You are on page 1of 16

IDENTITY :

AS BUILT DRAWING

TITLES :

PUTR
PANEL UTAMA TEGANGAN RENDAH

RFQ NO. :

PROJECT NAME :

KANTOR BANK MANDIRI REGION XIII JAWA 4


BEKASI - INDONESIA

PO NO. :

186596

CUSTOMER :

PT SURYA MARGA LUHUR

Revisi Customers : PO Number : Drawing No. :


Description Drawn Appr Date PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
AS BUILT DRAWING SJ SH 05.05.19 Project : Titles : Page : 1
Drawn : SJ Appr : HS KANTOR BANK MANDIRI REGION XIII JAWA 4 COVER Pages : 1
Date : 10.11.17 Date : 10.11.17 BEKASI - INDONESIA PUTR Rev. No. : 0
LIST OF CONTENT

No. Description Page Pages


1 COVER 1 1
2 LIST OF CONTENT 1 1
3 BILL OF MATERIALS 1 1
4 SCHEMATIC DIAGRAM 1 1 5
5 SCHEMATIC DIAGRAM 2 2 5
6 SCHEMATIC DIAGRAM 3 3 5
7 SCHEMATIC DIAGRAM 4 4 5
8 SCHEMATIC DIAGRAM 5 5 5
9 GENERAL ARRANGEMENT 1 1 8
10 GENERAL ARRANGEMENT 2 2 8
11 GENERAL ARRANGEMENT 3 3 8
12 GENERAL ARRANGEMENT 4 4 8
13 GENERAL ARRANGEMENT 5 5 8
14 GENERAL ARRANGEMENT 6 6 8
15 GENERAL ARRANGEMENT 7 7 8
16 GENERAL ARRANGEMENT 8 8 8

Revisi Customers : PO Number : Drawing No. :


Description Drawn Appr Date PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
AS BUILT DRAWING SJ SH 05.05.19 Project : Titles : Page : 1
Drawn : SJ Appr : HS KANTOR BANK MANDIRI REGION XIII JAWA 4 LIST OF CONTENT Pages : 1
Date : 10.11.17 Date : 10.11.17 BEKASI - INDONESIA PUTR Rev. No. : 0
BILL OF MATERIALS

No. Description Part No. Brand Quantity


A ENCLOSURE, CONSIST OF :
1 TYPE : SWITCHGEAR 3200A, 65KA, FULLY TYPE TESTED FORM 4 X-ENERGY EATON 1 LOT
INDEX PROTECTION : IP42
FINISHING : POWDER COATING RAL7035
DIMENSI : H2100 x W5400 x D1600 MM
MAIN BUSBAR : 3200A, 3x(10x80mm) PER PHASE

B INCOMING SECTION, CONSIST OF :


1 ACB 4P, 3200A, 65KA, FIXED TYPE IZMX40B4-V32F-MO EATON 2 EA
2 ELECTRICAL OPERATION +IZMX-M40-230AD EATON 2 EA
3 GROUND FAULT PROTECTION +IZMX-PXRV-G EATON 2 EA
4 AUTOMATIC CLOSED TRANSFER SWITCH 4P, 3200A ASCO S7000 ASCO 1 EA
5 DIGITAL POWER MONITORING (V, I, Hz, PF, kwh Multi Tarif, kvarh, kVah) HFPM-96F HEFFTRON 2 EA
6 PHASE MONITORING RELAY EMR5-W500-1-D EATON 2 EA
7 CT 3200/5A HG 120 - 3200 HOWIG 7 EA
8 PILOT LAMP DIA 22MM, LED, 220VAC M22-L EATON 6 EA
9 FUSE BLOCK + FUSE 2A FH32-S HOWIG 12 EA
10 NH FUSE 4P, 200A PM 1 EA
11 SURGE ARRESTER 120KA, 4P NSP60S4385TNSR EATON 1 EA

C OUTGOING SECTION, CONSIST OF :


