Professional Documents
Culture Documents
Improve Control
Define
Define Measure Analyze Design Verify
Define
Goal What: Obtain approval (team and sponsor) on
a well defined project and on the
implementing strategies
Because: Reduce “restarts” and duration of the
project.
Input Output
üBoundaries of the Project
üProject title related to the
Problem üDetailed definition of the
Defect
üMacro-definition of the
Defect üExamination of benefits
üMacro-definition of expected Define üTeam creation
benefits. üProduct tree
üProcess map
The Process map and the team are the compass and fuel
necessary for the trip
Create the Team Map the Identify critical Delimit the project
process phases (QFD)
v Method
v Sponsor
v Team
€
The Team implements the
Method
Sponsor
Team
project, the Black and Green
Belts bring the method.
The first step is to collect the correct data. The following questions help
us to determine what data are required:
v Kano Analysis
v Q.F.D.
v Pareto Analysis
v Use of results from other projects
v Process Map (SIPOC)
v Costs/benefits analysis