I NTRODUCTION
LECTURE 1 : MA IN POINTS
PROJECT
Administrations
PROFESSIONAL
2 The teams players roles and
CONTRACT
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION
PROFESSIONALS responsibilities
ADMINISTRATION
CONTRACTORS
UNDERSTANDING
THE DOCUMENTS
3
4
Pre-construction Submittals
Types of Meetings
PROFESSIONAL 5 Submittals
6 Site Visit, Observ ations and Inspection
CONCLUSION
CEELB230
CEELB230
PROJECT M ANAGEM ENT ht t ps://www.gograph.com
7 MIDTERM EXAM
1-2 1-2
Engr. Debbie Lyn Cabacungan, MSc.CM
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0.
COURSE TOPICS
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
I NTRODUCTION
MA IN POINTS
GRADING SYSTEM
THE TEAM WEEK THE TEAM
APPROACH
COURSE TOPICS FOR MIDTERM PERIOD APPROACH
NO.
PROJECT OWNER PROJECT OWNER CLASS STANDING:
8 Interpretations and Modifications of
DESIGN DESIGN
contracts
PROFESSIONAL PROFESSIONAL
9 Executing the works Quizzes - 60%
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS PROFESSIONALS
CONTRACTORS
10 Claims and Disputes
CONTRACTORS
Term Paper; Case Studies
11 Measurement and Payment
UNDERSTANDING UNDERSTANDING (Individual / Group) – 25%
THE DOCUMENTS 12 Quality Control and Quality Assurance THE DOCUMENTS
PROFESSIONAL 13 Project Close-out PROFESSIONAL Recitation;Attendance– 15%
CONCLUSION 13.5 Final Exam CONCLUSION 100%
CEELB230
CEELB230
ht t ps://www.gograph.com
ht t ps://www.gograph.com
1
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
CONSTRUCTION I NTRODUCTION
CONSTRUCTION CONTRACT
MAIN POINTS MA IN POINTS
ADMINISTRATION vs.
THE TEAM
APPROACH
CONTRACT THE TEAM
APPROACH CONSTRUCTION
PROJECT OWNER
DESIGN
PROFESSIONAL
ADMINISTRATION
PROJECT OWNER
DESIGN
PROFESSIONAL
MANAGEMENT
involves the activities necessary to effect and
CONSTRUCTION Contract Administration
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS
determine the fulfillment of the contract PROFESSIONALS
requirements by the parties to the construction activities related to administering the
CONTRACTORS CONTRACTORS contract for construction, typically
UNDERSTANDING contract. UNDERSTANDING
performed by the A/E.
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL
Construction management is a delivery
CONCLUSION CONCLUSION method.
CEELB230
CEELB230
ht t ps://www.gograph.com ht t ps://www.gograph.com
I NTRODUCTION
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
BENEFITS OF MA IN POINTS OBSTACLE WORKING
THE TEAM
APPROACH
WORKING AS A THE TEAM
APPROACH AS A TEAM
TEAM
PROJECT OWNER
PROJECT OWNER
DESIGN
DESIGN
PROFESSIONAL
PROFESSIONAL
CONSTRUCTION Adv ersarial relationships/personalities
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION
PROFESSIONALS Better communication and coordination PROFESSIONALS I ncomplete or inaccurate contract
CONTRACTORS
CONTRACTORS I ncreased productiv ity
documents
UNDERSTANDING
UNDERSTANDING Reduced project costs THE DOCUMENTS Unreasonable schedule requirements
THE DOCUMENTS
PROFESSIONAL Earlier project completion PROFESSIONAL Unplanned or inordinate number of
I mprov ed project team morale CONCLUSION changes to the project scope
CONCLUSION
CEELB230
CEELB230
ht t ps://media4.giphy.com Fewer claims and delays ht t ps://www. media4.giphy.com
Labor issues
2
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
OBSTACLE WORKING I NTRODUCTION
MA IN POINTS
PROJECT PLAYERS
THE TEAM
APPROACH
AS A TEAM THE TEAM
APPROACH
Entities who make a valuable contribution
to the effort while at the same time adding to
PROJECT OWNER PROJECT OWNER the complexity of the process. It is very important
DESIGN DESIGN to understand the various roles and
PROFESSIONAL Delays in product fabrication or PROFESSIONAL
responsibilities of these many players as they
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS deliv ery PROFESSIONALS influence the construction management
CONTRACTORS Poor communications CONTRACTORS process.
UNDERSTANDING Delays caused by ineffectiv e UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL management PROFESSIONAL
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://www.gograph.com
ht t ps://https://cpmiteam.com/
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
PROJECT OWNER I NTRODUCTION
MA IN POINTS
PROJECT OWNER
THE TEAM THE TEAM DUTIES
APPROACH
The driv ing force behind the APPROACH
PROJECT OWNER construction industry. Their demands for PROJECT OWNER Developing the program and outlining
DESIGN housing, commercial facilities, industrial DESIGN the needs and requirements of the end users.
PROFESSIONAL PROFESSIONAL Determining the quantity, extent, and
products, and infrastructure are the chief
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION character of the project by defining the scope
PROFESSIONALS motiv ation to build. PROFESSIONALS
CONTRACTORS CONTRACTORS
of work.
UNDERSTANDING UNDERSTANDING
Creating the overall budget for the project,
THE DOCUMENTS THE DOCUMENTS including land acquisition (if necessary),
PROFESSIONAL PROFESSIONAL development, design, and construction costs.
