You are on page 1of 8

1. Line 24” -P1001225 and 24” -P1001226 at EL 100.582 w.r.

t Tie in TP-
001A / B
Horizontal distance

CGL48-MEC-006060-1001-PP-GAD-0014-01

CGL48-MEC-006060-1001-PP-GAD-0081-09
Proposed 24” -P110225-61440 location w.r.t existing lines

MEC finding
Drg No Tie In Horizontal Horizontal w.r.t Existing Difference
Distance Distance (drg)
(Site)
CGL48-MEC-006060- TP-001A 9470 9500 24”-P110301- 30mm
1001-PP-GAD-0014-01 61440
CGL48-MEC-006060- b/w tie in 9475 9500 24”-P110301- 25mm
1001-PP-GAD-0081-09 TP-001A 61440
and TP-
001B
CGL48-MEC-006060- TP-001B 9365 9500 24”-P110301- 135mm
1001-PP-GAD-0081-09 61440
Conclusion : - average 100mm to be adjusted.
CONCLUSION

MEC Propose following


• new line 24” -P1001225 tie in to be done suit to site condition w.r.t Tie-in TP-001A and TP-001B
• difference in distance to be adjusted in 1075mm pipe spool piece at site (highlighted in red box),
keeping new lines24” -P1001226 @ EL 100.582 in the same location as per drg.
24” -P1001226 at EL 103.500 w.r.t Tie in TP-001C

Proposed 24” -P110225-61440 location w.r.t existing lines

MEC finding
Drg No Tie In Horizontal Horizontal w.r.t Existing difference
Distance Distance (drg)
(Site)
CGL48-MEC-006060- TP-001C 4970 5000 24”-P110301- 30mm
1001-PP-GAD-0081-09 61440

MEC Propose following


• new line 24” -P1001226 at EL 103.500 to be kept at 6000mm as per approved drawing w.r.t tie in
TP-001C as per drg.
2. ELEVATION DIFFRENCE w.r.t SITE and Drg.

• SL-02888 EL near TP-001A

All New pipe supports EL 100.582 to be matched with 100.568.


MEC proposes
o increase founding depth by 14mm for pre cast sleepers . Changes can be reflected in RLMU.
o for cast in situ maintain TOS EL 100.568.Changes can be reflected in RLMU.
o T-support 2”-G100168-11502 and 2”-B-1001201 to be adjusted with shim plates (PS-03593/ 03594)
to maintain same elevation of blowdown line based on its tie in elevation.
o Supports attached to sleeper remain as it is PS-02903, 02659, 02936, 02937. Only TOS shall reduce
by 14mm. No change in fabrication lengths.
o Pipe 2”-G100168 from sleeper to be adjusted with shim plates for SL-02874
o Dummy support PS-03964 to be lowered by 14mm
Dummy support PS-03964 to be lowered by 14mm
• SL/ PS -02886 and 02884 EL near TP-001C

o MEC proposes increase founding depth by 5 mm for pre cast


sleepers .

Civil foundation
Setting out to follow attached drg w.r.t existing pipe supports.
C.L OF 24" PIPE

3841

4500
4327

C.L OF 24" PIPE (NEW)


2346

C.L OF 24" PIPE (NEW)


150

C.L OF 24" PIPE (NEW) C.L OF 24" PIPE (NEW)


975

475

14000

X X X X X X X X X X