Professional Documents
Culture Documents
Components of Project Quality Plan
Components of Project Quality Plan
4
4
More-Important
3.5
0
LEGEND
Additional Project Quality Plan (APQP)
• During the survey, few of our Project Engineers and Quality Inspectors
have added an additional project Quality plan metrics
• Recommended as more important level (4) for PQP
1 31 18 1
2 26 18 6
3 32 18
4 16 32 2
Project Quality Plan
5 36 14
6 26 18 4 2
7 8 24 16 2
8 32 18
9 24 20 6
10 32 14 4
11 30 16 4
12 36 8 6
13 16 22 12
14 16 26 6 2
15 18 22 10
16 24 22 4
No. of Personnel
A 5
B 8
Project Quality Plan
C 4
D 16
E 8
F 10
G 6
H 5
I 7
J 4
No. of Personnel
PQP Criteria 4
Project Quality Plan Structure and Criteria Scores
PQP CRITERIA
PROJECT QUALITY
NO PLAN (PQP)
4 3 2 1
STRUCTURE
Quality Objectives
1 31 18 01 00
and Principles
Project Quality
Management System,
2 26 18 06 00
Interfaces and
Controls
Organizational
3 Structure, Roles and 32 18 00 00
Responsibilities
Audits, Assessments,
4 16 32 02 00
and reviews
5 Engineering Quality 36 14 00 00
6 Procurement Quality 26 18 04 02
7 Logistics Quality 08 24 16 02
8 Construction Quality 32 18 00 00
9 Systems Completions 24 20 06 00
Management of
10 Change and Design 32 14 04 00
Control
Non-Conformance
11 Control and 30 16 04 00
Corrective Actions
Quality Documents,
12 36 08 06 00
Data and Records
Training /
13 Orientation / 16 22 12 00
Handover
Quality Reporting
14 16 26 06 02
and Metrics (KPI)
Regulatory
15 18 22 10 00
Requirements
Lessons Learned /
16 Continuous 24 22 04 00
Improvement
Quality Terminology Guidelines & Abbreviations
Quality Objectives and Principles
Moderate
1, 2%
Procurement Quality
Important MoreImportant
18, 36% 26, 52%
Quality Terminology Guidelines & Abbreviations
Less Important
0, 0%
Moderate
4, 8%
Important
16, 32%
More Important
30, 60%
Quality Terminology Guidelines & Abbreviations
Training / Orientation / Handover
Less Important, 0,
Moderate, 12, 24% 0%
More Important,
31, 62%
• VIRGIN Santiago A
• Quality Manager, EMIL, Dubai & Iraq
• Novriandi, Quality Coordinator, EMIL, Iraq
• Pradeesh, IT Analyst, Iraq
• Mrs Anu and Mr Naveen
Conclusions
• Project Quality plan structures and its priority of the contents are well recognised and thoroughly
evaluated with the impact of recent changes in the industrial expectations.
• An additional proposed project Quality plan structures are also judged for a significant
improvement on this study
• All datum are leading to make the customers/clients more gratified, if they see that the project
quality plan is being addressed at the initial stage of a project
• It can even be a good project report exercise, to bring them to a quality review process for a
continual improvement [kaizen].
• These studies were carried out generally in primitive areas of concern conducted by clients
previous implementation strategy to minimize these risks, criticality rating, readiness review and
more focus on competency skills, better reviews and alignment upfront before the work begins
• Finally, we are still exploring un-assessed and uncovered quality concerns which are challenging
milestone to achieve a suitable mechanism to shot these problems in point-blank range. There
should be a definite follow up process to deal with strategic approach to allocate and fix
EVERY ONE
WILL HAVE A VERY
PLEASANT DAY
THANKS TO ALL