You are on page 1of 20

Royal Arts Complex

Stage 3C – Construction
documents

PACKAGE 3.0. SANITARY DRAINAGE CALCULATION


KSP-RBT-RAC-DD-CAL-SAN-0003
EDITION DATE: 2023/03/29
Quality control sheet
Document Sanitary drainage Calculation

Project Royal Arts Complex

Phase 3C

Code KSP-RBT-RAC-CD-CAL-SAN-0003.docx

Authors: Signed: VVC

Date: 20.03.2023

Verified Signed: GAM

Date: 21.03.2023

Recipient RBTA

Notes Revision 01

Change tracker

Main modification Review of calculation according minor changes in network geometry (KSP
from stage 3c network connection update)

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 2 of 20
Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx
© Copyright TYPSA. All rights reserved Page 3 of 20
Index

KSP-RBT-RAC-DD-CAL-SAN-0003 ...................................................................................................................................................... 1

1. Sanitary network.................................................................................................................................................................................. 5

1.1. Description ................................................................................................................................................................................ 5

1.2. Purpose and scope ............................................................................................................................................................... 5

1.3. Design Principles.................................................................................................................................................................... 5

2. Calculation of Plot B ........................................................................................................................................................................... 7

2.1. Run B-W ................................................................................................................................................................................... 11

2.2. Run B-NE ................................................................................................................................................................................. 15

2.3. Run B-SE .................................................................................................................................................................................. 18

Index of Tables

Table 1: Gravity Flow – Run B-W ....................................................................................................................................................11


Table 2: Pumping Flow – Run B-W ...............................................................................................................................................12
Table 3: Flow check – Run B-W......................................................................................................................................................14
Table 4: Gravity Flow – Run B-NE ..................................................................................................................................................15
Table 5: Pumping Flow – Run B-NE .............................................................................................................................................16
Table 6: Flow check – Run B-NE ....................................................................................................................................................17
Table 7: Gravity Flow – Run B-SE...................................................................................................................................................18
Table 8: Pumping Flow – Run B-SE..............................................................................................................................................19
Table 9: Flow check – Run B-SE ....................................................................................................................................................20
Index of Figures
Figure 1: General plan view_________________________________________________________________ 5

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 4 of 20
1. Sanitary network

1.1. Description

Three routes are planned to collect sanitary water from buildings D1, D2, D3, D5 and D6. Run
B-W collects water mainly from buildings D1, D6 and D5. Run B-SE collects water from the
southern buildings D2 and D3. Run B-NE collects water from the northern buildings D2 and
D3

Figure 1: General plan view

1.2. Purpose and scope

This calculation pack contains the calculations used to size the external sanitary network at
Plot A of the RAC.

The Plot B network has not been updated with respect to the Schematic Design phase as flow
rates and location of discharge points are under review.

1.3. Design Principles

The design criteria are shown in document KSP-RBT-P1-RAC-DD-RPT-CIV-0002.

The Water Consumption Method estimates the design flow at each discharge point into the
KSP network, based on a proportion (85%) of the water consumption, multiplied by a peaking
factor, in accordance with guidance from Omrania.

The peaking factor is calculated using Babbitt's formula.

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 5 of 20
5
=
( ) .
1000

P= Population

Daily consumption data has been converted into an average flow rate in litres per second
assuming 10h occupancy per day.

The flow rate calculated by the Discharge Unit method has been used to size the on-plot
network. Autodesk Storm and Sanitary Analysis 2020 hydraulic modelling software has been
used to calculate flows in each pipe in the network which has been sized accordingly to
ensure no full bore flow within the network (SBC 701).

