS, THE STEPS IN AWARDING OF A
CONTRACT:
9 The BAC, through the Secretariat shall post within three (3)
calendar days from its issuance, the NOA in the PHILGEPS,
the website of the PE, if any, and any conspicuous place in the
premises
Advert
of the
Pre-
PE. Receip Post Aw
Pre- - ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
11 The winning
requirements:
bidder
14 Pre-
Procureme
The procurement unit/office transmits the contract documents
to the appropriate signing authority for signature
Advert
isemen
t and
Pre-
Bid
Conf
Receip
t and
Openin
Bid
Evalua
Post
-
Qua
Aw
ard
of
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
IN EMPHASIS, THE STEPS IN AWARDING OF A
CONTRACT:
Post Aw
Pre- Advert Pre- Receip
- ard
Procureme isemen Bid t and Bid
Qua of
t and Conf Openin Evalua
nt Postin eren g of tion
lific Con
Conference g ce Bids
atio trac
n t
Government Procurement Policy Board – Technical Support Office
AWARD OF CONTRACT
No bids received
PROCUREMENT PROCESS
From Opening of Bids to Award of Contract shall
NOT EXCEED 3 MONTHS
LEGAL BASIS
Sec. 17.6, 2016 IRR of RA 9184
❑ No bidding shall be made unless Detailed Engineering is
done - exception for Design-Build schemes
DEFINITION
Design-Build (DB)
ADVANTAGES
1. Single
❑ As both design and construction are with the contractor, there
is a single point of responsibility for quality, cost and schedule
adherence. Precludes buck-passing/finger-pointing.
2. Quality
❑ The larger responsibility in DB is motivation for innovation and
high quality of facility to be provided. Once PE’s performance
reqts are defined, designer-builder is responsible for
producing results. Designer-builder warrants to PE that design
docs are complete and free from error. (In traditional scheme,
PE warrants to contractor that design docs are complete and
free from error – thus, restrictive contract language.)
ADVANTAGES
3. Time Savings
❑ Because design and construction overlap, total design
and construction time is significantly reduced.
Translates to cost savings and early use of facility.
ADVANTAGES
5. Firm Costs
❑ Since contractor responsible for design is
simultaneously estimating construction costs, and can
accurately conceptualize the completed project at early
stage, and is required to submit fixed lump sum bid
prices, guaranteed const. costs are known sooner.
Precludes variation orders and cost overruns due to
faulty design.
DISADVANTAGES
1) Contractors are given too much discretion in determining the
project cost and there is difficulty in predicting its final cost until
actual start of construction. This can, however, be addressed
by prescribing that the bid/contract price should not exceed
ABC and that the contract price is a fixed lump sum amount.
1) Considering that integration of design and construction of the
project is dependent on the contractor, there may be cases
when the end-result may not be exactly in accordance with what
PE has required. These cases can, however be avoided if PE
adequately defines the output or performance
specs/parameters, and carefully reviews the submitted designs
vs. its performance specs/parameters.
APPLICABILITY
APPLICABILITY
ELIGIBILITY REQUIREMENTS
❑ Compliance with Sections 23 and 24 of IRR of RA 9184.
BID EVALUATION
First-Step Procedure:
❑ Review of preliminary conceptual designs and track record
submitted by contractor as indicated in BDs using non-
discretionary “pass/fail” criteria:
Adherence of preliminary design plans to the required
performance specifications and parameters and degree of
details.
Approach/methodology for DE, design and construction,
with emphasis on clarity, feasibility, innovativeness and
comprehensiveness of plan approach, and quality of
interpretation of project problems, risks, and suggested
solutions.
BID EVALUATION
First-Step Procedure:
❑ Review of preliminary conceptual designs and track record
submitted by contractor as indicated in BDs using non-
discretionary “pass/fail” criteria (Cont.):
Quality of personnel to be assigned to the project, which
covers suitability of key staff to perform assignments and
gen. qualifications and competence including education
and training of the key staff.