Providing the funding for the project and
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://pixabay.com
making periodic payments to the designers
3
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
DESIGN I NTRODUCTION
MA IN POINTS
DESIGN
THE TEAM
APPROACH
PROFESSIONALS THE TEAM
APPROACH
PROFESSIONALS
PROJECT OWNER PROJECT OWNER
RESPONSIBILITIES
DESIGN Work together to complete the DESIGN
PROFESSIONAL PROFESSIONAL
design function with one or the other Assisting the owner in developing the
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS taking the lead, depending on the type PROFESSIONALS facility program and determining end
CONTRACTORS of facility being CONTRACTORS user needs and requirements.
UNDERSTANDING UNDERSTANDING Advising the owner regarding the image
THE DOCUMENTS
constructed. THE DOCUMENTS
PROFESSIONAL PROFESSIONAL and character of the facility and
establishing broad design goals.
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://vector-images.com
Assisting the owner in selecting products
WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS.1-2 to fit the program and the budget.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
DESIGN I NTRODUCTION
MA IN POINTS
DESIGN
THE TEAM
APPROACH
PROFESSIONALS THE TEAM
APPROACH
PROFESSIONALS
PROJECT OWNER PROJECT OWNER
ARCHITECT
RESPONSIBILITIES Licensed professionals trained in
DESIGN DESIGN
PROFESSIONAL PROFESSIONAL the art and science of building design.
Adv ising the ow ner on special and
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS aesthetic issues and generating graphic PROFESSIONALS They transform the owner’s program into
CONTRACTORS
solutions to problems. CONTRACTORS concepts and then dev elop the
UNDERSTANDING
Dev eloping the final building plans,
UNDERSTANDING concepts into building images and plans
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL construction details, and specifications. PROFESSIONAL that can be constructed by others.
CONCLUSION CONCLUSION
CEELB230
CEELB230
WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS.1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
4
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
DESIGN I NTRODUCTION
MA IN POINTS
DESIGN
THE TEAM
APPROACH
PROFESSIONALS THE TEAM
APPROACH
PROFESSIONALS
PROJECT OWNER PROJECT OWNER
CLASSIFICATION CLASSIFICATION
DESIGN DESIGN
PROFESSIONAL PROFESSIONAL
DESIGN ARCHITECTS ARCHITECTURAL TECHNICIANS
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS The creators of the aesthetic solution PROFESSIONALS They w ork from preliminary sketches
CONTRACTORS CONTRACTORS
they are the concept and idea people.
and concept drawings prov ided by the
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS Their function first and foremost is to THE DOCUMENTS design architects.
PROFESSIONAL come up w ith the creativ e expression. PROFESSIONAL
CEELB230
CEELB230
staffs through sketches and schematic
WEEKS.1-2 renderings.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS.1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
DESIGN I NTRODUCTION
MA IN POINTS
DESIGN
THE TEAM
APPROACH
PROFESSIONALS THE TEAM
APPROACH
PROFESSIONALS
PROJECT OWNER
ENGINEERS PROJECT OWNER
There are many different CLASSIFICATION
DESIGN DESIGN
PROFESSIONAL engineering specialties; the most PROFESSIONAL
STRUCTURAL ENGINEERS
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS common ones associated w ith PROFESSIONALS Design the timber, concrete, or steel
CONTRACTORS construction activ ities are described CONTRACTORS
structural systems that support a building
UNDERSTANDING next. UNDERSTANDING
and basically hold it up to withstand the
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL forces of w ind, grav ity, and seismic
CONCLUSION CONCLUSION activ ity. They design the foundations,
CEELB230
CEELB230
beams, girders, and columns that make
WEEKS.1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS.1-2 up the skeleton of the structure.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
5
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
DESIGN I NTRODUCTION
MA IN POINTS
DESIGN
THE TEAM
APPROACH
PROFESSIONALS THE TEAM
APPROACH
PROFESSIONALS
PROJECT OWNER PROJECT OWNER
CLASSIFICATION CLASSIFICATION
DESIGN DESIGN
PROFESSIONAL PROFESSIONAL
MECHANICAL ENGINEERS ELECTRICAL ENGINEERS
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS Design the heating, cooling, PROFESSIONALS Design and calculate electrical loads and
CONTRACTORS CONTRACTORS determine the circuitry, lighting, motors,
v entilating, plumbing, and fire
UNDERSTANDING UNDERSTANDING transformers, and telecommunications
THE DOCUMENTS suppression systems w ithin a building. THE DOCUMENTS needed for a building. They typically work
PROFESSIONAL They coordinate their efforts w ith the PROFESSIONAL
closely with the architect to ensure that the
CONCLUSION architectural design, the structural CONCLUSION owner’s expectations are met and often
CEELB230
CEELB230
design, and the electrical design. coordinate their efforts with the mechanical
WEEKS.
WEEKS.