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 6 of 20
2. Calculation of Plot B

Flows discharged to each manhole per type of buildings have been calculated as shown
below:

AWC = Average Water Consumption (l/d)

PWC= Peak Water Consumption (l/d)

PF= Peaking Factor (Babbitts)

The calculation of flow generated in each building made in the schematic design needs to
be adjusted to estimate the flow discharged to each of the manholes in a given building.
For this purpose, the DU factor has been considered by distributing the estimated global
flow according to the DU number of each outlet.. MEP report KSP-RBT-RAC-ENG-BSE-CAL-
5013 calculates these DU values.

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 7 of 20
BUILDINGS D1,D5&D6

Average
Flow (l/s)
10 hours
per day

Building Potential DU AWC PWC (l/d) Water to SWADD M (Peak Gravity Peak
ocupants l/d Sanitary Coeficient) flow (l/s)
Flow
Factor

D1&D6 Performing Arts 1320 52.9 30 7457.60057 85% 0.18 4.40 0.77
and Music/Heritage 0.00
46.5 30 6555.35778 85% 0.15 4.40 0.68
43.4 30 6118.33393 85% 0.14 4.40 0.64
8.5 30 1198.29121 85% 0.03 4.40 0.12
10.2 30 1437.94945 85% 0.03 4.40 0.15
44 30 6202.91919 85% 0.15 4.40 0.64
3.2 30 451.121396 85% 0.01 4.40 0.05
15.7 30 2213.31435 85% 0.05 4.40 0.23
48.7 30 6865.50374 85% 0.16 4.40 0.71
7.8 30 1099.6084 85% 0.03 4.40 0.11
D5 Auditorium 319 3.8 30 1010.16667 85% 0.02 4.40 0.10
5.8 30 1541.83333 85% 0.04 4.40 0.16
17.4 30 4625.5 85% 0.11 4.40 0.48
9 30 2392.5 85% 0.06 4.40 0.25

D5 Restaurant 255 -- 10 2550 85% 0.06 4.40 0.26


TOTAL 1894 5.4

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 8 of 20
BUILDINGS D3

Average
Flow (l/s)
10 hours
per day
Building Potential DU AWC PWC (l/d) Water to SWADD M (Peak Gravity MANHOLE OUTLET
ocupants l/d Sanitary Coeficient) Peak flow
Flow (l/s)
Factor
D3 Visual Art 1518 9.8 30 1725.13 85% 0.04 4.60 0.19 MHB-W-30 OUTLET-FW-D3-05
Academy
44 30 7745.50 85% 0.18 4.60 0.84 MHB-W-32 OUTLET-FW-D3-06
24.6 30 4330.44 85% 0.10 4.60 0.47 MHB-SE-1 OUTLET-FW-D3-07
21.4 30 3767.13 85% 0.09 4.60 0.41 MHB-SE-3 OUTLET-FW-D3-08
27.9 30 4911.35 85% 0.12 4.60 0.53 OUTLET-LW-D3-08
18.8 30 3309.44 85% 0.08 4.60 0.36 MHB-NE-4 OUTLET-FW-D3-04
26 30 4576.88 85% 0.11 4.60 0.50 OUTLET-LW-D3-04
19.4 30 3415.06 85% 0.08 4.60 0.37 MHB-NE-2 OUTLET-FW-D3-03
24.6 30 4330.44 85% 0.10 4.60 0.47 MHB-NE-1 OUTLET-FW-D3-02
20.8 30 3661.51 85% 0.09 4.60 0.40 MHB-W-1 OUTLET-FW-D3-01
21.4 30 3767.13 85% 0.09 4.60 0.41 OUTLET-LW-D3-01
TOTAL 4.95

