COURSE TOPICS

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

LECTURE 1 : MA IN POINTS

INTRODUCTION TO  THE TEAM


APPROACH
WEEK
NO.
COURSE TOPICS FOR MIDTERM PERIOD

CONSTRUCTION  PROJECT OWNER


DESIGN
1 Introduction to Contract

PROJECT

Administrations
PROFESSIONAL
2 The teams players roles and
CONTRACT

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION
PROFESSIONALS responsibilities

ADMINISTRATION 

CONTRACTORS
UNDERSTANDING
THE DOCUMENTS
3
4
Pre-construction Submittals
Types of Meetings
PROFESSIONAL 5 Submittals
6 Site Visit, Observ ations and Inspection
CONCLUSION

CEELB230

CEELB230
PROJECT M ANAGEM ENT ht t ps://www.gograph.com
7 MIDTERM EXAM

1-2 1-2
Engr. Debbie Lyn Cabacungan, MSc.CM
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0.

COURSE TOPICS
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
I NTRODUCTION

MA IN POINTS
GRADING SYSTEM
 THE TEAM WEEK  THE TEAM
APPROACH
COURSE TOPICS FOR MIDTERM PERIOD APPROACH
NO.
 PROJECT OWNER  PROJECT OWNER CLASS STANDING:
8 Interpretations and Modifications of
 DESIGN  DESIGN
contracts
PROFESSIONAL PROFESSIONAL
9 Executing the works Quizzes - 60%
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS PROFESSIONALS
 CONTRACTORS
10 Claims and Disputes
 CONTRACTORS
Term Paper; Case Studies
11 Measurement and Payment
 UNDERSTANDING  UNDERSTANDING (Individual / Group) – 25%
THE DOCUMENTS 12 Quality Control and Quality Assurance THE DOCUMENTS
PROFESSIONAL 13 Project Close-out PROFESSIONAL Recitation;Attendance– 15%
CONCLUSION 13.5 Final Exam CONCLUSION 100%
CEELB230

CEELB230
ht t ps://www.gograph.com
ht t ps://www.gograph.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0. WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0.

1
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION
CONSTRUCTION I NTRODUCTION
CONSTRUCTION CONTRACT
MAIN POINTS MA IN POINTS
ADMINISTRATION vs.
 THE TEAM
APPROACH
CONTRACT  THE TEAM
APPROACH CONSTRUCTION


PROJECT OWNER
DESIGN
PROFESSIONAL
ADMINISTRATION 

PROJECT OWNER
DESIGN
PROFESSIONAL
MANAGEMENT
involves the activities necessary to effect and
CONSTRUCTION Contract Administration

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS
determine the fulfillment of the contract PROFESSIONALS
requirements by the parties to the construction activities related to administering the
 CONTRACTORS  CONTRACTORS contract for construction, typically
UNDERSTANDING contract. UNDERSTANDING
  performed by the A/E.
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL
Construction management is a delivery
CONCLUSION CONCLUSION method.

CEELB230

CEELB230
ht t ps://www.gograph.com ht t ps://www.gograph.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0. WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

I NTRODUCTION
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
BENEFITS OF MA IN POINTS OBSTACLE WORKING
 THE TEAM
APPROACH
WORKING AS A  THE TEAM
APPROACH AS A TEAM
TEAM
 PROJECT OWNER
 PROJECT OWNER
 DESIGN
 DESIGN
PROFESSIONAL
PROFESSIONAL
 CONSTRUCTION Adv ersarial relationships/personalities
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION
PROFESSIONALS Better communication and coordination PROFESSIONALS I ncomplete or inaccurate contract
CONTRACTORS
 CONTRACTORS I ncreased productiv ity 
documents
 UNDERSTANDING
 UNDERSTANDING Reduced project costs THE DOCUMENTS Unreasonable schedule requirements
THE DOCUMENTS
PROFESSIONAL Earlier project completion PROFESSIONAL Unplanned or inordinate number of
I mprov ed project team morale CONCLUSION changes to the project scope
CONCLUSION
CEELB230

CEELB230
ht t ps://media4.giphy.com Fewer claims and delays ht t ps://www. media4.giphy.com
Labor issues

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

2
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
OBSTACLE WORKING I NTRODUCTION

MA IN POINTS
PROJECT PLAYERS
 THE TEAM
APPROACH
AS A TEAM  THE TEAM
APPROACH
Entities who make a valuable contribution
to the effort while at the same time adding to
 PROJECT OWNER  PROJECT OWNER the complexity of the process. It is very important
 DESIGN  DESIGN to understand the various roles and
PROFESSIONAL Delays in product fabrication or PROFESSIONAL
responsibilities of these many players as they

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS deliv ery PROFESSIONALS influence the construction management
 CONTRACTORS Poor communications  CONTRACTORS process.
 UNDERSTANDING Delays caused by ineffectiv e  UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL management PROFESSIONAL

CONCLUSION CONCLUSION

CEELB230

CEELB230
ht t ps://www.gograph.com
ht t ps://https://cpmiteam.com/

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0


D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
PROJECT OWNER I NTRODUCTION

MA IN POINTS
PROJECT OWNER
 THE TEAM  THE TEAM DUTIES
APPROACH
The driv ing force behind the APPROACH
 PROJECT OWNER construction industry. Their demands for  PROJECT OWNER Developing the program and outlining
 DESIGN housing, commercial facilities, industrial  DESIGN the needs and requirements of the end users.
PROFESSIONAL PROFESSIONAL Determining the quantity, extent, and
products, and infrastructure are the chief
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION character of the project by defining the scope
PROFESSIONALS motiv ation to build. PROFESSIONALS
 CONTRACTORS  CONTRACTORS
of work.
 UNDERSTANDING  UNDERSTANDING
Creating the overall budget for the project,
THE DOCUMENTS THE DOCUMENTS including land acquisition (if necessary),
PROFESSIONAL PROFESSIONAL development, design, and construction costs.
Providing the funding for the project and
CONCLUSION CONCLUSION
CEELB230