7-12
1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS.1-2 engineer.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
DESIGN I NTRODUCTION
MA IN POINTS
DESIGN
THE TEAM
APPROACH
PROFESSIONALS THE TEAM
APPROACH
PROFESSIONALS
PROJECT OWNER PROJECT OWNER
LANDSCAPE ARCHITECTS
CLASSIFICATION Deal w ith the building site and
DESIGN DESIGN
PROFESSIONAL PROFESSIONAL outside env ironmental issues surrounding
CIVIL ENGINEERS
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS Design roads, bridges, tunnels, dams, site PROFESSIONALS the structure. They are inv olv ed with
CONTRACTORS drainage, parking lots, runways, and water supply CONTRACTORS such things as plantings, sidew alks,
and sewage systems. Civ il engineering,
UNDERSTANDING
considered one of the oldest engineering
UNDERSTANDING retaining w alls, and w ater features to
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL disciplines, encompasses many specialties. Civ il PROFESSIONAL enhance the project.
engineers are the ones who take the bare land
CONCLUSION CONCLUSION
CEELB230
CEELB230
and excav ate it, mov e it, drill it, and shape it to
1-2 1-2
meet the needs of the architectural design and
the construction.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
6
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
DESIGN I NTRODUCTION
MA IN POINTS
CONSTRUCTION
THE TEAM
APPROACH
PROFESSIONALS THE TEAM
APPROACH
PROFESSIONALS
PROJECT OWNER
INTERIOR DESIGNERS PROJECT OWNER
DESIGN They may be hired directly by the DESIGN The professional responsible for all
PROFESSIONAL ow ner or be a consultant to the PROFESSIONAL construction activ ities whether they work as a
general contractor, a construction manager, or
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS architect. They deal w ith the building’s PROFESSIONALS a specialty contractor. The profession of
CONTRACTORS interior finishes or schemes and make CONTRACTORS constructor includes job titles such as, but not
UNDERSTANDING decisions regarding furniture selection UNDERSTANDING limited to, project manager, general
THE DOCUMENTS THE DOCUMENTS superintendent, project
PROFESSIONAL and placement, paint colors and PROFESSIONAL
executiv e, operations
accessories, light fixtures, w indow manager, construction
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://www.clipartlogo.com
treatments, floor finishes, and ceiling manager, and chief
WEEKS.1-2 treatments.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 executiv e officer.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
CONSTRUCTION I NTRODUCTION
MA IN POINTS
GENERAL
THE TEAM
APPROACH
PROFESSIONALS THE TEAM
APPROACH
CONTRACTORS
PROJECT OWNER PROJECT OWNER
RESPONSIBILITIES Enters into a contract with the owner to deliv er
DESIGN DESIGN
PROFESSIONAL PROFESSIONAL the construction project in accordance with the
Interpret the plans and specifications and plans and specifications that hav e been prepared
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS prepare cost estimates and times schedules to PROFESSIONALS by the architects and engineers. They may or may
CONTRACTORS meet the requirements of the owner. CONTRACTORS not actually perform any of the actual construction
UNDERSTANDING Determine and implement the best UNDERSTANDING work with their own forces. W hen they do, they are
THE DOCUMENTS construction practices, means, and methods to THE DOCUMENTS said to be doing self-performed work. W hen they
PROFESSIONAL satisfy the owner’s requirements for time, cost, PROFESSIONAL don’t, they arrange for subcontractors or trade
CONCLUSION and quality. CONCLUSION contractors to perform the specialized craftwork
CEELB230
CEELB230
Oversee and manage all of the construction such as excav ation, concrete placement,
7
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
SPECIALTY I NTRODUCTION
MA IN POINTS
BUILDING TRADES
THE TEAM
APPROACH
CONTRACTORS THE TEAM
APPROACH
These are the men and w omen
PROJECT OWNER PROJECT OWNER (plumbers, electricians, ironw orkers, and
DESIGN Perform their w ork under a contract DESIGN so on) w ho actually perform the w ork.
PROFESSIONAL PROFESSIONAL
with another contractor (typically the These skilled and semi-skilled w orkers are
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS general contractor) to do a portion of PROFESSIONALS the construction industry’s most
CONTRACTORS the contractor’s w ork, as opposed to CONTRACTORS v aluable asset, although they are
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS
contracting directly w ith an ow ner. THE DOCUMENTS
rarely recognized for their
PROFESSIONAL PROFESSIONAL immense contribution.
CONCLUSION CONCLUSION
CEELB230
CEELB230
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
CONTRACT I NTRODUCTION
MA IN POINTS
FIDIC CONTRACTS
THE TEAM
A legally enforceable agreement, THE TEAM All FIDIC contracts therefore contain
APPROACH APPROACH
guidance on the preparation of Particular
PROJECT OWNER usually in written form, between two or PROJECT OWNER
Conditions, and provide examples of the areas
DESIGN more parties to do or not to do DESIGN
where special provisions may be required for a
PROFESSIONAL PROFESSIONAL
something specified. specific project. To diverge significantly from
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS PROFESSIONALS these guidelines is to increase the risk of shifting
CONTRACTORS CONTRACTORS the balanced nature of the contract, and
UNDERSTANDING UNDERSTANDING putting into jeopardy
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL
the successful
implementation
CONCLUSION CONCLUSION of the project.
CEELB230
CEELB230
ht t ps://www.pngwing.com ht t ps://www.aceris law.com
8
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
FIDIC BOOKS I NTRODUCTION
MA IN POINTS
FIDIC BOOKS
THE TEAM GREEN BOOK THE TEAM RED BOOK
APPROACH APPROACH
PROJECT OWNER The Short Form of Contract is intended for PROJECT OWNER Red Book- Conditions of Contract for
DESIGN DESIGN
PROFESSIONAL
engineering and construction projects with a PROFESSIONAL
Construction For Building and Engineering
small capital value. he Green Book Guidance works designed by the Employer .