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 9 of 20
BUILDINIG D2

Average
Flow
(l/s)
10
hours
per day
Building Potential DU AWC PWC (l/d) Water to SWADD M (Peak Gravity MANHOLE OUTLET
ocupants l/d Sanitary Coeficient) Peak flow
Flow (l/s)
Factor
D2 Performance 1287 59 30 11424.22 85% 0.27 4.75 1.28 MHB-SE-5 OUTLET-FW-D2-04
Art Academy
22 30 4259.88 85% 0.10 4.75 0.48 MHB-SE-7 OUTLET-FW-D2-05
11.6 30 2246.12 85% 0.05 4.75 0.25 MHB-SE-8 OUTLET-FW-D2-06
-- 85% 0.00 4.75 0.00 MHB-SE-12 OUTLET-FW-P4-03
-- 85% 0.00 4.75 0.00 MHB-SE-10 OUTLET-FW-P4-02
11.6 30 2246.12 85% 0.05 4.75 0.25 MHB-NE-9 OUTLET-FW-D2-03
42 30 8132.50 85% 0.19 4.75 0.91 MHB-NE-8 OUTLET-FW-D2-02
53.2 30 10301.16 85% 0.24 4.75 1.16 MHB-NE-6 OUTLET-FW-D2-01
TOTAL 4.33

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 10 of 20
2.1. Run B-W

Run B-W collects sanitary water from buildings D1, D6 and D5.

The following table shows the gravity flows per manhole

BUILDING MANHOLE OUTLET GRAVITY


PEAK
FLOW
(l/s)
D1 MHB-W-24 OUTLET-FW-D1-01 0.77
D1 MHB-W-28 OUTLET-FW-D1-02 0.68
D6 MHB-W-3 OUTLET-FW-D6-05 0.76

D6 MHB-W-5 OUTLET-FW-D6-04 0.15


D6 MHB-W-7 OUTLET-FW-D6-03 0.69

D6 MHB-W-9 OUTLET-FW-D6-02 0.23


D6 MHB-W-11 OUTLET-FW-D6-01 0.83
OUTLET-LW-D6-01
D5 MHB-W-18 OUTLET-FW-D5-01 0.10
D5 MHB-W-21 OUTLET-FW-D5-02 0.16
D5 MHB-W-16 OUTLET-FW-D5-03 0.48
D5 MHB-W-22 OUTLET-FW-D5-04 0.25
D5 MHB-W-21 OUTLET-GSW-D5-01 0.26
D3 MHB-W-30 OUTLET-FW-D3-05 0.19
D3 MHB-W-32 OUTLET-FW-D3-06 0.84
D3 MHB-W-1 OUTLET-FW-D3-01 0.40
OUTLET-LW-D3-01 0.41
TOTAL 7.21

Table 1: Gravity Flow – Run B-W

The flow rate of 7.21 l/s corresponds to the gravity flow value. The buildings have several
pumps for intermittent use. The flow rates are as follows:

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 11 of 20
Building Flow rate
MANHOLE OUTLET (l/s)

D1 OUTLET- 5
MHB-W-24 FW-D1-01

D1 OUTLET-
MHB-W-26 FW-P4-01 5

D1 OUTLET-
MHB-W-28 FW-D1-02 5
MHB-W-3
OUTLET-
D6 5
FW-D6-05

MHB-W-5
OUTLET-
D6 5
FW-D6-04

MHB-W-9 OUTLET-
D6 5
FW-D6-02

MHB-W-11
OUTLET-
D6 5
FW-D6-01

D3 OUTLET- 1.6
MHB-W-30 FW-D3-05

D3 OUTLET- 9.34
MHB-W-32 FW-D3-06

Table 2: Pumping Flow – Run B-W

For the calculation of the network, the flow rate of the highest flow pump per building has
been considered together with the gravity flow rate.

The following table shows the calculation of the run B-W showing the correct functioning of
the network.

