The daily report details matting board operations for PT. PERTAMINA PDC on June 27, 2022. It notes that the rig dismantled 2 pieces of damaged matting board at the PNC-P05 location. In total, 149 locking pins were damaged, all of the TCT brand, while no pins from other brands were affected. Photographic evidence of the damaged matting boards is included with the report.
The daily report details matting board operations for PT. PERTAMINA PDC on June 27, 2022. It notes that the rig dismantled 2 pieces of damaged matting board at the PNC-P05 location. In total, 149 locking pins were damaged, all of the TCT brand, while no pins from other brands were affected. Photographic evidence of the damaged matting boards is included with the report.
The daily report details matting board operations for PT. PERTAMINA PDC on June 27, 2022. It notes that the rig dismantled 2 pieces of damaged matting board at the PNC-P05 location. In total, 149 locking pins were damaged, all of the TCT brand, while no pins from other brands were affected. Photographic evidence of the damaged matting boards is included with the report.