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS Notes recommend that it not be employed on PROFESSIONALS
CONTRACTORS projects with a contract value higher than CONTRACTORS
UNDERSTANDING US$500,000. UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://www.aceris law.com ht t ps://www.aceris law.com
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
FIDIC BOOKS I NTRODUCTION
MA IN POINTS
FIDIC BOOKS
THE TEAM YELLOW BOOK THE TEAM ORANGE BOOK
APPROACH APPROACH
PROJECT OWNER provides contract conditions for construction PROJECT OWNER Orange Book- Conditions of Contract for
DESIGN DESIGN
PROFESSIONAL
works where the Contractor carries out the PROFESSIONAL
Design-Build and Turnkey. The Orange Book is
design. The Yellow Book applies to the provision intended for usage in scenarios where the
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS of mechanical and/or electrical plants, and for PROFESSIONALS contractor is solely responsible for the design.
CONTRACTORS the design and execution of engineering or CONTRACTORS Such single-point responsibility may be
UNDERSTANDING building or works.. UNDERSTANDING advantageous for the Employer, but the
THE DOCUMENTS THE DOCUMENTS benefits may be countered by having less
PROFESSIONAL PROFESSIONAL
influence over the design process and greater
CONCLUSION CONCLUSION difficulty implementing different requirements.
CEELB230
CEELB230
ht t ps://www.aceris law.com ht t ps://www.aceris law.com
9
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
FIDIC BOOKS I NTRODUCTION
MA IN POINTS
FIDIC BOOKS
THE TEAM SILVER BOOK THE TEAM GOLD BOOK
APPROACH APPROACH
PROJECT OWNER Silver Book- Conditions of Contract for PROJECT OWNER Gold Book- Conditions of Contract for Design,
DESIGN DESIGN
PROFESSIONAL
EPC/Turnkey Projects. The Silver Book is PROFESSIONAL
Build and Operate Projects. The Gold Book
appropriate for use in the process, power, and adopts a "green-field" DBO scenario with a 20-
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS private infrastructure projects where a PROFESSIONALS year operation period and a single contract
CONTRACTORS Contractor will assume complete responsibility CONTRACTORS awarded to a single contracting entity (which
UNDERSTANDING for the project's design and execution. UNDERSTANDING will almost certainly be a joint venture or
THE DOCUMENTS THE DOCUMENTS consortium) to optimize the coordination of
PROFESSIONAL PROFESSIONAL
innovation, quality, and performance.
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://www.aceris law.com ht t ps://www.aceris law.com
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
CONTRACT I NTRODUCTION
MA IN POINTS
CONTRACT
THE TEAM
APPROACH
DOCUMENTS THE TEAM
APPROACH
DOCUMENTS
PROJECT OWNER PROJECT OWNER
DESIGN The legal documents comprising a DESIGN
PROFESSIONAL construction contract, including the owner- PROFESSIONAL
contractor agreement, conditions of the
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS PROFESSIONALS
contract, and the construction drawings and
CONTRACTORS CONTRACTORS
specifications for the project,
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS including all addenda, THE DOCUMENTS
PROFESSIONAL modifications, and any PROFESSIONAL
other items stipulated as
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://www.pngwing.com being specifically
1-2 1-2
included.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
10
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
CONTRACT I NTRODUCTION
MA IN POINTS
CONTRACT
THE TEAM
APPROACH
DOCUMENTS THE TEAM
APPROACH
DOCUMENTS
PROJECT OWNER PROJECT OWNER
COMPONENTS COMPONENTS
DESIGN DESIGN
PROFESSIONAL PROFESSIONAL
DRAWINGS ARCHITECTURAL DRAWINGS
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS The portion of the contract documents PROFESSIONALS The architectural drawings are prepared by
CONTRACTORS showing in accurate graphical and pictorial CONTRACTORS the architect and usually constitute the bulk of the
UNDERSTANDING form the design, location, dimensions, and UNDERSTANDING
set. They describe the ov erall aesthetics of the
THE DOCUMENTS relationships of the elements of a project. THE DOCUMENTS facility, including project size, shape, and
PROFESSIONAL PROFESSIONAL appearance. Detailed information
CONTRACT
regarding dimensions, materials,
CONCLUSION DRAWINGS. CONCLUSION
CEELB230
CEELB230
ht t p://www.livebinders .com ht t p://www.livebinders .com and quality are graphically
CONSTRUCTION
1-2 1-2
depicted through the
DRAWINGS. architectural drawings.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
ARCHITECTURAL I NTRODUCTION
MA IN POINTS
CONTRACT
THE TEAM
APPROACH
DRAWING VICINITY MAP/ LOCATION PLAN
THE TEAM
APPROACH
DOCUMENTS
PROJECT OWNER PROJECT OWNER
SITE DEVELOPMENT PLAN COMPONENTS
DESIGN PERSPECTIVE DESIGN
PROFESSIONAL PROFESSIONAL
FLOOR PLANS STRUCTURAL DRAWINGS
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS
ELEVATIONS PROFESSIONALS The structural drawings are prepared by a
CONTRACTORS
SECTIONS CONTRACTORS structural engineer working as a consultant to
UNDERSTANDING
REFLECTED UNDERSTANDING the architect. The structural drawings identify
THE DOCUMENTS CEILING PLANS THE DOCUMENTS the major components making up the
PROFESSIONAL DETAILS PROFESSIONAL
structural frame of the
SCHEDULE OF
CONCLUSION CONCLUSION building, such as columns,
CEELB230
CEELB230
https://www.cadtraininginstitute.com DOORS AND W INDOW S ht t p://www.livebinders .com
beams, and girders.
