RP-C2612 Due Inspection

*400 Hours / 12 Months Inspection – Scheduled Inspection

1. Replace lubrication oil in the tail rotor gearbox


2. Lubricate the inlet barrier filters

*600 Hours / 12 Months Inspection – Scheduled Inspection

3. Functional check of the swashplate tilt friction


4. Detailed inspection of the swashplate duplex bearing for rotational smoothness
5. Do a torque check of the tail rotor mast nut
6. Lubricate the driveshaft Couplings

*800 Hours/ 12 Months Inspection – Scheduled Inspection

Special detailed inspection of the forward lift frame

*800 Hours/ 24 Months – Scheduled Inspection

Detailed inspection of the blade bolts

*12 Months Inspection – Scheduled Inspection

Restoration (cleaning of hydraulic fluid)

*2 Years Inspection – Scheduled Inspection

1. Detailed inspection of the connector 4296p39 to include the backshell and the shielded braid sock
2. Detailed inspection of the connector 4296p44 to include the backshell and the shielded braid sock
3. Detailed inspection of the connector 3450tr1p4 to include attachment of the coaxial cable
4. Detailed inspection of the connector 3450tr2p4 to include attachment of the coaxial cable
5. Detailed inspection of the connector 4296j5 to include the backshell and the l/hirf braid sock
6. Detailed inspection of the connector 4296j2 to include the backshell and the l/hirf braid sock
7. Inspect/recertification of avionics components
8. Detailed inspection of the connector 3450tr1p1 to include attachment of the coaxial cable
9. Detailed inspection of the connector 3450tr1p3 to include attachment of the coaxial cable
10. Detailed inspection of the connector 3450tr1p5 to include attachment of the coaxial cable
11. Detailed inspection of the connector 3450tr1p6 to include attachment of the coaxial cable
12. Detailed inspection of the connector 3450tr1p7 to include attachment of the coaxial cable
13. Detailed inspection of the connector 3450tr2p1 to include attachment of the coaxial cable
14. Detailed inspection of the connector 3450tr2p3 to include attachment of the coaxial cable
15. Detailed inspection of the connector 3450tr2p6 to include attachment of the coaxial cable
16. Detailed inspection of the connector 3450tr2p7 to include attachment of the coaxial cable
17. Detailed inspection of the connector 3450tr2p5 to include attachment of the coaxial cable
18. Do a detailed inspection of the mast nut threads, mid cone seat, and hub drive spline of the mast
assembly
19. Do a general visual inspection of inner diameter of the mast assembly for corrosion and deterioration of
the primer
20. Detailed inspection of the cyclic longitudinal control tube assemblies
21. Detailed inspection of the cyclic lateral control tube assemblies
22. Detailed inspection of the cyclic lateral control bellcrank assemblies
23. Functional check of the collective, lateral, longitudinal, and directional servo actuators
*Service Bulletins

1. ASB 429-15-21 Rev A Part 2 - Bellcrank Assy Sched Insp, Introduction of. 429-001-523-101/103 and
429-001-532-101/-103
2. TB TB 429-18-56 - GTN 750/650 Nav/Com/GPS/ Series unit main software Ver 6.21, upgrade to

*Additional Inspection/ Service

1. Lubricate/ Grease No1 & No. 2 Hydraulic Pump


2. Aircomm Cabin Heater - 12 Mon Insp
3. Tailboom Aft - Torque Check
4. SDI - Internal Surface Vertical
5. ELT test
6. Transponder Test
7. ELT Antenna mounting plate crack – replacement of mounting plate

*Engine Inspection

1. Eng 1 & 2 Insp P3 Air Passager of shut-off valve for the presence of debris
2. Eng 1 & 2 - Insp P3 nipple on the output shafy cover for presence of debris
3. Eng 1 & 2 - check connector security and apply electrical contact