CEELB230
ht t ps://pixabay.com
making periodic payments to the designers

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 and the contractor.


||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

3
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
DESIGN I NTRODUCTION

MA IN POINTS
DESIGN
 THE TEAM
APPROACH
PROFESSIONALS  THE TEAM
APPROACH
PROFESSIONALS
 PROJECT OWNER  PROJECT OWNER
RESPONSIBILITIES
 DESIGN Work together to complete the  DESIGN
PROFESSIONAL PROFESSIONAL
design function with one or the other Assisting the owner in developing the

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS taking the lead, depending on the type PROFESSIONALS facility program and determining end
 CONTRACTORS of facility being  CONTRACTORS user needs and requirements.
 UNDERSTANDING  UNDERSTANDING Advising the owner regarding the image
THE DOCUMENTS
constructed. THE DOCUMENTS
PROFESSIONAL PROFESSIONAL and character of the facility and
establishing broad design goals.
CONCLUSION CONCLUSION

CEELB230

CEELB230
ht t ps://vector-images.com
Assisting the owner in selecting products

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS.1-2 to fit the program and the budget.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
DESIGN I NTRODUCTION

MA IN POINTS
DESIGN
 THE TEAM
APPROACH
PROFESSIONALS  THE TEAM
APPROACH
PROFESSIONALS
 PROJECT OWNER  PROJECT OWNER
ARCHITECT
RESPONSIBILITIES Licensed professionals trained in
 DESIGN  DESIGN
PROFESSIONAL PROFESSIONAL the art and science of building design.
Adv ising the ow ner on special and
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS aesthetic issues and generating graphic PROFESSIONALS They transform the owner’s program into
 CONTRACTORS
solutions to problems.  CONTRACTORS concepts and then dev elop the
 UNDERSTANDING
Dev eloping the final building plans,
 UNDERSTANDING concepts into building images and plans
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL construction details, and specifications. PROFESSIONAL that can be constructed by others.
CONCLUSION CONCLUSION
CEELB230

CEELB230
WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS.1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

4
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
DESIGN I NTRODUCTION

MA IN POINTS
DESIGN
 THE TEAM
APPROACH
PROFESSIONALS  THE TEAM
APPROACH
PROFESSIONALS
 PROJECT OWNER  PROJECT OWNER
CLASSIFICATION CLASSIFICATION
 DESIGN  DESIGN
PROFESSIONAL PROFESSIONAL
DESIGN ARCHITECTS ARCHITECTURAL TECHNICIANS

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS The creators of the aesthetic solution PROFESSIONALS They w ork from preliminary sketches
CONTRACTORS CONTRACTORS

they are the concept and idea people. 
and concept drawings prov ided by the
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS Their function first and foremost is to THE DOCUMENTS design architects.
PROFESSIONAL come up w ith the creativ e expression. PROFESSIONAL

CONCLUSION They conv ey their ideas to their design CONCLUSION

CEELB230

CEELB230
staffs through sketches and schematic
WEEKS.1-2 renderings.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS.1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
DESIGN I NTRODUCTION

MA IN POINTS
DESIGN
 THE TEAM
APPROACH
PROFESSIONALS  THE TEAM
APPROACH
PROFESSIONALS
 PROJECT OWNER
ENGINEERS  PROJECT OWNER
There are many different CLASSIFICATION
 DESIGN  DESIGN
PROFESSIONAL engineering specialties; the most PROFESSIONAL
STRUCTURAL ENGINEERS
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS common ones associated w ith PROFESSIONALS Design the timber, concrete, or steel
 CONTRACTORS construction activ ities are described  CONTRACTORS
structural systems that support a building
 UNDERSTANDING next.  UNDERSTANDING
and basically hold it up to withstand the
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL forces of w ind, grav ity, and seismic
CONCLUSION CONCLUSION activ ity. They design the foundations,
CEELB230

CEELB230
beams, girders, and columns that make
WEEKS.1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS.1-2 up the skeleton of the structure.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

5
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
DESIGN I NTRODUCTION

MA IN POINTS
DESIGN
 THE TEAM
APPROACH
PROFESSIONALS  THE TEAM
APPROACH
PROFESSIONALS
 PROJECT OWNER  PROJECT OWNER
CLASSIFICATION CLASSIFICATION
 DESIGN  DESIGN
PROFESSIONAL PROFESSIONAL
MECHANICAL ENGINEERS ELECTRICAL ENGINEERS

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS Design the heating, cooling, PROFESSIONALS Design and calculate electrical loads and
CONTRACTORS CONTRACTORS determine the circuitry, lighting, motors,

v entilating, plumbing, and fire 
 UNDERSTANDING  UNDERSTANDING transformers, and telecommunications
THE DOCUMENTS suppression systems w ithin a building. THE DOCUMENTS needed for a building. They typically work
PROFESSIONAL They coordinate their efforts w ith the PROFESSIONAL
closely with the architect to ensure that the
CONCLUSION architectural design, the structural CONCLUSION owner’s expectations are met and often

CEELB230

CEELB230
design, and the electrical design. coordinate their efforts with the mechanical
WEEKS.
WEEKS.
7-12
1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS.1-2 engineer.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
DESIGN I NTRODUCTION

MA IN POINTS
DESIGN
 THE TEAM
APPROACH
PROFESSIONALS  THE TEAM
APPROACH
PROFESSIONALS
 PROJECT OWNER  PROJECT OWNER
LANDSCAPE ARCHITECTS
CLASSIFICATION Deal w ith the building site and
 DESIGN  DESIGN
PROFESSIONAL PROFESSIONAL outside env ironmental issues surrounding
CIVIL ENGINEERS
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS Design roads, bridges, tunnels, dams, site PROFESSIONALS the structure. They are inv olv ed with
 CONTRACTORS drainage, parking lots, runways, and water supply  CONTRACTORS such things as plantings, sidew alks,
and sewage systems. Civ il engineering,
 UNDERSTANDING
considered one of the oldest engineering
 UNDERSTANDING retaining w alls, and w ater features to
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL disciplines, encompasses many specialties. Civ il PROFESSIONAL enhance the project.
engineers are the ones who take the bare land
CONCLUSION CONCLUSION
CEELB230