BID EVALUATION
Second-Step Procedure:
BID EVALUATION
Second-Step Procedure (Cont.):
❑ The bid with the lowest total calculated bid price shall be
identified as the LCB.
❑ The HoPE shall award the contract per Sec. 37 of the 2016
Revised IRR of RA 9184 .
CONTRACT IMPLEMENTATION
CONTRACT IMPLEMENTATION
❑ Contractor shall submit detailed program of work within 14
calendar days of NTP
Order and timing of each stage
Periods for review of outputs
Timing for inspections and tests
Design and construction methods
Names of personnel for each stage
List of equipment
Quality control system
CONTRACT IMPLEMENTATION
ADVANCE PAYMENT
❑ Requirements:
Written request of the contractor
Submission of:
a) an irrevocable standby letter of credit of
equivalent value from a commercial bank;
b) bank guarantee; or
c) surety bond
Objective
PROGRESS PAYMENTS
❑ Payments made by the PE to the contractor for
portions of the work done.
❑ Contractor may submit a statement of works
accomplished (progress billing)
❑ Request for progress payment for the work
accomplished in amounts the contractor considers
itself to be entitled to.
❑ Subject to 15% deduction, or the amount applicable,
which was a percentage of the total contract used as
advance payment.
RETENTION MONEY
❑ Purpose: To cover uncorrected defects after each
progress billing.
❑ PE shall retain an amount of the progress billing
equivalent to 10% of the total amount due to the
contractor
❑ Until 50% of the value of works has been completed.
❑ Retention shall not be imposed if:
work is satisfactorily done
work is on schedule.
RETENTION MONEY
Substitute for Retention Money:
Facts (Cont.):
c) Failing to monitor, supervise and inspect the project in
accordance with approved plans and specifications in order
to safeguard the interest of the government, thereby causing
undue injury to the government in the total amount
of P630,000.00 and giving unwarranted benefits to PAL
Boat Industry in the discharge of their official functions.
Ruling:
Ruling (Cont.):
Ruling (Cont.):
Ruling (Cont.):
Ruling (Cont.):
The accused caused undue injury to the Government
through their manifest partiality
Ruling (Cont.):
Arias v. Sandiganbayan is not applicable in the present
case
❑ Accused invokes the Arias doctrine which states that "[a]ll
heads of offices have to rely to a reasonable extent on their
subordinates and on the good faith of those who prepare
bids, purchase supplies, or enter into negotiations." He
contends that he merely relied on the vouchers and reports
prepared by his subordinates and released the payments in
good faith.
LIQUIDATED DAMAGES
❑ Fails to perform obligations within specified schedule
❑ Imposed for every day of delay until performance and
acceptance
❑ PE need not prove it incurred actual damages
❑ Amount is 1/10 of 1% of the cost of the unperformed
portion for every day of delay
❑ If sum of liquidated damages reach 10% of the contract
amount, PE may rescind the contract
228
MEAN OF K19 COMPONENTS FOR
30-MONTH PERIOD (AUG. 08 TO JAN. 11)
229
STANDARD DEVIATION
where:
σ = standard deviation
n = number of data in months (in this case 30)
x = value of each datum
μ = mean or average of data values
i = month of each datum (from month 1 to 30)
230
TWO STANDARD DEVIATION + MEAN
2 STDEV
STDEV (from + Mean
K19 Component 2 STDEV
Aug08-Jan11) (2σ+μ)
231
K19 THRESHOLD
232
AVERAGE VALUE OF PRICE INDEX
233
AVERAGE VALUE OF WORK ITEM
234
DETERMINATION IF PRICE ESCALATION
SHOULD BE GRANTED
235
IMPLEMENTATION BY
ADMINISTRATION
BY ADMINISTRATION
LEGAL BASIS
DEFINITION
THANK YOU!
Unit 2504 Raffles Corporate Center, F. Ortigas Road, Ortigas
Center, Pasig City, Philippines 1605
TeleFax: (632)7900-6741 to 44
Email address: training@gppb.gov.ph