1-2 1-2
SCHEDULE OF
FINISHES
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
11
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
CONTRACT I NTRODUCTION
MA IN POINTS
CIVIL/STRUCTURAL
THE TEAM
APPROACH
DOCUMENTS THE TEAM
APPROACH
DRAWING
SI TE DEVELOPMENT PLAN
PROJECT OWNER PROJECT OWNER
COMPONENTS FOUNDATI ON PLANS AND DETAI LS
DESIGN DESIGN
PROFESSIONAL
CIVIL DRAWINGS
PROFESSIONAL FLOOR FRAMI NG
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS These drawings are usually prepared by a PROFESSIONALS
PLANS AND DETAI LS
CONTRACTORS civil engineer working with the architect and CONTRACTORS ROOF FRAMI NG
UNDERSTANDING describe all items of work associated with the UNDERSTANDING PLANS AND DETAI LS
THE DOCUMENTS site. The site work includes such things as THE DOCUMENTS
PROFESSIONAL PROFESSIONAL
grading, demolition,
CONCLUSION excavation, site utilities, CONCLUSION
CEELB230
CEELB230
ht t ps://www.pngegg.com
streets, curbs, and
WEEKS. 1-2
ht t p://www.livebinders .com
gutters and their details.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
CONTRACT I NTRODUCTION
MA IN POINTS
ELECTRICAL
THE TEAM
APPROACH
DOCUMENTS THE TEAM
APPROACH
DRAWING
PROJECT OWNER PROJECT OWNER
LOCATI ON AND SI TE PLAN
COMPONENTS LEGEND OR SYMBOLS
DESIGN DESIGN
PROFESSIONAL
ELECTRICAL DRAWINGS
PROFESSIONAL GENERAL NOTES
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS The electrical engineer, working as a PROFESSIONALS ELECTRI CAL LAYOUTS
CONTRACTORS consultant to the architect, prepares the electrical CONTRACTORS SCHEDULE OF LOADS,
drawings. The electrical work includes all of the
UNDERSTANDING UNDERSTANDING TRANSFORMERS,
THE DOCUMENTS rough wiring, transformers, and panel boxes, as THE DOCUMENTS
PROFESSIONAL well as receptacles, switches, PROFESSIONAL GENERATI NG/
and light fixtures. U.P.S. UNI TS
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t p://www.livebinders .com Communications and computer ht t ps://www.dos ign.com
ONE LI NE
1-2 1-2
wiring are also included in
DI AGRAM
the electrical drawings.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
12
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
CONTRACT I NTRODUCTION
MA IN POINTS
MECHANICAL
THE TEAM
APPROACH
DOCUMENTS THE TEAM
APPROACH
DRAWING
PROJECT OWNER PROJECT OWNER
LOCATI ON PLAN AND KEY PLAN
COMPONENTS GENERAL LAYOUT PLANS
DESIGN DESIGN
PROFESSIONAL
MECHANICAL DRAWINGS
PROFESSIONAL LONGI TUDI NAL AND
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS
The mechanical w ork splits betw een two major support
PROFESSIONALS
TRANSVERSE SECTI ONS
components for any building - the plumbing and the
CONTRACTORS heating, ventilation, and air conditioning (HVAC). The CONTRACTORS I SOMETRI C
UNDERSTANDING plumbing portion of the draw ings typically includes UNDERSTANDING DRAWI NGS
THE DOCUMENTS information describing the installation of w ater lines, sew er THE DOCUMENTS
PROFESSIONAL lines, and gas lines. The HVAC portion of the draw ings covers PROFESSIONAL
PLANS
ductw ork, air handlers, compressors, and other DETAI LED
CONCLUSION equipment associated w ith climate CONCLUSION
CEELB230
CEELB230
ht t p://www.livebinders .com
control. Fire protection can also
https://www.ukconstructionmedia.co.uk
DRAWI NGS
1-2 1-2
be included w ith the
WEEKS. mechanical draw ings.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
PLUMBING I NTRODUCTION
MA IN POINTS
SANITARY DRAWING
LOCATI ON PLAN
THE TEAM
APPROACH
DRAWING THE TEAM
APPROACH
AND SI TE PLAN
PROJECT OWNER
LOCATI ON PLAN PROJECT OWNER
DETAI LED PLAN AND
DESIGN AND SI TE PLAN DESIGN LAYOUT DRAWI NGS
PROFESSIONAL PLUMBI NG PROFESSIONAL
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS
PLANS, LAYOUTS, PROFESSIONALS
CONTRACTORS AND DETAI LS CONTRACTORS
UNDERSTANDING LEGEND AND UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL
GENERAL NOTES PROFESSIONAL
I SOMETRI C
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://www.reddit.com
DRAWI NGS ht t ps://www.i-green.my
13
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
ELECTRONICS I NTRODUCTION
MA IN POINTS
GEODETIC DRAWING
VI CI NITY MAP/ LOCATI ON MAP
THE TEAM
APPROACH
DRAWING THE TEAM
APPROACH
LOT PLAN
PROJECT OWNER
GENERAL LAYOUT PLANS PROJECT OWNER
RELOCATI ON SURVEY PLAN
DESIGN WI TH LEGENDS DESIGN LI NE AND GRADE
PROFESSIONAL SI NGLE LI NE DI AGRAM PROFESSIONAL DETAI LED
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS
RI SER DI AGRAM PROFESSIONALS
TOPOGRAPHI C
CONTRACTORS I SOMETRY CONTRACTORS PLAN
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://www.sciencenewsforstud
ht t ps://www.buildas iabd.com
ent s .org
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
CONTRACT I NTRODUCTION