CEELB230
and excav ate it, mov e it, drill it, and shape it to

1-2 1-2
meet the needs of the architectural design and
the construction.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

6
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
DESIGN I NTRODUCTION

MA IN POINTS
CONSTRUCTION
 THE TEAM
APPROACH
PROFESSIONALS  THE TEAM
APPROACH
PROFESSIONALS
 PROJECT OWNER
INTERIOR DESIGNERS  PROJECT OWNER
 DESIGN They may be hired directly by the  DESIGN The professional responsible for all
PROFESSIONAL ow ner or be a consultant to the PROFESSIONAL construction activ ities whether they work as a
general contractor, a construction manager, or

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS architect. They deal w ith the building’s PROFESSIONALS a specialty contractor. The profession of
 CONTRACTORS interior finishes or schemes and make  CONTRACTORS constructor includes job titles such as, but not
 UNDERSTANDING decisions regarding furniture selection  UNDERSTANDING limited to, project manager, general
THE DOCUMENTS THE DOCUMENTS superintendent, project
PROFESSIONAL and placement, paint colors and PROFESSIONAL
executiv e, operations
accessories, light fixtures, w indow manager, construction
CONCLUSION CONCLUSION

CEELB230

CEELB230
ht t ps://www.clipartlogo.com
treatments, floor finishes, and ceiling manager, and chief

WEEKS.1-2 treatments.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 executiv e officer.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
CONSTRUCTION I NTRODUCTION

MA IN POINTS
GENERAL
 THE TEAM
APPROACH
PROFESSIONALS  THE TEAM
APPROACH
CONTRACTORS
 PROJECT OWNER  PROJECT OWNER
RESPONSIBILITIES Enters into a contract with the owner to deliv er
 DESIGN  DESIGN
PROFESSIONAL PROFESSIONAL the construction project in accordance with the
Interpret the plans and specifications and plans and specifications that hav e been prepared
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS prepare cost estimates and times schedules to PROFESSIONALS by the architects and engineers. They may or may
 CONTRACTORS meet the requirements of the owner.  CONTRACTORS not actually perform any of the actual construction
 UNDERSTANDING Determine and implement the best  UNDERSTANDING work with their own forces. W hen they do, they are
THE DOCUMENTS construction practices, means, and methods to THE DOCUMENTS said to be doing self-performed work. W hen they
PROFESSIONAL satisfy the owner’s requirements for time, cost, PROFESSIONAL don’t, they arrange for subcontractors or trade
CONCLUSION and quality. CONCLUSION contractors to perform the specialized craftwork
CEELB230

CEELB230
Oversee and manage all of the construction such as excav ation, concrete placement,

WEEKS.1-2 operations into a single, safe coordinated effort.


||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS.
WEEKS.
7-12
1-2
painting, or plumbing.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

7
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
SPECIALTY I NTRODUCTION

MA IN POINTS
BUILDING TRADES
 THE TEAM
APPROACH
CONTRACTORS  THE TEAM
APPROACH
These are the men and w omen
 PROJECT OWNER  PROJECT OWNER (plumbers, electricians, ironw orkers, and
 DESIGN Perform their w ork under a contract  DESIGN so on) w ho actually perform the w ork.
PROFESSIONAL PROFESSIONAL
with another contractor (typically the These skilled and semi-skilled w orkers are

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS general contractor) to do a portion of PROFESSIONALS the construction industry’s most
 CONTRACTORS the contractor’s w ork, as opposed to  CONTRACTORS v aluable asset, although they are
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS
contracting directly w ith an ow ner. THE DOCUMENTS
rarely recognized for their
PROFESSIONAL PROFESSIONAL immense contribution.
CONCLUSION CONCLUSION

CEELB230

CEELB230
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
CONTRACT I NTRODUCTION

MA IN POINTS
FIDIC CONTRACTS
 THE TEAM
A legally enforceable agreement,  THE TEAM All FIDIC contracts therefore contain
APPROACH APPROACH
guidance on the preparation of Particular
 PROJECT OWNER usually in written form, between two or  PROJECT OWNER
Conditions, and provide examples of the areas
 DESIGN more parties to do or not to do  DESIGN
where special provisions may be required for a
PROFESSIONAL PROFESSIONAL
something specified. specific project. To diverge significantly from
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS PROFESSIONALS these guidelines is to increase the risk of shifting
 CONTRACTORS  CONTRACTORS the balanced nature of the contract, and
 UNDERSTANDING  UNDERSTANDING putting into jeopardy
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL
the successful
implementation
CONCLUSION CONCLUSION of the project.
CEELB230

CEELB230
ht t ps://www.pngwing.com ht t ps://www.aceris law.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

8
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
FIDIC BOOKS I NTRODUCTION

MA IN POINTS
FIDIC BOOKS
 THE TEAM GREEN BOOK  THE TEAM RED BOOK
APPROACH APPROACH
 PROJECT OWNER The Short Form of Contract is intended for  PROJECT OWNER Red Book- Conditions of Contract for
 DESIGN  DESIGN
PROFESSIONAL
engineering and construction projects with a PROFESSIONAL
Construction For Building and Engineering
small capital value. he Green Book Guidance works designed by the Employer .

