RUSSIA
ACTIVITY REPORT 2013
The main task of the Russian Tunneling Association is the full assistance to:
• The introduction at practice of design and construction of underground facilities, new Technologies,
designs and materials;
• Improvement the efficiency and quality of construction of underground facilities;
• providing safety during construction and operation of underground facilities;
• Implementation of an integrated approach to the development of large cities’
underground space.
To solve these tasks Russian Tunneling Association regularly participates in the organization of
exhibitions of underground construction problems, arranges conferences, seminars, symposiums and
other events, directed to distribute the advanced domestic and foreign experience in underground
construction, uses other modern forms of scientific and technical information distribution, cooperates
with educational institutions on matters of training underground construction specialists.
3. Reconstruction of section between transport The 1st stage of the “Double of Kurortnyi
interchanges "Adler Ring" and "Golubye Dali" Avenue” is 5.67 km in length. The highway takes
("Union") with the length of 0.3 km. its origin from Agura River and ends at
Commissioning was in 2012. Zemlyanichnaya Street.
Pic. 2 Two-lane tunnel transverse section Pic. 4 One-lane tunnel N°2a transverse section
Construction length of stage 2 of the “Double of The lengths of the tunnels as part of Stage III of
Kurortnyi Avenue” is 5.32 km from the “Double of Kurortnyi Avenue” are:
Zemlyanichnaya Street to Sochi River. Tunnel N° 6 - 554.8 m;
Tunnel N° 6a - 564.1 m;
Parameters: Tunnel N° 7 - 804.2 m;
Length N° of Estimated Tunnels Bridges, Transport Tunnel N° 7a - 824.2 m;
km lanes speed, (paired) pc/km ation Tunnel N° 8 - 1561.9 m;
km/h pc/km interchan Tunnel N° 8a - 1538.1 m.
ges, pc
5.32 4 100/75 3/2.11 4/2.35 4 All tunnels are two-lane in each direction with a
width of carriageway of 2 X 3,75 m.
The lengths of the tunnels of the 2nd stage of the Construction of tunnels in the composition of
“Double of Kurortnyi Avenue” are: the 3rd stage of the “Double of Kurortnyi
Tunnel N° 3 - 660.79 m; avenue” is provided in the coastal lowland part
Tunnel N° 3a - 683.5 m; of the Sochi coast.
Tunnel N° 4 - 668.4 m;
Tunnel N° 4a - 669.4 m; To ensure effective and prompt management of
Tunnel N° 5 - 670.5 m;
the main groups of engineering systems of all
Tunnel N° 5a - 695.7 m
tunnels, the project envisages the creation of an
All tunnels are two-lane in each direction with a
automated technical processes control system
width of carriageway of 2 X 3, 75 m
(ATPCS). To provide comprehensive security for
vehicles in tunnels and portal junctions stations
project envisages the creation of an automated
traffic management system (ATMS). Tunnels are
protected. Portals provide security posts. Before
the inbound tunnel portal an opportunity to tap
vehicles in case of emergency within the tunnel
is provided – there is an ability to turn the
transport around before the portals with
departure to the opposite direction lane.
Pic.6 Design of double tunnel portals
Thus, with the implementation of projects for
the construction of the Olympic transport
Motorway “Double of Kurortnyi avenue” is
infrastructure by Rosavtodor, Sochi will become
concluded by the 3rd stage from Sochi River to
a modern comfortable resort, equally
Psahe River, the length of which is 5.33 km.
comfortable for living and for tourism. City
modern development is inseparable from the
Parameters:
upgrading of the existing road transport
Length N° of Estimated Tunnels Bridges Transportation network and the introduction of new high-class
km lanes speed (paired) pc/km interchanges, road tracks.
km/h pc/km pc
MOSCOW METRO PROSPECTS The first section of the 3rd interchange circuit
M. S. Khusnullin, Deputy Mayor of Moscow on from "Nizhnyaja Maslovka" station to
urban and construction policies "Khoroshyovskaya" station (7,2 km, four
stations ) is already being constructed and will
To solve the transport system problems of the
have been completed by 2015.
capital, the Moscow Government took a
strategic decision on the design and
It is clear that the solution of such major
implementation of the Moscow Metro
problems in a very short time, only by Moscow
development program for the period of up to
design and construction organizations’ forces is
2020, because both today and in the future the
impossible. Therefore, relying on the power of
metro will remain the main transport artery of
traditional Moscow giants - OJSC
the city.
"Metrogiprotrans", JSC "Mosmetrostroy", JSC
"Transinzhstroy", JSC "NPO "Engeocom", a wide
One of the main factors ensuring the growth
network of executors was created, which can
and development of any region or city is the
solve the challenges ahead. In the center of this
development of transport infrastructure...
union there is "Mosinzhproekt" assigned to
Strategic solution for solving the problems of
unify and coordinate the efforts of designers
the city transport system was the decision of
and builders as well as address the issues (and it
the Moscow government on the design and
is also a fundamental innovation) with urban
implementation of a large-scale development
design, construction , operating agencies,
program of the Moscow Subway during the
control departments and local authorities.
period of 2011-2020. Simply put, more than 160
Russian Tunneling Association, which has a
km of transmission lines and 70 stations to be
composition of experienced metro construction
built in the capital in ten years.
professionals, currently does not only conduct
expertise of the industrial safety projects and
Both today and in the future the Moscow metro
participates in the regulations development, but
system is the main traffic artery of the city. Daily
it is also directly involved in the process
traffic volume is of about 9 million people. At
scientific and technical support of construction
the same time, the extension deficit of Metro in
and provides monitoring and advisory support...
