High-priority Low Priority Co-location

S.No Site Load load load


(KW) (KW) (KW)

1 Regional Directorate 8 5 0
2 OSP Central 2 1.5 0
3 MSAG /OSP Sibi 3.7 0.5 5.4
4 MSAG /OSP Brewery 3.74 3 10.56
5 MSAG /OSP Khuzdar 1.8 0.4 0.44
Solar Panels Batteries
Load to be
Total Load
shifted to
(KW) No of
solar energy No of panels
Cost batteries Cost
& Specs
and Specs

13 8
3.5 2
9.6 9.1
17.3 14.3
2.64 2.24
Total
Mounting Annual electricity
Accessories Installation Estimated
Structure bill
Cost
Payback
period