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 12 of 20
SN Element From (Inlet) To (Outlet) Length Average Pipe Manning's Entrance Exit/Bend Peak Max Depth/ Max Flow Reported
ID (m) Slope Diameter Roughness Losses Losses Flow Flow diameter Depth (m)
(%) (mm) (l/s) Velocity
(m/s)
1 F101 MHB-W-28 MHB-W-29 26.46 1.0000 150.00 0.0090 0.5000 0.5000 5.690 1.05 34% 0.05 Calculated
2 F102 MHB-W-24 MHB-W-25 23.35 1.1200 150.00 0.0090 0.5000 0.5000 0.770 0.61 14% 0.02 Calculated
3 F108 MHB-W-29 MHB-W-27 29.77 1.0000 150.00 0.0090 0.5000 0.5000 16.050 1.36 68% 0.10 Calculated
4 F109 MHB-W-30 MHB-W-32 14.28 1.1400 150.00 0.0090 0.5000 0.5000 0.190 0.40 7% 0.01 Calculated
5 F110 MHB-W-32 MHB-W-33 32.22 1.0000 150.00 0.0090 0.5000 0.5000 10.370 1.23 48% 0.07 Calculated
6 F117 MHB-W-15 MHB-W-17 14.83 0.5000 200.00 0.0090 0.5000 0.5000 8.470 0.89 36% 0.07 Calculated
7 F118 MHB-W-22 MHB-W-23 48.28 1.0000 150.00 0.0090 0.5000 0.5000 0.250 0.42 7% 0.01 Calculated
8 F125 MHB-W-21 MHB-W-23 21.22 1.0000 150.00 0.0090 0.5000 0.5000 0.260 0.42 7% 0.01 Calculated
9 F14 MHB-W-33 MHB-W-29 65.33 1.0000 150.00 0.0090 0.5000 0.5000 10.370 1.23 48% 0.07 Calculated
10 F19 MHB-W-13 MHB-W-15 68.91 0.5000 200.00 0.0090 0.5000 0.5000 8.470 0.89 36% 0.07 Calculated
11 F27 MHB-W-2 MHB-W-4 35.20 1.0000 150.00 0.0090 0.5000 0.5000 0.810 0.59 14% 0.02 Calculated
12 F29 MHB-W-31 MHB-W-32 3.68 1.0000 150.00 0.0090 0.5000 0.5000 0.000 0.00 0% 0.00 Calculated
13 F30 MHB-W-20 Out-1F30 69.29 0.5000 200.00 0.0090 0.5000 0.5000 26.380 1.18 71% 0.14 Calculated
14 F31 MHB-W-25 MHB-W-23 41.72 1.0000 150.00 0.0090 0.5000 0.5000 16.820 1.19 75% 0.11 Calculated
15 F32 MHB-W-23 MHB-W-20 44.78 1.0000 150.00 0.0090 0.5000 0.5000 17.330 1.37 68% 0.10 Calculated
16 F33 MHB-W-1 MHB-W-2 22.76 1.0000 150.00 0.0090 0.5000 0.5000 0.810 0.59 14% 0.02 Calculated
17 F34 MHB-W-3 MHB-W-4 22.77 1.0000 150.00 0.0090 0.5000 0.5000 5.930 1.07 34% 0.05 Calculated
18 F35 MHB-W-7 MHB-W-8 22.80 1.0000 150.00 0.0090 0.5000 0.5000 0.690 0.57 14% 0.02 Calculated
19 F36 MHB-W-11 MHB-W-12 39.49 1.0000 150.00 0.0090 0.5000 0.5000 0.830 0.60 14% 0.02 Calculated
20 F37 MHB-W-4 MHB-W-6 24.75 1.0000 150.00 0.0090 0.5000 0.5000 6.570 1.09 41% 0.06 Calculated
21 F38 MHB-W-6 MHB-W-8 35.25 1.0000 150.00 0.0090 0.5000 0.5000 6.720 1.09 41% 0.06 Calculated
22 F39 MHB-W-8 MHB-W-10 19.82 1.0000 150.00 0.0090 0.5000 0.5000 7.410 1.12 41% 0.06 Calculated
23 F40 MHB-W-12 MHB-W-13 44.53 0.5000 200.00 0.0090 0.5000 0.5000 8.470 0.89 36% 0.07 Calculated