MA IN POINTS
PROJECT MANUAL
THE TEAM
APPROACH
DOCUMENTS THE TEAM
APPROACH
SECTIONS
PROJECT OWNER
COMPONENTS PROJECT OWNER BIDDING DOCUMENTS
DESIGN DESIGN I NVI TATI ON FOR BI DS
PROFESSIONAL PROFESSIONAL
PROJECT MANUAL I NSTRUCTI ON TO BI DDERS
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
The project manual is the second part of the
PROFESSIONALS PROFESSIONALS BI D FORMS
CONTRACTORS contract documents. The project manual contains CONTRACTORS
all the written construction documents about the
AGREEMENT FORM
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS structure to be built. Those documents include THE DOCUMENTS
PROFESSIONAL the bidding requirements, PROFESSIONAL
contracting requirements,
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t p://www.livebinders .com and written specifications for ht t ps://npo.gov.ph Sa mpl e Bidding Documents:
1-2 1-2
ev ery detail of the building. Invi ta tion to bi d.pdf
14
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
PROJECT MANUAL I NTRODUCTION
MA IN POINTS
PROJECT MANUAL
THE TEAM SECTIONS THE TEAM SECTIONS
APPROACH APPROACH
PROJECT OWNER GENERAL CONDITIONS PROJECT OWNER GENERAL CONDITIONS
DESIGN GENERAL PROVISIONS DESIGN PAYMENTS AND COMPLETION
PROFESSIONAL OWNER RESPONSIBILITIES PROFESSIONAL PROTECTION OF PERSONS
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONTRACTOR RESPONSIBILITIES CONSTRUCTION AND PROPERTY
PROFESSIONALS PROFESSIONALS
ADMINISTRATION OF THE CONTRACT INSURANCE AND BONDS
CONTRACTORS CONTRACTORS
SUBCONTRACTS AND UNCOVERING AND
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS
SUBCONTRACTOR RELATIONS THE DOCUMENTS
CORRECTION OF WORK
PROFESSIONAL SAMPLE: 22-00071-
CONSTRUCTION BY OWNER PROFESSIONAL MISCELLANEOUS PROVISIONS
PROPOSED-CONSTRUCTION- OR OTHERS TERMINATION OR
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://www.ccicsg.com OF-THREE-3-–-STOREY- CHANGES IN THE WORK ht t ps://www.ccicsg.com SUSPENSION OF
1-2 1-2
MULTI-PURPOSE-BUILDING-
PHASE-1-AT-BARANGAY- TIME AND SCHEDULE THE CONTRACT
REQUIREMENTS
WEEKS. PROJECT-6.pdf
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
PROJECT MANUAL I NTRODUCTION
MA IN POINTS
PROJECT MANUAL
THE TEAM SECTIONS THE TEAM SECTIONS
APPROACH APPROACH
PROJECT OWNER SUPPLEMENTAL CONDITIONS PROJECT OWNER TECHNICAL SPECIFICATIONS
DESIGN
Soils and soil-testing information DESIGN
PROFESSIONAL
prov ided by the owner.
PROFESSIONAL
Quality of materials.
Surv ey information provided by the owner. Standard of w orkmanship.
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
Materials or other serv ices
PROFESSIONALS
prov ided by the owner.
PROFESSIONALS Methods of installation
CONTRACTORS CONTRACTORS
Job signage requirements.
and erection.
UNDERSTANDING Traffic control and pedestrian UNDERSTANDING
THE DOCUMENTS safety requirements. THE DOCUMENTS Quality control
PROFESSIONAL Phasing or special schedule PROFESSIONAL and quality
requirements. assurance
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://www.ccicsg.com Requirements for security. ht t ps://apro-s oftware.com
procedures.
1-2 1-2
Temporary facilities and
sanitation requirements.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
15
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
SPECIFICATIONS I NTRODUCTION
MA IN POINTS
SPECIFICATIONS
THE TEAM THE TEAM TYPES
APPROACH
The part of the contract APPROACH
PROJECT OWNER documents consisting of a detailed PROJECT OWNER PERFORMANCE SPECI FI CATI ON
DESIGN description of the technical nature of the DESIGN DESCRI PTI VE SPECI FI CATI ON
PROFESSIONAL PROFESSIONAL
materials, standards, and quality of REFERENCE SPECI FI CATI ON
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS execution of the work to be placed PROFESSIONALS PROPRI ETARY SPECI FI CATI ON
CONTRACTORS under contract. CONTRACTORS
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t ps://www.clipartkey.com https://imelearner.wordpress.com
ht t ps://www.123rf.com
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
SPECIFICATIONS I NTRODUCTION
MA IN POINTS
SPECIFICATIONS
THE TEAM TYPES THE TEAM TYPES
APPROACH APPROACH
PROJECT OWNER DESCRIPTIVE SPECIFICATION PROJECT OWNER PERFORMANCE SPECIFICATION
DESIGN DESIGN
PROFESSIONAL PROFESSIONAL
- Defines properties of materials -Specifies required results and
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS and methods of installation PROFESSIONALS criteria used to v erify
CONTRACTORS CONTRACTORS
w ithout propriety information.
performance. The contractor is
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS free to find materials complying
PROFESSIONAL PROFESSIONAL w ith the performance criteria.