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS Notes recommend that it not be employed on PROFESSIONALS
 CONTRACTORS projects with a contract value higher than  CONTRACTORS
 UNDERSTANDING US$500,000.  UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL

CONCLUSION CONCLUSION

CEELB230

CEELB230
ht t ps://www.aceris law.com ht t ps://www.aceris law.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0


D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
FIDIC BOOKS I NTRODUCTION

MA IN POINTS
FIDIC BOOKS
 THE TEAM YELLOW BOOK  THE TEAM ORANGE BOOK
APPROACH APPROACH
 PROJECT OWNER provides contract conditions for construction  PROJECT OWNER Orange Book- Conditions of Contract for
 DESIGN  DESIGN
PROFESSIONAL
works where the Contractor carries out the PROFESSIONAL
Design-Build and Turnkey. The Orange Book is
design. The Yellow Book applies to the provision intended for usage in scenarios where the
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS of mechanical and/or electrical plants, and for PROFESSIONALS contractor is solely responsible for the design.
 CONTRACTORS the design and execution of engineering or  CONTRACTORS Such single-point responsibility may be
 UNDERSTANDING building or works..  UNDERSTANDING advantageous for the Employer, but the
THE DOCUMENTS THE DOCUMENTS benefits may be countered by having less
PROFESSIONAL PROFESSIONAL
influence over the design process and greater
CONCLUSION CONCLUSION difficulty implementing different requirements.
CEELB230

CEELB230
ht t ps://www.aceris law.com ht t ps://www.aceris law.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

9
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
FIDIC BOOKS I NTRODUCTION

MA IN POINTS
FIDIC BOOKS
 THE TEAM SILVER BOOK  THE TEAM GOLD BOOK
APPROACH APPROACH
 PROJECT OWNER Silver Book- Conditions of Contract for  PROJECT OWNER Gold Book- Conditions of Contract for Design,
 DESIGN  DESIGN
PROFESSIONAL
EPC/Turnkey Projects. The Silver Book is PROFESSIONAL
Build and Operate Projects. The Gold Book
appropriate for use in the process, power, and adopts a "green-field" DBO scenario with a 20-

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS private infrastructure projects where a PROFESSIONALS year operation period and a single contract
 CONTRACTORS Contractor will assume complete responsibility  CONTRACTORS awarded to a single contracting entity (which
 UNDERSTANDING for the project's design and execution.  UNDERSTANDING will almost certainly be a joint venture or
THE DOCUMENTS THE DOCUMENTS consortium) to optimize the coordination of
PROFESSIONAL PROFESSIONAL
innovation, quality, and performance.
CONCLUSION CONCLUSION

CEELB230

CEELB230
ht t ps://www.aceris law.com ht t ps://www.aceris law.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0


D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
CONTRACT I NTRODUCTION

MA IN POINTS
CONTRACT
 THE TEAM
APPROACH
DOCUMENTS  THE TEAM
APPROACH
DOCUMENTS
 PROJECT OWNER  PROJECT OWNER
 DESIGN The legal documents comprising a  DESIGN
PROFESSIONAL construction contract, including the owner- PROFESSIONAL
contractor agreement, conditions of the
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS PROFESSIONALS
contract, and the construction drawings and
 CONTRACTORS  CONTRACTORS
specifications for the project,
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS including all addenda, THE DOCUMENTS
PROFESSIONAL modifications, and any PROFESSIONAL
other items stipulated as
CONCLUSION CONCLUSION
CEELB230

CEELB230
ht t ps://www.pngwing.com being specifically

1-2 1-2
included.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

10
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
CONTRACT I NTRODUCTION

MA IN POINTS
CONTRACT
 THE TEAM
APPROACH
DOCUMENTS  THE TEAM
APPROACH
DOCUMENTS
 PROJECT OWNER  PROJECT OWNER
COMPONENTS COMPONENTS
 DESIGN  DESIGN
PROFESSIONAL PROFESSIONAL
DRAWINGS ARCHITECTURAL DRAWINGS

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS The portion of the contract documents PROFESSIONALS The architectural drawings are prepared by
 CONTRACTORS showing in accurate graphical and pictorial  CONTRACTORS the architect and usually constitute the bulk of the
 UNDERSTANDING form the design, location, dimensions, and  UNDERSTANDING
set. They describe the ov erall aesthetics of the
THE DOCUMENTS relationships of the elements of a project. THE DOCUMENTS facility, including project size, shape, and
PROFESSIONAL PROFESSIONAL appearance. Detailed information
CONTRACT
regarding dimensions, materials,
CONCLUSION DRAWINGS. CONCLUSION

CEELB230

CEELB230
ht t p://www.livebinders .com ht t p://www.livebinders .com and quality are graphically
CONSTRUCTION

1-2 1-2
depicted through the
DRAWINGS. architectural drawings.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
ARCHITECTURAL I NTRODUCTION

MA IN POINTS
CONTRACT
 THE TEAM
APPROACH
DRAWING VICINITY MAP/ LOCATION PLAN
 THE TEAM
APPROACH
DOCUMENTS
 PROJECT OWNER  PROJECT OWNER
SITE DEVELOPMENT PLAN COMPONENTS
 DESIGN PERSPECTIVE  DESIGN
PROFESSIONAL PROFESSIONAL
FLOOR PLANS STRUCTURAL DRAWINGS
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS
ELEVATIONS PROFESSIONALS The structural drawings are prepared by a
 CONTRACTORS
SECTIONS  CONTRACTORS structural engineer working as a consultant to
 UNDERSTANDING
REFLECTED  UNDERSTANDING the architect. The structural drawings identify
THE DOCUMENTS CEILING PLANS THE DOCUMENTS the major components making up the
PROFESSIONAL DETAILS PROFESSIONAL
structural frame of the
SCHEDULE OF
CONCLUSION CONCLUSION building, such as columns,
CEELB230

CEELB230
https://www.cadtraininginstitute.com DOORS AND W INDOW S ht t p://www.livebinders .com
beams, and girders.