1 MCCB 3P, 400-1000A, 50KA NZMN4-AE1000 EATON 1 EA
2 MCCB 3P, 80-100A, 50KA NZMN1-A100 EATON 2 EA
3 MCCB 3P, 63-80A, 50KA NZMN1-A80 EATON 2 EA
4 MCCB 3P, 40-50A, 50KA NZMN1-A50 EATON 1 EA
5 MCCB 3P, 25-32A, 50KA NZMN1-A32 EATON 1 EA
6 ACB 4P, 3200A, 65KA, FIXED TYPE IZMX40B4-V32F-MO EATON 1 EA
7 ELECTRICAL OPERATION FOR ACB +IZMX-M40-230AD EATON 1 EA
8 MCCB 3P, 400-1000A, 50KA NZMN4-AE1000 EATON 2 EA
9 MCCB 3P, 320-800A, 50KA NZMN4-AE800 EATON 2 EA
10 MCCB 3P, 80-100A, 50KA NZMN1-A100 EATON 3 EA
11 MCCB 3P, 63-80A, 50KA NZMN1-A80 EATON 2 EA
12 MCCB 3P, 20-25A, 50KA NZMN1-A25 EATON 1 EA
13 MCCB 3P, 16-20A, 50KA NZMN1-A20 EATON 1 EA
14 LBS 3P, 1600A SIRCO 3x1600 SOCOMEC 1 EA

D ACCESSORIES, CONSIST OF :
1 BUSBAR, CABLE, AND WIRING ACCESSORIES PT WSS 1 LOT

Revisi Customers : PO Number : Drawing No. :


Description Drawn Appr Date PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
AS BUILT DRAWING SJ SH 05.05.19 Project : Titles : Page : 1
Drawn : SJ Appr : HS KANTOR BANK MANDIRI REGION XIII JAWA 4 BILL OF MATERIALS Pages : 1
Date : 10.11.17 Date : 10.11.17 BEKASI - INDONESIA PUTR Rev. No. : 0
1 2 3 4 5 6 7 8

FROM TRAFO FROM GENSET


BUSDUCT 3200A BUSDUCT 3200A
A A
R S T N R S T N

R Y G R Y G

2A 2A 2A 2A

B B

ACB 4P ACB 4P
3200A DPM 3200A DPM
EMR5 EMR5
50KA & KWH 50KA & KWH
MOTORIZED MOTORIZED

C C
CT CT
3200/5A 3200/5A
ACTS 4P, 3200A

D D

NORMAL EMERGENCY

E LOAD
E

CT TO PF CONTROLLER
CAP. BANK 900KVAR
3200/5A
DWG. NO. 18.WSS.EL-1104-3
PAGE 01/4B

F F

R S T N
TO PAGE 02/1A
Revision Customer : PO Number : Drawing No. :
Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 1 2
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 3 LINE DIAGRAM Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA PUTR MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

FROM 01/4F
R S T N
A A

B MCCB MCCB MCCB MCCB MCCB MCCB MCCB B


3P 3P 3P 3P 3P 3P 3P
400-1000A 80-100A 80-100A 63-80A 63-80A 40-50A 25-32A
50KA 50KA 50KA 50KA 50KA 50KA 50KA

ACB 4P
3200A
C 50KA C
MOTORIZED

D D
MCCB MCCB MCCB MCCB MCCB MCCB MCCB
3P 3P 3P 3P 3P 3P 3P
80-100A 80-100A 80-100A 63-80A 63-80A 20-25A 16-20A
50KA 50KA 50KA 50KA 50KA 50KA 50KA

E E

MCCB MCCB MCCB MCCB LBS


3P 3P 3P 3P 3P
400-1000A 400-1000A 320-800A 320-800A 1600A
F 50KA 50KA 50KA 50KA F

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 2 2
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 3 LINE DIAGRAM Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA PUTR MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