CONCLUSION CONCLUSION
CEELB230
CEELB230
https://imelearner.wordpress.com https://imelearner.wordpress.com
16
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
SPECIFICATIONS I NTRODUCTION
MA IN POINTS
SPECIFICATIONS
THE TEAM TYPES THE TEAM TYPES
APPROACH APPROACH
PROJECT OWNER REFERENCE SPECIFICATION PROJECT OWNER PROPRIETARY SPECIFICATION
DESIGN DESIGN
PROFESSIONAL PROFESSIONAL
-Requires products or process to -specifies brand names, models
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS meet established standards. PROFESSIONALS and other proprietary
CONTRACTORS CONTRACTORS
information.
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL
CONCLUSION CONCLUSION
CEELB230
CEELB230
https://imelearner.wordpress.com https://imelearner.wordpress.com
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
1995 CSI I NTRODUCTION
MA IN POINTS
1995 CSI
THE TEAM
APPROACH
MASTERFORMAT THE TEAM
APPROACH
MASTERFORMAT
PROJECT OWNER PROJECT OWNER 16-DIVISION UNIFORM
DESIGN A format developed by the DESIGN CONSTRUCTION INDEX
PROFESSIONAL Construction Specifications Institute for PROFESSIONAL
Division 1: General
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
coordinating specifications, filing of
PROFESSIONALS PROFESSIONALS Requirements
CONTRACTORS technical data and product literature, and CONTRACTORS
Division 2: Site Work
UNDERSTANDING construction cost accounting, organized UNDERSTANDING
THE DOCUMENTS into 16 divisions based THE DOCUMENTS Division 3: Concrete
PROFESSIONAL
on an interrelationship
PROFESSIONAL Division 4: Masonry
CONCLUSION of material, trade, CONCLUSION
CEELB230
CEELB230
ht t p://www.livebinders .com ht t p://clipart -library.com
1-2 1-2
or function.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
17
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
1995 CSI I NTRODUCTION
MA IN POINTS
1995 CSI
THE TEAM
APPROACH
MASTERFORMAT THE TEAM
APPROACH
MASTERFORMAT
PROJECT OWNER 16-DIVISION UNIFORM PROJECT OWNER 16-DIVISION UNIFORM
DESIGN CONSTRUCTION INDEX DESIGN CONSTRUCTION INDEX
PROFESSIONAL PROFESSIONAL
Division 5: Metals Division 9: Finishes
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS Division 6: Wood and PROFESSIONALS Division 10: Specialties
CONTRACTORS CONTRACTORS
Plastics
Division 11: Equipment
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS Division 7: Thermal and THE DOCUMENTS Division 12: Furnishings
PROFESSIONAL Moisture Protection PROFESSIONAL
CEELB230
CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com
Windows
WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
1995 CSI I NTRODUCTION
MA IN POINTS
THREE-PART
THE TEAM
APPROACH
MASTERFORMAT THE TEAM
APPROACH
SECTION FORMAT
PROJECT OWNER 16-DIVISION UNIFORM PROJECT OWNER
PARTS
DESIGN CONSTRUCTION INDEX DESIGN
PROFESSIONAL PROFESSIONAL
Division 13: Special PART 1: General
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS Construction PROFESSIONALS PART 2: Products
CONTRACTORS CONTRACTORS
Division 14: Conv eying
PART 3: Execution
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS Systems THE DOCUMENTS
PROFESSIONAL Division 15: Mechanical PROFESSIONAL
CEELB230
ht t p://clipart -library.com ht t ps://depos itphotos.com
18
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
THREE-PART I NTRODUCTION
MA IN POINTS
THREE-PART
THE TEAM
APPROACH
SECTION FORMAT THE TEAM
APPROACH
SECTION FORMAT
PROJECT OWNER PROJECT OWNER
PARTS PARTS
DESIGN DESIGN
PROFESSIONAL PROFESSIONAL
PART 1: General PART 2: Product
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS PROFESSIONALS
CONTRACTORS CONTRACTORS
Defines the specific
Describes, in details the
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS and procedural THE DOCUMENTS quality of items that
PROFESSIONAL requirements unique to PROFESSIONAL are required for
CONCLUSION this section. CONCLUSION incorporation into the
CEELB230
CEELB230
ht t ps://depos itphotos.com ht t ps://depos itphotos.com
project under this
WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 section.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
THREE-PART I NTRODUCTION
MA IN POINTS
2004 CSI
THE TEAM
APPROACH
SECTION FORMAT THE TEAM
APPROACH
MASTERFORMAT
PROJECT OWNER PROJECT OWNER
PARTS In 2001, a task team with associates from both
DESIGN DESIGN
PROFESSIONAL PROFESSIONAL the CSI and the Construction Specifications Canada
PART 3: Execution (CSC) was charged with examining whether there
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS PROFESSIONALS was a need to rev ise and possibly expand the 16
CONTRACTORS CONTRACTORS div ision edition in response to the many changes that
Describes, in details the
had taken place in the industry. The 2004 v ersion
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS preparatory actions THE DOCUMENTS composed of
PROFESSIONAL and how the products PROFESSIONAL (1) General Requirements,
(2) Facility Construction,
CONCLUSION are incorporated into CONCLUSION
CEELB230
CEELB230
ht t ps://depos itphotos.com ht t p://www.livebinders .com (3) Facility Services,
project.
