FRONT ELEVATION SIDE ELEVATION GENERAL ARRANGEMENT

Saddle
S-2 S-3 S-4 S-5 S-6 S-1
2 Main Cables.
2 Main Cables
T-7 T-6 Saddle S
T-1
T-8 T-7 Top Element T
T-4
T-10 T-8
T-9

T-2 T-9 Intermediate Element


T-1 I

T-1

T-3 T-11 T-11 T-3

Intermediate Element I

Base Element B
E
Temporary Erection Element
I-5 3500
I-7

I-8

I-9
REQUIREMENT FOR ONE TOWER :
Number
I-1
Drawing Title Drawing of unit
I-2 No required
I-4 Tower Base Element 100N 1
I-6
Tower Intermidiate Element 110N 2
Tower Top Element 121N 1
300 300 400
Tower Saddle 135N 1
Tower Foundation 90N 1

I-3

B-2 B-3 B-4

HMG / Ministry of Local Development


DoLIDAR / Short SpanTrail Bridge Standard
Bridge Name:
B-1 B-5
No: Span:
B-1 Steel Drawing :
Top of Tower Foundation Temporary Tower No. 4
Erection Element
Assembly & Layout of Tower
(Slide Strut)
Height : 11.05 m , for 2 Main Cables
Width between Tower Legs = 3.50 m
3500
383 383 Date : September 30, 2002 Drawing No. 144N
Produced by Nepal Swiss Association for International Cooperation, in partnership with His Majesty’s Government of Nepal, funded and supported by the Swiss Government (SDC Nepal). 24