FROM
A BUSDUCT 3200A A
TRAFO
R1 S1 T1 N1
R Y G

F1-F2-F3 (2A) F4-F5-F6 (2A)


F1 R1 R1 F4
V1

VOLTAGE
F2 S1 S1 F5
V2
F3 T1 T1 F6
V3
N1 N1 N1 N1 N1
B N B
N1
F7 F7-6A

DIGITAL ENERGY METERING


F7 R1

kWh 3Ph MULTI TARIFF


L

V, I, PF, Hz, kW, kVar,


SUPPLY
POWER
ACB 4P N

HFPM-96F
3200A
G
N1 F7 50KA
MOTORIZED

F7
C N L L1 L2 L3 25 1S1 STB1-4 1S11 C
11

I1
EASYPOW
RA

CURRENT
P/S 24VDC EMR5-W500-1-D 2S1 2S11
PHASE MONITOR 12

I2
- + -ING RELAY 26 28
3S1 3S11
CT
ST1 F7

I3
+24DC

+24DC

3200/5A
GND GND
D F7 D

ST SR 1 2 4 5 7 8 10
SR1.1
ST1.1

B1.1
B2.1
A2.1
A3.1
A11

B31

OPEN FROM
GENERAL
10

19 1 3 55 53 58 59 60 62 64 65 ALARM
SHUNT UNDER SPRING MOTOR AUXILIARY AUXILIARY AUXILIARY 24VDC
AUXILIARY CONTACT

A1
CONTROL VOLTAGE

TRIP VOLT- RELEA OPERA CONTACT CONTACT CONTACT


SUPPLY 24VDC

-AGE SE TOR ON/OFF 1 ON/OFF 2 ON/OFF 2


E E
TRIP UNIT

ON/OFF

C RA
LSI

ST UV SR
M A2

20 2 4 56 54 57 61 63
11
C1.1

C2.1

C3.1

N1 3 6 9 11 L11 L21 T31 N1


F N1 F
TO
ACTS NORMAL
SOURCE

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 1
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 SCHEMATIC DIAGRAM INCOMING PUTR Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA NORMAL SOURCE (TRAFO) MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

FROM
A BUSDUCT 3200A A
GENSET
R2 S2 T2 N2
R Y G

F8-F9-F10 (2A) F11-F12-F13 (2A)


F8 R2 R2 F11
V1

VOLTAGE
F9 S2 S2 F12
V2
F10 T2 T2 F13
V3
N2 N2 N2 N2 N2
B N B
N2
F14 F14-6A

DIGITAL ENERGY METERING


F14 R2

kWh 3Ph MULTI TARIFF


L

V, I, PF, Hz, kW, kVar,


SUPPLY
POWER
ACB 4P N

HFPM-96F
3200A
G
N2 F14 50KA
MOTORIZED

C N L L1 L2 L3 25 4S1 STB5-8 4S11 C

I1
EASYPOW
T TR

CURRENT
P/S 24VDC EMR5-W500-1-D 5S1 5S11
PHASE MONITOR

I2
- + -ING RELAY 26 28
6S1 6S11
CT
ST1.2
+24DC.2

+24DC.2

I3
3200/5A
GND GND
D D

10 11 13 14 16 17
SR1.2
ST1.2

A1.2
B1.2
B2.2
A2.2
A3.2
B3.2

19 1 3 55 53 58 59 60 62 64 65
SHUNT UNDER SPRING MOTOR AUXILIARY AUXILIARY AUXILIARY
AUXILIARY CONTACT
CONTROL VOLTAGE

TRIP VOLT- RELEA OPERA CONTACT CONTACT CONTACT


SUPPLY 24VDC

-AGE SE TOR ON/OFF 1 ON/OFF 2 ON/OFF 2


E E
TRIP UNIT

ON/OFF
LSI

ST UV SR
M

20 2 4 56 54 57 61 63
C1.2

C2.2

C3.2

N2 12 15 18 L12 L22 T32 N2


F N2 F
TO
ACTS NORMAL
SOURCE

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 2
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 SCHEMATIC DIAGRAM INCOMING PUTR Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA EMERGENCY SOURCE (GENSET) MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