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 13 of 20
SN Element From (Inlet) To (Outlet) Length Average Pipe Manning's Entrance Exit/Bend Peak Max Depth/ Max Flow Reported
ID (m) Slope Diameter Roughness Losses Losses Flow Flow diameter Depth (m)
(%) (mm) (l/s) Velocity
(m/s)
24 F81 MHB-W-10 MHB-W-12 35.13 1.0000 150.00 0.0090 0.5000 0.5000 7.640 1.13 41% 0.06 Calculated
25 F84 MHB-W-26 MHB-W-27 26.47 1.0000 150.00 0.0090 0.5000 0.5000 0.000 0.00 0% 0.00 Calculated
26 F85 MHB-W-27 MHB-W-25 44.77 1.0000 150.00 0.0090 0.5000 0.5000 16.050 1.36 68% 0.10 Calculated
27 F86 MHB-W-19 MHB-W-20 50.93 0.5000 200.00 0.0090 0.5000 0.5000 9.050 0.91 36% 0.07 Calculated
28 F87 MHB-W-17 MHB-W-19 20.76 0.5000 200.00 0.0090 0.5000 0.5000 8.950 0.90 36% 0.07 Calculated
29 F92 MHB-W-14 MHB-W-13 28.47 1.0000 100.00 0.0090 0.5000 0.5000 0.000 0.00 0% 0.00 Calculated
30 F93 MHB-W-9 MHB-W-10 22.67 1.0000 150.00 0.0090 0.5000 0.5000 0.230 0.40 7% 0.01 Calculated
31 F94 MHB-W-5 MHB-W-6 22.98 1.0000 150.00 0.0090 0.5000 0.5000 0.150 0.36 7% 0.01 Calculated
32 F95 MHB-W-18 MHB-W-19 19.28 1.0000 150.00 0.0090 0.5000 0.5000 0.100 0.31 7% 0.01 Calculated
33 F96 MHB-W-16 MHB-W-17 42.07 1.0000 150.00 0.0090 0.5000 0.5000 0.480 0.49 14% 0.02 Calculated

Table 3: Flow check – Run B-W

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 14 of 20
2.2. Run B-NE

Run B-NE collects sanitary water from buildings D2 and D3.

The following table shows the gravity flows per manhole

BUILDING MANHOLE OUTLET GRAVITY


PEAK
FLOW
(l/s)
D2 MHB-NE-9 OUTLET-FW-D2-03 0.25
D2 MHB-NE-8 OUTLET-FW-D2-02 0.91
D2 MHB-NE-6 OUTLET-FW-D2-01 1.16
D3 OUTLET-FW-D3-04 0.36
MHB-NE-4 OUTLET-LW-D3-04 0.50
D3 MHB-NE-2 OUTLET-FW-D3-03 0.37
D3 MHB-NE-1 OUTLET-FW-D3-02 0.47
TOTAL 4.02

Table 4: Gravity Flow – Run B-NE

The flow rate of 4.02 l/s corresponds to the gravity flow value. The buildings have several
pumps for intermittent use. The flow rates are as follows:

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 15 of 20
Flow rate
Building MANHOLE OUTLET
(l/s)

D2 MHB-NE-9 OUTLET-FW-D2-03 15.2

D2 MHB-NE-8 OUTLET-FW-D2-02 5

D2 MHB-NE-6 OUTLET-FW-D2-01 15.2

OUTLET-FW-D3-04 5
D3 MHB-NE-4 6.12
OUTLET-LW-D3-04

D3 MHB-NE-2 OUTLET-FW-D3-03 5

D3 MHB-NE-1 OUTLET-FW-D3-02 15.2

Table 5: Pumping Flow – Run B-NE

For the calculation of the network, the flow rate of the highest flow pump per building has
been considered together with the gravity flow rate.

The following table shows the calculation of the run B-NE showing the correct functioning of
the network.