1-2 1-2
SCHEDULE OF
FINISHES
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

11
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
CONTRACT I NTRODUCTION

MA IN POINTS
CIVIL/STRUCTURAL
 THE TEAM
APPROACH
DOCUMENTS  THE TEAM
APPROACH
DRAWING
SI TE DEVELOPMENT PLAN
 PROJECT OWNER  PROJECT OWNER
COMPONENTS FOUNDATI ON PLANS AND DETAI LS
 DESIGN  DESIGN
PROFESSIONAL
CIVIL DRAWINGS
PROFESSIONAL FLOOR FRAMI NG

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS These drawings are usually prepared by a PROFESSIONALS
PLANS AND DETAI LS
 CONTRACTORS civil engineer working with the architect and  CONTRACTORS ROOF FRAMI NG
 UNDERSTANDING describe all items of work associated with the  UNDERSTANDING PLANS AND DETAI LS
THE DOCUMENTS site. The site work includes such things as THE DOCUMENTS
PROFESSIONAL PROFESSIONAL
grading, demolition,
CONCLUSION excavation, site utilities, CONCLUSION

CEELB230

CEELB230
ht t ps://www.pngegg.com
streets, curbs, and

WEEKS. 1-2
ht t p://www.livebinders .com
gutters and their details.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
CONTRACT I NTRODUCTION

MA IN POINTS
ELECTRICAL
 THE TEAM
APPROACH
DOCUMENTS  THE TEAM
APPROACH
DRAWING
 PROJECT OWNER  PROJECT OWNER
LOCATI ON AND SI TE PLAN
COMPONENTS LEGEND OR SYMBOLS
 DESIGN  DESIGN
PROFESSIONAL
ELECTRICAL DRAWINGS
PROFESSIONAL GENERAL NOTES
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS The electrical engineer, working as a PROFESSIONALS ELECTRI CAL LAYOUTS
 CONTRACTORS consultant to the architect, prepares the electrical  CONTRACTORS SCHEDULE OF LOADS,
drawings. The electrical work includes all of the
 UNDERSTANDING  UNDERSTANDING TRANSFORMERS,
THE DOCUMENTS rough wiring, transformers, and panel boxes, as THE DOCUMENTS
PROFESSIONAL well as receptacles, switches, PROFESSIONAL GENERATI NG/
and light fixtures. U.P.S. UNI TS
CONCLUSION CONCLUSION
CEELB230

CEELB230
ht t p://www.livebinders .com Communications and computer ht t ps://www.dos ign.com
ONE LI NE

1-2 1-2
wiring are also included in
DI AGRAM
the electrical drawings.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

12
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
CONTRACT I NTRODUCTION

MA IN POINTS
MECHANICAL
 THE TEAM
APPROACH
DOCUMENTS  THE TEAM
APPROACH
DRAWING
 PROJECT OWNER  PROJECT OWNER
LOCATI ON PLAN AND KEY PLAN
COMPONENTS GENERAL LAYOUT PLANS
 DESIGN  DESIGN
PROFESSIONAL
MECHANICAL DRAWINGS
PROFESSIONAL LONGI TUDI NAL AND

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS
The mechanical w ork splits betw een two major support
PROFESSIONALS
TRANSVERSE SECTI ONS
components for any building - the plumbing and the
 CONTRACTORS heating, ventilation, and air conditioning (HVAC). The  CONTRACTORS I SOMETRI C
 UNDERSTANDING plumbing portion of the draw ings typically includes  UNDERSTANDING DRAWI NGS
THE DOCUMENTS information describing the installation of w ater lines, sew er THE DOCUMENTS
PROFESSIONAL lines, and gas lines. The HVAC portion of the draw ings covers PROFESSIONAL
PLANS
ductw ork, air handlers, compressors, and other DETAI LED
CONCLUSION equipment associated w ith climate CONCLUSION

CEELB230

CEELB230
ht t p://www.livebinders .com
control. Fire protection can also
https://www.ukconstructionmedia.co.uk
DRAWI NGS

1-2 1-2
be included w ith the
WEEKS. mechanical draw ings.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
PLUMBING I NTRODUCTION

MA IN POINTS
SANITARY DRAWING
LOCATI ON PLAN
 THE TEAM
APPROACH
DRAWING  THE TEAM
APPROACH
AND SI TE PLAN
 PROJECT OWNER
LOCATI ON PLAN  PROJECT OWNER
DETAI LED PLAN AND
 DESIGN AND SI TE PLAN  DESIGN LAYOUT DRAWI NGS
PROFESSIONAL PLUMBI NG PROFESSIONAL

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS
PLANS, LAYOUTS, PROFESSIONALS
 CONTRACTORS AND DETAI LS  CONTRACTORS
 UNDERSTANDING LEGEND AND  UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL
GENERAL NOTES PROFESSIONAL
I SOMETRI C
CONCLUSION CONCLUSION
CEELB230

CEELB230
ht t ps://www.reddit.com
DRAWI NGS ht t ps://www.i-green.my

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

13
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
ELECTRONICS I NTRODUCTION

MA IN POINTS
GEODETIC DRAWING
VI CI NITY MAP/ LOCATI ON MAP
 THE TEAM
APPROACH
DRAWING  THE TEAM
APPROACH
LOT PLAN
 PROJECT OWNER
GENERAL LAYOUT PLANS  PROJECT OWNER
RELOCATI ON SURVEY PLAN
 DESIGN WI TH LEGENDS  DESIGN LI NE AND GRADE
PROFESSIONAL SI NGLE LI NE DI AGRAM PROFESSIONAL DETAI LED

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS
RI SER DI AGRAM PROFESSIONALS
TOPOGRAPHI C
 CONTRACTORS I SOMETRY  CONTRACTORS PLAN
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL

CONCLUSION CONCLUSION

CEELB230

CEELB230
ht t ps://www.sciencenewsforstud
ht t ps://www.buildas iabd.com
ent s .org

||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0


D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
CONTRACT I NTRODUCTION

MA IN POINTS
PROJECT MANUAL
 THE TEAM
APPROACH
DOCUMENTS  THE TEAM
APPROACH
SECTIONS

 PROJECT OWNER
COMPONENTS  PROJECT OWNER BIDDING DOCUMENTS
 DESIGN  DESIGN I NVI TATI ON FOR BI DS
PROFESSIONAL PROFESSIONAL
PROJECT MANUAL I NSTRUCTI ON TO BI DDERS
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
The project manual is the second part of the
PROFESSIONALS PROFESSIONALS BI D FORMS
CONTRACTORS contract documents. The project manual contains CONTRACTORS

all the written construction documents about the

AGREEMENT FORM
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS structure to be built. Those documents include THE DOCUMENTS
PROFESSIONAL the bidding requirements, PROFESSIONAL
contracting requirements,
CONCLUSION CONCLUSION
CEELB230

CEELB230
ht t p://www.livebinders .com and written specifications for ht t ps://npo.gov.ph Sa mpl e Bidding Documents:

1-2 1-2
ev ery detail of the building. Invi ta tion to bi d.pdf

WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

14
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
PROJECT MANUAL I NTRODUCTION

MA IN POINTS
PROJECT MANUAL
 THE TEAM SECTIONS  THE TEAM SECTIONS
APPROACH APPROACH
 PROJECT OWNER GENERAL CONDITIONS  PROJECT OWNER GENERAL CONDITIONS
 DESIGN GENERAL PROVISIONS  DESIGN PAYMENTS AND COMPLETION
PROFESSIONAL OWNER RESPONSIBILITIES PROFESSIONAL PROTECTION OF PERSONS

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION CONTRACTOR RESPONSIBILITIES  CONSTRUCTION AND PROPERTY
PROFESSIONALS PROFESSIONALS
ADMINISTRATION OF THE CONTRACT INSURANCE AND BONDS
 CONTRACTORS  CONTRACTORS
SUBCONTRACTS AND UNCOVERING AND
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS
SUBCONTRACTOR RELATIONS THE DOCUMENTS
CORRECTION OF WORK
PROFESSIONAL SAMPLE: 22-00071-
CONSTRUCTION BY OWNER PROFESSIONAL MISCELLANEOUS PROVISIONS
PROPOSED-CONSTRUCTION- OR OTHERS TERMINATION OR
CONCLUSION CONCLUSION

CEELB230

CEELB230
ht t ps://www.ccicsg.com OF-THREE-3-–-STOREY- CHANGES IN THE WORK ht t ps://www.ccicsg.com SUSPENSION OF

1-2 1-2
MULTI-PURPOSE-BUILDING-
PHASE-1-AT-BARANGAY- TIME AND SCHEDULE THE CONTRACT
REQUIREMENTS
WEEKS. PROJECT-6.pdf
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
PROJECT MANUAL I NTRODUCTION

MA IN POINTS
PROJECT MANUAL
 THE TEAM SECTIONS  THE TEAM SECTIONS
APPROACH APPROACH
 PROJECT OWNER SUPPLEMENTAL CONDITIONS  PROJECT OWNER TECHNICAL SPECIFICATIONS
DESIGN
Soils and soil-testing information DESIGN

PROFESSIONAL
prov ided by the owner.

PROFESSIONAL
Quality of materials.
Surv ey information provided by the owner. Standard of w orkmanship.
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
Materials or other serv ices
PROFESSIONALS
prov ided by the owner.
PROFESSIONALS Methods of installation
CONTRACTORS CONTRACTORS
 Job signage requirements. 
and erection.
 UNDERSTANDING Traffic control and pedestrian  UNDERSTANDING
THE DOCUMENTS safety requirements. THE DOCUMENTS Quality control
PROFESSIONAL Phasing or special schedule PROFESSIONAL and quality
requirements. assurance
CONCLUSION CONCLUSION
CEELB230

CEELB230
ht t ps://www.ccicsg.com Requirements for security. ht t ps://apro-s oftware.com
procedures.
1-2 1-2
Temporary facilities and
sanitation requirements.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

15
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
SPECIFICATIONS I NTRODUCTION

MA IN POINTS
SPECIFICATIONS
 THE TEAM  THE TEAM TYPES
APPROACH
The part of the contract APPROACH
 PROJECT OWNER documents consisting of a detailed  PROJECT OWNER PERFORMANCE SPECI FI CATI ON
 DESIGN description of the technical nature of the  DESIGN DESCRI PTI VE SPECI FI CATI ON
PROFESSIONAL PROFESSIONAL
materials, standards, and quality of REFERENCE SPECI FI CATI ON

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS execution of the work to be placed PROFESSIONALS PROPRI ETARY SPECI FI CATI ON
 CONTRACTORS under contract.  CONTRACTORS
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL

CONCLUSION CONCLUSION

CEELB230

CEELB230
ht t ps://www.clipartkey.com https://imelearner.wordpress.com
ht t ps://www.123rf.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0


D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
SPECIFICATIONS I NTRODUCTION

MA IN POINTS
SPECIFICATIONS
 THE TEAM TYPES  THE TEAM TYPES
APPROACH APPROACH
 PROJECT OWNER DESCRIPTIVE SPECIFICATION  PROJECT OWNER PERFORMANCE SPECIFICATION
 DESIGN  DESIGN
PROFESSIONAL PROFESSIONAL
- Defines properties of materials -Specifies required results and
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS and methods of installation PROFESSIONALS criteria used to v erify
CONTRACTORS CONTRACTORS

w ithout propriety information. 
performance. The contractor is
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS free to find materials complying
PROFESSIONAL PROFESSIONAL w ith the performance criteria.
CONCLUSION CONCLUSION
CEELB230

CEELB230
https://imelearner.wordpress.com https://imelearner.wordpress.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

16
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
SPECIFICATIONS I NTRODUCTION

