JHALARO WEIR
HYDRAULIC DESIGN OF WEIR
Input Data (SI Units)
Design Flood for 50 year return period Qflood 773.00 m3/sec
Design discharge over spillway Q = 773.00 m3/sec
Type Kp Type Ka
r ≤ 0.1T P1 0.02 A1 0.20
Selected P2 0.01 A2 0.10
0.5H0 ≥ r ≥ 0.15H0 P3 0.00 A3 0.00
Pier nosing shape: type no. P2 Kp = 0.01
Abutment shape: type no.A2 Ka = 0.10
Le L n 2 ( N * K p K a ) H d
Effective Length of clear water way Le = 149.581088 m
HYDRAULIC DESIGN OF WEIR
Spillway Design Head
Design head for spillway
H d 0 . 75 H o Hd .= 1.89 m
1 . 26
H d 0 . 41 H e Hd .= 1.04 m
Therefore selected design head for Weir Hd = 1.89 m
Vt = 7.74 m/sec
Va/Vt = 0.97
Actual velocity at chute channel entery Va = 7.51 m/sec
D2 toe = 2.77 m
2) 𝐿_𝑏=∝(𝐷_2−𝐷_1) L 8.50 m
=
∆𝐸⁄𝐸_1
Percentage Loss of Energy in Hyd. Jump = 18.49 %
𝐸_2=𝐸_1 (1−∆𝐸⁄𝐸_1 )
Specific Energy after Jump = 3.06 m
End Sill
h4/D1 = 1.25
Height of End Sill h4 = 1.10 m
Slope of face S = 2;1
HYDRAULIC DESIGN OF WEIR
Spillway discharge rating table at other than design head
1
X H o (Y ) n
Ho *k
Head over Discharge Crest Reservoir
Discharge
crest he/Ho C/Co coefficient Length elevation
m C m m3/sec m asl
HO
Crest Levation ELC α V 12 /2g
Z1
X1 Y1 ELW
P
ELB
α
.River Bed EL 26100
Input Data
Design Flood for 50 year return period Qflood 973.00
Design discharge over spillway Q = 973.00
Type Kp Type Ka
r ≤ 0.1T P1 0.02 A1 0.20
Selected P2 0.01 A2 0.10
0.5H0 ≥ r ≥ 0.15H0 P3 0.00 A3 0.00
Pier nosing shape: type no. P2 Kp = 0.01
Abutment shape: type no.A2 Ka = 0.10
HYDRAULIC DESIGN OF OVERFLOW SPILLWAY
Design flood based on 100year(1068 cumecs)
ΔH Total Energy Level
Le Ln 2( N * K p K a ) H d
Effective Length of clear water way Le = 149.560471
HO
Crest Levation ELC α V 12 /2g
Z1
X1 Y1 ELW
P
ELB
Vt = 7.96
Va/Vt = 0.95
Actual velocity at chute channel entery Va = 7.56
D2 toe = 3.06
Tmin/D1 = 2.75
Required minimum tail water
Z
depth Tmin = 3.00
1
Minimum factor of safety against jump sweep
X1 out Y1 ELW
FOS = 5
P
A minimum factor of safety of 5% is recommended for Type-II ELB
2) 𝐿_𝑏=∝(𝐷_2−𝐷_1) L = 8.86
∆𝐸⁄𝐸_1
Percentage Loss of Energy in Hyd. Jump = 14.28
𝐸_2=𝐸_1 (1−∆𝐸⁄𝐸_1 )
Specific Energy after Jump = 3.43
HYDRAULIC DESIGN OF OVERFLOW SPILLWAY
Design flood based on 100year(1068 cumecs)
ΔH Total Energy Level
Discharge intensity q = 6.5
Velocity at the end of basin V = 2.12
HO
Crest Levation ELC α V 12 /2g
End Sill
Z1
h4/D1 = 1.25
Height of End Sill P X1 Y1 ELW h4 = 1.36
Slope of face
ELB
S = 2;1
Spillway discharge rating table at other than design head
α
m C m m3/sec m asl
787.00
786.00
1; 785.50
785.00
charge (m asl)
784.00
787.00
786.00
HYDRAULIC DESIGN OF OVERFLOW SPILLWAY
1; 785.50
Design flood based on 100year(1068 cumecs)
785.00 ΔH Total Energy Level
Reservoir Surcharge (m asl)
784.00 H
O
Crest Levation ELC α V 12 /2g
783.00
Z1
X1 Y1 ELW
782.00 P
ELB
781.00
α
780.00
779.00
0.00 50.00 100.00 150.00 200.00 250.00 300.00 350.00 400.00 450
DISCHAGRE (Cumecs)
Ref (1) : Figure 12 Hydraulic design of stilling basin and Energy Dissipators by A.J. Peterka
Ref (2)Fig. 9.21 Factors for defination of nappe shaped crest profiles Book : Design of Small Dams By USBR
Total Length 70 m
Existing 48.8 m
Additional 21.2 m
m3/sec
m3/sec DISCHARGE SPILLWAY LENGTH
SURCHARGE
SR.NO.