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 16 of 20
SN Element From (Inlet) To (Outlet) Length Average Pipe Manning's Entrance Exit/Bend Peak Max Depth/ Max Reported
ID (m) Slope (%) Diameter Roughness Losses Losses Flow Flow diameter Flow
(mm) (l/s) Velocity Depth
(m/s) (m)
1 83 (22) MHB-NE-17 MHB-NE-3 37.05 1.0000 100.000 0.0090 0.5000 0.5000 0.000 0.00 0% 0.00 Calculated

2 83 (25) MHB-NE-18 MHB-NE-12 36.55 1.8400 100.000 0.0090 0.5000 0.5000 0.000 0.00 0% 0.00 Calculated
3 F111 MHB-NE-8 MHB-NE-10 28.20 1.0000 150.000 0.0090 0.5000 0.5000 0.910 0.62 13% 0.02 Calculated
4 F126 MHB-NE-12 Out-1F126 63.55 0.5000 200.000 0.0090 0.5000 0.5000 19.220 1.10 55% 0.11 Calculated
5 F15 MHB-NE-1 MHB-NE-2 35.17 0.5000 200.000 0.0090 0.5000 0.5000 15.670 1.05 50% 0.10 Calculated
6 F16 MHB-NE-2 MHB-NE-3 45.83 0.5000 200.000 0.0090 0.5000 0.5000 16.040 1.05 50% 0.10 Calculated
7 F17 MHB-NE-3 MHB-NE-5 13.80 0.5000 200.000 0.0090 0.5000 0.5000 16.040 1.05 50% 0.10 Calculated
8 F18 MHB-NE-7 MHB-NE-10 73.33 0.5000 200.000 0.0090 0.5000 0.5000 18.060 1.08 55% 0.11 Calculated
9 F63 MHB-NE-5 MHB-NE-7 30.60 0.5000 200.000 0.0090 0.5000 0.5000 16.900 0.93 55% 0.11 Calculated
10 F65 MHB-NE-10 MHB-NE-11 25.41 0.5000 200.000 0.0090 0.5000 0.5000 19.220 1.10 55% 0.11 Calculated
11 F66 MHB-NE-4 MHB-NE-5 22.80 1.0000 150.000 0.0090 0.5000 0.5000 0.860 0.48 13% 0.02 Calculated
12 F68 MHB-NE-6 MHB-NE-7 22.81 1.0000 150.000 0.0090 0.5000 0.5000 1.160 0.66 13% 0.02 Calculated
13 F69 MHB-NE-9 MHB-NE-10 22.62 1.0000 150.000 0.0090 0.5000 0.5000 0.250 0.42 7% 0.01 Calculated
14 F70 MHB-NE-11 MHB-NE-12 55.86 0.5000 200.000 0.0090 0.5000 0.5000 19.220 1.10 55% 0.11 Calculated

Table 6: Flow check – Run B-NE

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 17 of 20
2.3. Run B-SE

Run B-SE collects sanitary water from buildings D2 and D3.

The following table shows the gravity flows per manhole

BUILDING MANHOLE OUTLET GRAVITY


PEAK
FLOW
(l/s)
MHB-SE-1 OUTLET-FW-D3-07 0.47
OUTLET-FW-D3-08 0.41
MHB-SE-3 OUTLET-LW-D3-08 0.53
MHB-SE-5 OUTLET-FW-D2-04 1.28
MHB-SE-7 OUTLET-FW-D2-05 0.48
MHB-SE-8 OUTLET-FW-D2-06 0.25
TOTAL 3.43

Table 7: Gravity Flow – Run B-SE

The flow rate of 3.43 l/s corresponds to the gravity flow value. The buildings have several
pumps for intermittent use. The flow rates are as follows:

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 18 of 20
Flow rate
Building MANHOLE OUTLET
(l/s)