2012 was about 200 km, and 22 % of
Muscovites were not serviced by the metro at
Such organizations as JSC "Bamtonnelstroy",
all. Implementation of plans for Moscow metro
JSC "ABC Inzhstroy", Kazgrazhdanproekt, SUE
construction will allow reducing this figure to
"URSG", Kazmetrostroy, Moselektrotyagstroy,
7% by 2020.
LLC "Inzhstroyproekt" Minskmetroproekt,
Kazan Giproniiaviaprom, LLC
Only in 2013, 14 kilometers of transmission lines
"Transtonnelstroy", LLC "Spetstonnelstroy",
and seven subway stations are planned to be
"Mospromstroy", JSC "SU-155",
commissioned...
Kanalstroyproekt, etc. were involved in design
and construction.
The most important engineering solution,
designed to relieve tension in downtown area
The construction of the Moscow Metro may be
passenger traffic and shorten travel from one
comparable only with China and Spain by the
district to another, was the decision to build the
scope of work and their executors’ power.
3rd interchange circuit (TIC), the so-called
Metro’s "second ring" ... The construction of 50
Currently work is being done at 90 construction
km of transmission lines and 22 stations is
sites, which involve more than 18 thousand
planned.
builders and 14 tunnel boring systems.
RUSSIA – Activity Report 2013
One of the work development directions of the measures, so the Moscow government has
Moscow Metro is studying international subway developed a comprehensive program for the
experience. Moscow transport hub development, which
includes Moscow subway, rail infrastructure and
The most similar development program to the the Moscow region develop measures, the road
Moscow Metro is the metro development network formation and transport hubs
program in Madrid, where 200 km of development . All kinds of surface and
transmission lines were built during 12 years. underground transport will be connected in a
Construction of stations using Spanish single network by 255 transport interchange
technology reduces the cost of transport units (TIUs). TIUs will appear in many subway
communications transfer by 25%, and carrying stations and stops of the Moscow Ring
out work by (in) parts reduces the amount of (Koltsevaya) Railway, so the townspeople could
territory occupied by the construction site. leave their cars in secure and well-equipped
parking and continue further way by metro.
It is also involves the study and analysis of the
proposals on construction of the underground
double-track tunnels, one-vaulting stations with
deep foundations, the improvement of
penetration of tunnels without precipitation,
the introduction of a new ventilation method of
underground elements with air conditioning,
etc.
Significant progress has been made in the Comprehensive exchange of experience and
tunnels and underground structures knowledge between specialists from different
construction in Russian cities. Most grandiose countries, of very different skills: builders,
construction was organized in Moscow, which designers, researchers, developers and
is the capital of our Motherland. manufacturers of equipment, structures and
materials, organizers of construction industry is
More than 160 km of subway lines and 70 important and there is no need to prove it
stations have to be built as part of the Moscow again. One of the tools for such an exchange of
Government strategic program for the Moscow experience and knowledge is to hold scientific
Metro development, during the period of 2011 - and technical conferences, seminars and other
2020. Currently the construction of stations forums on topical issues of our industry, which
"Delovoj Centre" - " Park Pobedy" of Kalininsko- is widely used in the Tunneling Association
Solntsevskaya line, " Ulitsa Starokachalovskaya" - practice.
"Novoyasenevskaya" of Butovskaya line are on
the final stage, stations commissioned are " Contribution of educational institutions, which
Lermontovskiy prospect" and "Zhulebino" of train specialists to work in research, design,
Tagansko-Krasnopresnenskaya line . In 2014 it is construction and manufacturing organizations,
planned to put into operation the "Kotelniki" which, in turn, provide creating of tunnels and
station of the same line, as well as sections of subways, to our common business, is great.
"Marjina Roscha" - "Petrovsko-Razumovskaya" -
"Seligerskaya" of Lyublinsko-Dmitrovskaya line, We should not forget about the regular
"Yugo-Zapadnaya" - " Troparyovo " - technical officers training, who already
"Rumyantsevo" - "Salarevo" of Sokolnicheskaya graduated from schools in previous years, and
line, "Spartak" of Tagansko-Krasnopresnenskaya currently work for our industry. For this
line, "Tekhnopark" of Zamoskvoretskaya line, the purpose, at the end of 2013 at the Moscow
RUSSIA – Activity Report 2013
State University of Railway Engineering Federal highway Adler-Krasnaya Protected part of the road Adler-
(MIIT) the department "Transport tunnels Polyana Reconstruction. Section KM 43- Krasnaya Polyana km 23 +050- km 26
and subways" was established by Russian 48. There are two highway tunnels being +450 on the right rocky shelf of
tunnelling Association. Lections at the constructed in the area of KM 46-47. canyon AH-CU in the Mzymta River
department are conducted by leading KM-48 Tunnel’s southern portal valley
scientists and experts involved by
Tunnelling Association.