m3/sec meters meters
m, amsl 1 973.00 50 5.08
m, amsl 2 973.00 60 4.50
m, amsl 3 973.00 70 4.06
4 973.00 80 3.71
m 5 973.00 90 3.43
m 6 973.00 100 3.20
m/sec2
784.46
Existing 48.8 m
Additional 21.2 m
m
m
m
m
m
m
m
m, amsl
m3/sec/m
m/sec
m
m 3.64
m 2.01
m3/sec
Existing 48.8 m
Additional 21.2 m
m, amsl
m
m/sec
m/sec
m asl
m asl
Existing 48.8 m
Additional 21.2 m
m
%
m asl
m asl
782.75
m
m asl
m asl
m
Existing 48.8 m
Additional 21.2 m
m /sec/m
3
m/sec
345
Existing 48.8 m
Additional 21.2 m
678.32 0.6971
294.68 0.3029
678.32 0.6971
294.68 0.3029
678.32 0.6971
294.68 0.3029
JHALARO WEIR
IRRIGATION CHANNEL HEAD REGULATOR
Input Data (SI Units)
Existing condition
Crest Level 1706.8 m asl
Side wall top Level 1709.5 m asl
Crest Width 2 m
Length of weir 1 48.8 m
Length of weir 2 60 m
Length of weir 3 70 m
50 year 773.00 150.00 1.7 2.09 783.59 779.50 15.00 150.00 780.00 782.69
1
100 year 973.00 150.00 1.7 2.44 783.94 779.50 15.00 150.00 780.00 783.10
Head over
Weir Name Flood Length of Weir Cd Crest Level HFL at Crest
crest (H)
m m
50 year 135.25 1.70 2.24 790.00 792.24
Wanderi Weir
100 year 135.25 1.70 2.62 790.00 792.62
50 year 131.14 1.70 2.29 786.00 788.29
Chutta Weir
100 year 131.14 1.70 2.67 786.00 788.67
50 year 132.14 1.70 2.28 782.00 784.28
Khaderi Weir
100 year 132.14 1.70 2.66 782.00 784.66
50 year 150.00 1.70 2.09 781.50 783.59
Jhalaro Weir
100 year 150.00 1.70 2.44 781.50 783.94
Acherwand 50 year 1.70 0.00
Weir 100 year 1.70 0.00 0.00
50 year 94.50 1.70 2.85 760.65 763.50
Sinjori Weir
100 year 94.50 1.70 3.32 760.65 763.97
50 year 1.70 0.00
Nurwah Weir
100 year 1.70 0.00 0.00
z HL
x
Depth Of Cut Off/Sheet Piles From Scour Considerations: d2 Ef2
Downstream
m asl
D/S Water Level 783.10
Discharge Intensity = q cms/m 6.49
λ 239.72
α 478.43
b ft 956.86
Pressure Calculations:
Let the floor thickness ft 1
Depth of U/S Curtain Wall ft -458.26
b ft 1053
1/α -0.435
From Khosla's Pressure Curves
λ 1.75
фD 0.641
фC 0.455
фD - фC 0.186
Correction For Depth 0.000 (+ve)
фC corrected 0.455
Depth of D/S Curtain Wall ft -449.86
693531375.xlsx 34
b ftHL 1053
1/α -0.427
From Khosla's Pressure Curves
λ 1.77
фE1 0.541
фD1 0.356
фE1- фD1 0.184
Correction For Depth 0.000 (-ve)
фE1 corrected 0.541
Toe Of Glacis Pressure 0.484
Floor Thickness:
Minimum Thickness of U/S Floor ft 1.00
Thickness Under the Crest B ft 1.25
Thickness Under The Toe Of Glacis C ft 6.50
Provide ft 6.50
% Pressure 0.498
ft 6.64
Provide Thickness 25% away From Glacis Toe ft 6.64
% Pressure 0.512
ft 6.83
Provide Thickness 50% away From Glacis Toe ft 6.83
% Pressure 0.527
ft 7.03
Summary
No.of bays 1
No. of Piers 0
Clear Waterway ft 70
693531375.xlsx 35
H 1
Ge
d
693531375.xlsx 36
693531375.xlsx 37
JHALARO WEIR
SCOUR DEPTH AND STONE APRON
Scour Depth
Input Data (SI Units)
Depth Of Cut Off/Sheet Piles From Scour Considerations:
Downstream
m asl
D/S Water Level 783.10
Discharge Intensity = q cms/m 6.49