D3 7.18
MHB-SE-1 OUTLET-FW-D3-07
4.63
D3 OUTLET-FW-D3-08
6.34
MHB-SE-3 OUTLET-LW-D3-08

D2
MHB-SE-5 OUTLET-FW-D2-04 5

D2
MHB-SE-7 OUTLET-FW-D2-05 5

D2
MHB-SE-12 OUTLET-FW-P4-03 5.85

D2
MHB-SE-10 OUTLET-FW-P4-02 1.6

Table 8: Pumping Flow – Run B-SE

For the calculation of the network, the flow rate of the highest flow pump per building has
been considered together with the gravity flow rate.

The following table shows the calculation of the run B-SE showing the correct functioning of
the network.

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx


© Copyright TYPSA. All rights reserved Page 19 of 20
SN Element From To (Outlet) Length Average Pipe Manning's Entrance Exit/Bend Peak Max Depth/ Max Reported
ID (Inlet) (m) Slope Diameter Roughness Losses Losses Flow Flow diameter Flow
(%) (mm) (l/s) Velocity Depth
(m/s) (m)
1 F103 MHB-SE-5 MHB-SE-6 26.48 1.0000 150.000 0.0090 0.5000 0.5000 1.280 0.68 13% 0.02 Calculated

2 F104 MHB-SE-3 MHB-SE-4 26.50 1.0000 150.000 0.0090 0.5000 0.5000 0.940 0.62 13% 0.02 Calculated
3 F105 MHB-SE-2 MHB-SE-4 29.84 1.0000 150.000 0.0090 0.5000 0.5000 7.650 1.13 40% 0.06 Calculated
4 F106 MHB-SE-4 MHB-SE-6 32.50 1.0000 150.000 0.0090 0.5000 0.5000 8.590 1.17 47% 0.07 Calculated
5 F107 MHB-SE-6 MHB-SE-9 67.64 1.0000 150.000 0.0090 0.5000 0.5000 9.870 1.21 47% 0.07 Calculated
6 F121 MHB-SE-16 Out-1F121 13.96 0.9700 150.000 0.0090 0.5000 0.5000 16.450 1.34 67% 0.10 Calculated
7 F122 MHB-SE-15 MHB-SE-16 52.80 1.0000 150.000 0.0090 0.5000 0.5000 0.000 0.00 0% 0.00 Calculated
8 F25 MHB-SE-14 MHB-SE-16 84.55 1.0000 100.000 0.0090 0.5000 0.5000 16.450 1.36 67% 0.10 Calculated
9 F26 MHB-SE-13 MHB-SE-14 75.46 0.6800 150.000 0.0090 0.5000 0.5000 5.850 0.91 40% 0.06 Calculated
10 F28 MHB-SE-1 MHB-SE-2 35.90 1.0000 150.000 0.0090 0.5000 0.5000 7.650 1.13 40% 0.06 Calculated
11 F77 MHB-SE-9 MHB-SE-14 24.74 1.0000 150.000 0.0090 0.5000 0.5000 10.600 1.23 47% 0.07 Calculated
12 F78 MHB-SE-8 MHB-SE-9 27.67 1.0000 150.000 0.0090 0.5000 0.5000 0.250 0.42 7% 0.01 Calculated
13 F79 MHB-SE-11 MHB-SE-13 17.51 0.7100 150.000 0.0090 0.5000 0.5000 0.000 0.00 0% 0.00 Calculated
14 F80 MHB-SE-7 MHB-SE-9 27.16 1.0000 150.000 0.0090 0.5000 0.5000 0.480 0.49 13% 0.02 Calculated
15 F82 MHB-SE-12 MHB-SE-13 10.03 0.9100 150.000 0.0090 0.5000 0.5000 6.680 0.99 40% 0.06 Calculated

Table 9: Flow check – Run B-SE

Royal Arts Complex KSP-RBT-RAC-CD-CAL-SAN-0003_.docx