MA IN POINTS
SPECIFICATIONS
 THE TEAM TYPES  THE TEAM TYPES
APPROACH APPROACH
 PROJECT OWNER REFERENCE SPECIFICATION  PROJECT OWNER PROPRIETARY SPECIFICATION
 DESIGN  DESIGN
PROFESSIONAL PROFESSIONAL
-Requires products or process to -specifies brand names, models

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS meet established standards. PROFESSIONALS and other proprietary
CONTRACTORS CONTRACTORS
 
information.
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS THE DOCUMENTS
PROFESSIONAL PROFESSIONAL

CONCLUSION CONCLUSION

CEELB230

CEELB230
https://imelearner.wordpress.com https://imelearner.wordpress.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0


D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
1995 CSI I NTRODUCTION

MA IN POINTS
1995 CSI
 THE TEAM
APPROACH
MASTERFORMAT  THE TEAM
APPROACH
MASTERFORMAT
 PROJECT OWNER  PROJECT OWNER 16-DIVISION UNIFORM
 DESIGN A format developed by the  DESIGN CONSTRUCTION INDEX
PROFESSIONAL Construction Specifications Institute for PROFESSIONAL
Division 1: General
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
coordinating specifications, filing of
PROFESSIONALS PROFESSIONALS Requirements
CONTRACTORS technical data and product literature, and CONTRACTORS
 
Division 2: Site Work
 UNDERSTANDING construction cost accounting, organized  UNDERSTANDING
THE DOCUMENTS into 16 divisions based THE DOCUMENTS Division 3: Concrete
PROFESSIONAL
on an interrelationship
PROFESSIONAL Division 4: Masonry
CONCLUSION of material, trade, CONCLUSION
CEELB230

CEELB230
ht t p://www.livebinders .com ht t p://clipart -library.com

1-2 1-2
or function.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

17
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
1995 CSI I NTRODUCTION

MA IN POINTS
1995 CSI
 THE TEAM
APPROACH
MASTERFORMAT  THE TEAM
APPROACH
MASTERFORMAT
 PROJECT OWNER 16-DIVISION UNIFORM  PROJECT OWNER 16-DIVISION UNIFORM
 DESIGN CONSTRUCTION INDEX  DESIGN CONSTRUCTION INDEX
PROFESSIONAL PROFESSIONAL
Division 5: Metals Division 9: Finishes

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS Division 6: Wood and PROFESSIONALS Division 10: Specialties
CONTRACTORS CONTRACTORS

Plastics 
Division 11: Equipment
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS Division 7: Thermal and THE DOCUMENTS Division 12: Furnishings
PROFESSIONAL Moisture Protection PROFESSIONAL

CONCLUSION Division 8: Doors and CONCLUSION

CEELB230

CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com
Windows
WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
1995 CSI I NTRODUCTION

MA IN POINTS
THREE-PART
 THE TEAM
APPROACH
MASTERFORMAT  THE TEAM
APPROACH
SECTION FORMAT
 PROJECT OWNER 16-DIVISION UNIFORM  PROJECT OWNER
PARTS
 DESIGN CONSTRUCTION INDEX  DESIGN
PROFESSIONAL PROFESSIONAL
Division 13: Special PART 1: General
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS Construction PROFESSIONALS PART 2: Products
CONTRACTORS CONTRACTORS

Division 14: Conv eying 
PART 3: Execution
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS Systems THE DOCUMENTS
PROFESSIONAL Division 15: Mechanical PROFESSIONAL

CONCLUSION Division 16: Electrical CONCLUSION


CEELB230

CEELB230
ht t p://clipart -library.com ht t ps://depos itphotos.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

18
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
THREE-PART I NTRODUCTION

MA IN POINTS
THREE-PART
 THE TEAM
APPROACH
SECTION FORMAT  THE TEAM
APPROACH
SECTION FORMAT
 PROJECT OWNER  PROJECT OWNER
PARTS PARTS
 DESIGN  DESIGN
PROFESSIONAL PROFESSIONAL
PART 1: General PART 2: Product

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS PROFESSIONALS
CONTRACTORS CONTRACTORS

Defines the specific 
Describes, in details the
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS and procedural THE DOCUMENTS quality of items that
PROFESSIONAL requirements unique to PROFESSIONAL are required for
CONCLUSION this section. CONCLUSION incorporation into the

CEELB230

CEELB230
ht t ps://depos itphotos.com ht t ps://depos itphotos.com
project under this
WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 section.
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
THREE-PART I NTRODUCTION

MA IN POINTS
2004 CSI
 THE TEAM
APPROACH
SECTION FORMAT  THE TEAM
APPROACH
MASTERFORMAT
 PROJECT OWNER  PROJECT OWNER
PARTS In 2001, a task team with associates from both
 DESIGN  DESIGN
PROFESSIONAL PROFESSIONAL the CSI and the Construction Specifications Canada
PART 3: Execution (CSC) was charged with examining whether there
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS PROFESSIONALS was a need to rev ise and possibly expand the 16
CONTRACTORS CONTRACTORS div ision edition in response to the many changes that

Describes, in details the 
had taken place in the industry. The 2004 v ersion
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS preparatory actions THE DOCUMENTS composed of
PROFESSIONAL and how the products PROFESSIONAL (1) General Requirements,
(2) Facility Construction,
CONCLUSION are incorporated into CONCLUSION
CEELB230

CEELB230
ht t ps://depos itphotos.com ht t p://www.livebinders .com (3) Facility Services,
project.
1-2 1-2
(4) Site and Infrastructure,
and (5) Process Equipment.
WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

19
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
2004 CSI I NTRODUCTION

MA IN POINTS
2004 CSI
 THE TEAM
APPROACH
MASTERFORMAT  THE TEAM
APPROACH
MASTERFORMAT
 PROJECT OWNER  PROJECT OWNER
ADVANTAGES ADVANTAGES
 DESIGN  DESIGN
PROFESSIONAL PROFESSIONAL
 Provides a standard