FROM
A BUS #1 A

L13 L23 L33 N3

200A
B N3 B
F15-6A 200A
F15 L13

200A

200A
N3 F15 F15

C N L C
ACB 4P
EASYPOW 3200A
P/S 24VDC
C RF 50KA
- + MOTORIZED

D D

19 20 22 23 25 26
+24DC.2

+24DC.2

SR1.3
ST1.3

A1.3
B1.3
B2.3
A2.3
A3.3
B3.3

19 1 3 55 53 58 59 60 62 64 65
SHUNT UNDER SPRING MOTOR AUXILIARY AUXILIARY AUXILIARY
AUXILIARY CONTACT
CONTROL VOLTAGE

TRIP VOLT- RELEA OPERA CONTACT CONTACT CONTACT


SUPPLY 24VDC

-AGE SE TOR ON/OFF 1 ON/OFF 2 ON/OFF 2


E E
TRIP UNIT

ON/OFF
LSI

ST UV SR
M

20 2 4 56 54 57 61 63
C1.3

C2.3

C3.3

N3 21 24 27 L14 L24 T34 N4


F N3 F
TO
BUS #2

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 3
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 SCHEMATIC DIAGRAM PUTR Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA ACB BUSTIE MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

5400
800 800 1000 800 600 600 800
B B

TRAFO GENSET ACTS CAP. BANK

R Y G R Y G

SOCOMEC DIRIS A20 SOCOMEC DIRIS A20

C C

D D

E E

1 2 3 8 9 10 11

FRONT VIEW
F F

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 1 8
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 GENERAL ARRANGEMENT Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA FRONT VIEW PUTR MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

5400
600 800 600 800 1000 800 800
B B

BUS TIE

C C

EATON

D D

E E

7 6 5 4 3 2 1

REAR VIEW
F F

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 2 8
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 GENERAL ARRANGEMENT Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA REAR VIEW PUTR MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E
TOP VIEW

F F

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 3 8
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 GENERAL ARRANGEMENT Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA TOP VIEW PUTR MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B

C C

ACTS

D D

E E

1 2 3 8 9 10 11

F F

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 4 8
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 GENERAL ARRANGEMENT Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA INTERNAL FRONT VIEW PUTR MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B

C C

D D

E E

7 6 5 4 3 2 1

F F

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 5 8
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 GENERAL ARRANGEMENT Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA INTERNAL REAR VIEW PUTR MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

1600 1600

B B

C C
2100

2100
D D

E E
2 1

SIDE VIEW (GENSET) SIDE VIEW (TRAFO)

F F

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 6 8
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 GENERAL ARRANGEMENT Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA SIDE VIEW PUTR MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

1600 600 600

B B

C C
2100

2100
D D

E E
3 4 8

SIDE VIEW (ACTS) SIDE VIEW

F F

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 7 8
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 GENERAL ARRANGEMENT Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA SIDE VIEW PUTR MM 0
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

600 600 600 600 600 600

B B

C C
2100

2100

2100
D D

E E
5 9 6 10 7 11

SIDE VIEW SIDE VIEW SIDE VIEW

F F

Revision Customer : PO Number : Drawing No. :


Description Drawn Appr Date PT Wiguna Sarana Sejahtera PT SURYA MARGA LUHUR 186596 18.WSS.EL-1104-02
Scale Page
AS BUILT DRAWING SJ HS 05.05.19 Project : Titles :
NTS 8 8
Drawn by SJ Checked by HS KANTOR BANK MANDIRI REGION XIII JAWA 4 GENERAL ARRANGEMENT Units Revisi
Date 10.11.17 Date 10.11.17 BEKASI - INDONESIA SIDE VIEW PUTR MM 0
1 2 3 4 5 6 7 8