1-2 1-2
(4) Site and Infrastructure,
and (5) Process Equipment.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
19
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
2004 CSI I NTRODUCTION
MA IN POINTS
2004 CSI
THE TEAM
APPROACH
MASTERFORMAT THE TEAM
APPROACH
MASTERFORMAT
PROJECT OWNER PROJECT OWNER
ADVANTAGES ADVANTAGES
DESIGN DESIGN
PROFESSIONAL PROFESSIONAL
Provides a standard
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS fixed framework for PROFESSIONALS Serves as a
CONTRACTORS CONTRACTORS
organizing
sequencing guide for
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS specifications. THE DOCUMENTS arranging
PROFESSIONAL PROFESSIONAL specification section
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
2004 CSI I NTRODUCTION
MA IN POINTS
2004 CSI
THE TEAM
APPROACH
MASTERFORMAT THE TEAM
APPROACH
MASTERFORMAT
PROJECT OWNER PROJECT OWNER GENERAL REQUIREMENTS
ADVANTAGES
DESIGN DESIGN SUB-GROUP
PROFESSIONAL PROFESSIONAL
Division 1: General
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS Provides easy PROFESSIONALS Requirements
CONTRACTORS CONTRACTORS
retrieval of
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS information THE DOCUMENTS
PROFESSIONAL PROFESSIONAL
CONCLUSION CONCLUSION
CEELB230
CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com
20
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
2004 CSI I NTRODUCTION
MA IN POINTS
2004 CSI
THE TEAM
APPROACH
MASTERFORMAT THE TEAM
APPROACH
MASTERFORMAT
PROJECT OWNER FACILITY CONSTRUCTION PROJECT OWNER FACILITY CONSTRUCTION
DESIGN SUB-GROUP DESIGN SUB-GROUP
PROFESSIONAL PROFESSIONAL
Division 2: Existing Conditions Division 9: Finishes
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS Division 3: Concrete PROFESSIONALS Division 10: Specialties
CONTRACTORS Division 4: Masonry CONTRACTORS Division 11: Equipment
UNDERSTANDING Division 5: Metals UNDERSTANDING Division 12: Furnishings
THE DOCUMENTS Division 6: Wood, Plastics, THE DOCUMENTS Division 13: Special
PROFESSIONAL PROFESSIONAL
and Composites Construction
CONCLUSION Division 7: Thermal and CONCLUSION Division 14: Conveying
CEELB230
CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com
Moisture Protection Systems
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
2004 CSI I NTRODUCTION
MA IN POINTS
2004 CSI
THE TEAM
APPROACH
MASTERFORMAT THE TEAM
APPROACH
MASTERFORMAT
PROJECT OWNER FACILITY SERVICES PROJECT OWNER FACILITY SERVICES
DESIGN SUB-GROUP DESIGN SUB-GROUP
PROFESSIONAL PROFESSIONAL
Division 20: (Reserv ed) Division 25: I ntegrated
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS Division 21: Fire Supression PROFESSIONALS Automation
CONTRACTORS CONTRACTORS
Division 22: Plumbing
Divisions 26: Electrical
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS Division 23: Heating, THE DOCUMENTS Division 27: Communications
PROFESSIONAL Ventilating, and PROFESSIONAL Division 28: Electronic
CONCLUSION Air Conditioning CONCLUSION Safety and Security
CEELB230
CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com
Division 24: (Reserv ed) Division 29: (Reserv ed)
WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
21
Wednesday, November 13, 2019
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
2004 CSI I NTRODUCTION
MA IN POINTS
2004 CSI
THE TEAM
APPROACH
MASTERFORMAT THE TEAM
APPROACH
MASTERFORMAT
PROJECT OWNER SITE AND INFRASTRUCTURE PROJECT OWNER PROCESS EQUIPMENT
DESIGN SUB-GROUP DESIGN SUB-GROUP
PROFESSIONAL PROFESSIONAL
Division 30: (Reserved) Divisions 40 - 43: Process I ntegration,
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS Divisions 31: Earthwork PROFESSIONALS Material Processing and Handling
CONTRACTORS Division 32: Exterior CONTRACTORS
Equipment; Process Heating,
UNDERSTANDING Improvements UNDERSTANDING
THE DOCUMENTS Division 33: Utilities THE DOCUMENTS Cooling, and Drying
PROFESSIONAL
Division 34: Transportation
PROFESSIONAL Equipment; and Process
CONCLUSION Division 35: Waterway and CONCLUSION Gas and Liquid Handling,
CEELB230
CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com
Marine Construction Purification, and
WEEKS. 1-2 Divisions 36 - 39: (Reserved)
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 Storage Equipment
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
MAIN POINTS
2004 CSI I NTRODUCTION
MA IN POINTS
REFERENCES
MASTERFORMAT
Jackson, B.J. (2010). Construction Management
THE TEAM THE TEAM JumpStart. (2nd Edition). Indianapolis, Indiana: W iley
APPROACH APPROACH Publishing, Inc.
PROJECT OWNER PROCESS EQUIPMENT PROJECT OWNER
DESIGN SUB-GROUP DESIGN
PROFESSIONAL PROFESSIONAL
Divisions 44: Pollution
SPECIALIZATION 3
SPECIALIZATION 3
CONSTRUCTION CONSTRUCTION
PROFESSIONALS Control Equipment PROFESSIONALS
CONTRACTORS CONTRACTORS
Division 45: I ndustry-Specific
UNDERSTANDING UNDERSTANDING
THE DOCUMENTS Manufacturing Equipment THE DOCUMENTS
PROFESSIONAL Divisions 46 - 47: (Reserv ed) PROFESSIONAL
CEELB230
ht t p://clipart -library.com
Power Generation
WEEKS. 1-2 Division 49: (Reserv ed)
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
22