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS fixed framework for PROFESSIONALS  Serves as a
CONTRACTORS CONTRACTORS

organizing 
sequencing guide for
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS specifications. THE DOCUMENTS arranging
PROFESSIONAL PROFESSIONAL specification section
CONCLUSION CONCLUSION

CEELB230

CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0


D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
2004 CSI I NTRODUCTION

MA IN POINTS
2004 CSI
 THE TEAM
APPROACH
MASTERFORMAT  THE TEAM
APPROACH
MASTERFORMAT
 PROJECT OWNER  PROJECT OWNER GENERAL REQUIREMENTS
ADVANTAGES
 DESIGN  DESIGN SUB-GROUP
PROFESSIONAL PROFESSIONAL
Division 1: General
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS  Provides easy PROFESSIONALS Requirements
CONTRACTORS CONTRACTORS

retrieval of 
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS information THE DOCUMENTS
PROFESSIONAL PROFESSIONAL

CONCLUSION CONCLUSION
CEELB230

CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com

WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

20
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
2004 CSI I NTRODUCTION

MA IN POINTS
2004 CSI
 THE TEAM
APPROACH
MASTERFORMAT  THE TEAM
APPROACH
MASTERFORMAT
 PROJECT OWNER FACILITY CONSTRUCTION  PROJECT OWNER FACILITY CONSTRUCTION
 DESIGN SUB-GROUP  DESIGN SUB-GROUP
PROFESSIONAL PROFESSIONAL
Division 2: Existing Conditions Division 9: Finishes

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS Division 3: Concrete PROFESSIONALS Division 10: Specialties
 CONTRACTORS Division 4: Masonry  CONTRACTORS Division 11: Equipment
 UNDERSTANDING Division 5: Metals  UNDERSTANDING Division 12: Furnishings
THE DOCUMENTS Division 6: Wood, Plastics, THE DOCUMENTS Division 13: Special
PROFESSIONAL PROFESSIONAL
and Composites Construction
CONCLUSION Division 7: Thermal and CONCLUSION Division 14: Conveying

CEELB230

CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com
Moisture Protection Systems

WEEKS. 1-2 Division 8: Openings


||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 Divisions 15 - 19: (Reserved)
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
2004 CSI I NTRODUCTION

MA IN POINTS
2004 CSI
 THE TEAM
APPROACH
MASTERFORMAT  THE TEAM
APPROACH
MASTERFORMAT
 PROJECT OWNER FACILITY SERVICES  PROJECT OWNER FACILITY SERVICES
 DESIGN SUB-GROUP  DESIGN SUB-GROUP
PROFESSIONAL PROFESSIONAL
Division 20: (Reserv ed) Division 25: I ntegrated
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS Division 21: Fire Supression PROFESSIONALS Automation
CONTRACTORS CONTRACTORS

Division 22: Plumbing 
Divisions 26: Electrical
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS Division 23: Heating, THE DOCUMENTS Division 27: Communications
PROFESSIONAL Ventilating, and PROFESSIONAL Division 28: Electronic
CONCLUSION Air Conditioning CONCLUSION Safety and Security
CEELB230

CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com
Division 24: (Reserv ed) Division 29: (Reserv ed)
WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0

21
Wednesday, November 13, 2019

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
2004 CSI I NTRODUCTION

MA IN POINTS
2004 CSI
 THE TEAM
APPROACH
MASTERFORMAT  THE TEAM
APPROACH
MASTERFORMAT
 PROJECT OWNER SITE AND INFRASTRUCTURE  PROJECT OWNER PROCESS EQUIPMENT
 DESIGN SUB-GROUP  DESIGN SUB-GROUP
PROFESSIONAL PROFESSIONAL
Division 30: (Reserved) Divisions 40 - 43: Process I ntegration,

SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS Divisions 31: Earthwork PROFESSIONALS Material Processing and Handling
CONTRACTORS Division 32: Exterior CONTRACTORS
 
Equipment; Process Heating,
 UNDERSTANDING Improvements  UNDERSTANDING
THE DOCUMENTS Division 33: Utilities THE DOCUMENTS Cooling, and Drying
PROFESSIONAL
Division 34: Transportation
PROFESSIONAL Equipment; and Process
CONCLUSION Division 35: Waterway and CONCLUSION Gas and Liquid Handling,

CEELB230

CEELB230
ht t p://clipart -library.com ht t p://clipart -library.com
Marine Construction Purification, and
WEEKS. 1-2 Divisions 36 - 39: (Reserved)
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0 WEEKS. 1-2 Storage Equipment
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||D.S.CABACUNGAN:VER.1.R.1.0
D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

D.S.CABACUNGAN:VER.1.0||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
I NTRODUCTION

MAIN POINTS
2004 CSI I NTRODUCTION

MA IN POINTS
REFERENCES
MASTERFORMAT
Jackson, B.J. (2010). Construction Management
 THE TEAM  THE TEAM JumpStart. (2nd Edition). Indianapolis, Indiana: W iley
APPROACH APPROACH Publishing, Inc.
 PROJECT OWNER PROCESS EQUIPMENT  PROJECT OWNER
 DESIGN SUB-GROUP  DESIGN
PROFESSIONAL PROFESSIONAL
Divisions 44: Pollution
SPECIALIZATION 3

SPECIALIZATION 3
 CONSTRUCTION  CONSTRUCTION
PROFESSIONALS Control Equipment PROFESSIONALS
CONTRACTORS CONTRACTORS

Division 45: I ndustry-Specific 
 UNDERSTANDING  UNDERSTANDING
THE DOCUMENTS Manufacturing Equipment THE DOCUMENTS
PROFESSIONAL Divisions 46 - 47: (Reserv ed) PROFESSIONAL

CONCLUSION Division 48: Electrical CONCLUSION


CEELB230

CEELB230
ht t p://clipart -library.com
Power Generation
WEEKS. 1-2 Division 49: (Reserv ed)