You are on page 1of 4

Wastage Analysis Report for the Month of April,2022

Day(s) Production Day(s) Production


SL Day(s) Wastage in Kg Wastage in MT
Qunatity in kg Qunatity in MT

01.04.22 to 02.04.2022 24282.4 24.2824 2191.3


1 2.1913
2 02.04.2022 to 04.04.2022 48564.9 48.5649 6453.6 6.4536
3 05.04.2022 to 06.04.2022 33518.42 33.51842 6253.3 6.2533
4 07.04.2022 to 09.04.2022 53483.9 53.4839 9127.1 9.1271
5 10.04.2022 to 11.04.2022 40358.54 40.35854 6035.4 6.0354
6 12.04.2022 to 13.04.2022 41227.59 41.22759 5831.2 5.8312
7 14.04.2022 to 16.04.2022 69082.08 69.08208 6843.3 6.8433
8 17.04.2022 to 18.04.2022 41260.52 41.26052 6395.2 6.3952
9 19.04.2022 to 20.04.2022 37540.11 37.54011 5912.7 5.9127
10 21.04.2022 to 23.04.2022 51688.31 51.68831 8156.3 8.1563
11 24.04.2022 to 25.04.2022 38164.79 38.16479 5933.5 5.9335
12 26.04.2022 22530.23 22.53023 2156.8 2.1568
13 27.04.2022 17162.05 17.16205 2375.3 2.3753
14 28.04.2022 22998.27 22.99827 2760.6 2.7606
15 29.04.2022 19270.19 19.27019 2497 2.497

16 30 .04.2022 9951.83 9.95183 2254 2.254

Total 571084.13 571.08413 81176.6 81.1766


A. Findings:
1. Average Wastage % in April
2022 14.41%

2. Total Wastage % in
April ,2022 14.21%

B. Wastage Breakup for 02 days (7-8th May,2022)


Wastage Break up
Day(s) Production in MT Process Wastage White Wastage Shade Wastage
% % %
in MT in MT in MT

07.05.2022 20.02 1.57 7.84216 0.11 0.54 0 0


08.05.2022 18.23 1.79 9.81 0.01 0.05 0 0
38.25 3.36 17.6522 0.12 0.59 0 0

C Observations:
1. On 30.04.2022 total production quantity has not been counted result of which wasatge % is showing excessive high. As a result uncounted FG has been shifted to next mo
quantity of FG has been higher for which wasatge % is found compratively lower than as usal day wise wastage % as shown in the days of the April Month.
2. There has been deviation in recording wastage by the production as reported. Wasatge % differs from early recording data to selling data for which prodcution is working
to provide accurate data so that early wastagew record & selling record become similar.
3. As per advice by OD wastage record will be maintained through 5 break up heads as shown above which will be record on daily , weekly and monthly basis to make action
Low (Standard)
Medium
High
Very High

Wastage % avg Remarks

9.02423154218693
13.2886096748887
18.6563089787645
17.0651354893716
14.9544557360103
14.1439264337304
9.90604220370898
15.4995622934466
15.7503534219799
15.7797768973294
15.5470526629388
9.57291603325843
13.8404211618076
12.0035115684788
12.9578379870671
Full Production(FG)
not counted. Some qty
shifted to May for
22.6491007181594 which it is showing
excessive higher

14.4149526751955
Break up
Oversized Total
Internal Rejection
% Wastage % Wastage Total
in MT
in MT in MT Wastage %
0 0 0.088 0.43 1.768 8.831168831
0 0 0.02 0.1 1.82 9.983543609
0 0 0.108 0.53 3.588

t uncounted FG has been shifted to next month May for which


e days of the April Month.
selling data for which prodcution is working to eliminate this bottleneck

ly , weekly and monthly basis to make action plan for minimization.

You might also like